Reference no: EM131349883 , Length: 3
POWDER COATING
Powder Coating applies powder coating finishes to a variety of materials and parts used by small and medium-size manufacturing firms. Essentially, powder coating involves the application of powder (finely divided particles of organic polymer containing pigments, fillers, and addi¬tives) to a surface,after which the powder is fused into a con¬tinuous film by the application of heat or radiant energy.The process results in a durable finish that resists rust.
In prior years, finishes were applied by hand, and man- ufacturing overhead was allocated to jobs based on direct labor hours. (The rate was $12 per hour based on overhead of $1,080,000 and 90,000 direct labor hours.) At the start of the current year,the company purchased and installed a computer- controlled electrostatic powder coating system at a cost of 51,800,000.With a five-year life,the equipment adds $360,000 a year to manufacturing overhead.(Thus,expected total over- head is now $1,440,000.) However, labor has been reduced by 25,000 hours per year (because the equipment reduces the need for labor). At an average wage rate of $20 per hour,
$500,000 of wages are expected to be saved in the current year.
While the company purchased a computer-con- trolled system including a new spray chamber, it kept its old spray booth and manual equipment for use on small jobs.
DuPage Powder Coating has just received an order from Cedargreen Enterprises (a small manufacturer of outdoor furniture) to powder coat 4 tables and 16 chairs. On small orders such as this, DuPage uses its old spray booth and manual equipment rather than the new computer-controlled system. Material cost for the job will be $500, and 7 labor hours are required.
Small jobs like the one for Cedargreen are worked on while the computer-controlled electrostatic system is being changed over (cleaning, different colors, etc.) between large jobs.
a. Based on the limited information, estimate the full cost of the job in the current year. Assume the company uses one company-wide overhead rate.
b. What would have been the cost of the job in part (a) in the prior year?
c. Bill McCally, plant manager, observed:"Last year,jobs like the one we did for Cedargreen Enterprises cost less. But I know we're not less efficient at handling small jobs. We use the same equipment, the same labor, and the same prod¬ucts on small jobs this year as
last year, and yet the account¬ing system is making small jobs look more expensive!"
Explain why the accounting system is making small jobs appear to be more costly in the current year.
d. Does the fact that small jobs have a higher cost in the cur¬rent year suggest that prices for small jobs should be increased?
Evaluate challenge for us public company to fully adopt ifrs
: Evaluate the challenges for U.S. public companies to fully adopt IFRS and propose solutions to these challenges. Provide support for your recommendations.
|
Compare the issues discussed in two briefings you selected
: From the e-Activity, compare and contrast the issues discussed in two briefings you selected. Take a position on which oral briefing closely matches your preferred style of communicating policy. Provide reasons to support your response.
|
Why you disagree with each of following authors statements
: ACC400- Complete this following by providing at least 2 reasons why you agree and 2 reasons why you disagree with each of the following author's statements.
|
Explanation of hashtables
: Provide an explanation of hashtables, including a description of a realistic scenario that could be solved with the application of a hashtable. Then, compare the purpose and usage of hashtables to JTrees as well as one of the following additional ..
|
What would have been the cost of the job in part in prior
: Powder Coating applies powder coating finishes to a variety of materials and parts used by small and medium-size manufacturing firms. Essentially, powder coating involves the application of powder to a surface,after which the powder is fused into a..
|
Are you familiar with a flexible budget
: ACC400- are you familiar with a flexible budget? What are some advantages to using a flexible budget? What might be some disadvantages of flexible budgets?
|
How technology could be used to improve companys operations
: Your team has been called in as accounting and business systems consultants. Disk4U wants to know how technologies could be used to improve the company's operations (especially the areas of accounting and business reporting).
|
Compare and contrast the two domains
: Discuss how collision and broadcast domains are related, but different. You should compare and contrast the two domains.
|
Determines the single electoral vote from that region
: An adversary is able to cast an additional 0.9 million false votes for candidate B by fraud. Can the adversary change the outcome? What now is the probability that candidate A will win? How does this change if the adversary can record one million ..
|