Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A construction suveyour using a steel tape is pulling a critcal measurement for layout of a building. The terrain in the in the immediate area does not allow for level measuring area. if the suveyour verifiies the diffence in elevation between the point measured from. and the point measured to, as 8.93 feet, and measurement pulled along the slope ground is 82 feet, 4 1/2 inches , What it would the horizontal distance between the two point be?
A weight W somewhere between 1 to 10 tons is randomly placed along a beam of 10m long span. Let X denote the distance from the point of applicatoin of the load to the nearest support.
A motorcycle sprocket on the rear wheel has a diameter of 24 cm, and trhe driver sprocket has a diameter of 4.0 cm. The driver sprocket shaft and rear axle are 60 cm apart.
On a 20 ft cantilever beam, Load W1=200 or W2=500 or both may be applied at the midpoint B or at the end of the beam C. The bending moment induced at th fixed support A, MA, will depend on the magnitude of the loads at B and C.
Determine the magnitude of reaction at point A (in kips) of a 20' beam with 5kips at 4' of the beam and 2kips at 9' of the beam at 350lbs./ft.
A concrete pipeline is installed to deliver 6m^3/sec of water (10degressC) between two reservoirs 17 km apart. If the elevation difference between the two reservoirs is 12m, what is the required pipe size
A volume of 1.5x106 m3 of water is then pumped out of the aquifer resulting in a decrease of the groundwater level to 208.8 m. Assuming that the water table in the aquifer responds similarly
Determine whether the block shown is in equilibrium and find the magnitude and direction of the friction force when theta=30 and P=150N
A water tank has a height of 120m, and its area of cross-section is 2000m. Water is released from the tank and the water level drops by 1 meter every minute. Find the rate of change in volume.
A newly designed dam is to be modeled in the laboratory. The prime objective of the general model study is to determine the adequacy of the spillway design and to observe the water velocities, elevations, and pressures at critical points of the st..
A signal approach has 20 seconds of displayed green, 4 seconds of yellow, and 3 seconds of all red (assume typical start-up, lost time, and clearance time). The cycle length is 60 seconds.
Two 9-in.-diameter pipes (pipe 1 and pipe 2) are supported every 7.5 ft by a small frame like that shown. Knowing that the combined weight of each pipe and its content is 30 lb/ft and assuming frictionless surfaces
A 6.6 mA current is flowing through a 47 kilo-Ohm, 5% tolerance, 2-watt resistor. If the resistor values are uniformly distributed, how many resistors out of a package of 100 would you expect to burn up
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd