What would excavation cut depth for sewer line installation

Assignment Help Other Subject
Reference no: EM131279691

Part 1

1. The latitude of an azimuth equal to 205 degrees, 44.34 feet is _____ feet.

a. 18.74
b. 40.19
c. 20.68
d. 48.92

2. The departure of an azimuth of 44 degrees, 121.77 feet is ______ feet.

a. 18.74
b. 40.19
c. 20.68
d. 48.92

3. For a traverse of perimeter P = 574.66 feet, a summation of latitudes equal to +0.15, and a summation of departures of -0.09, what is the Precision Ratio?
a. 1/3400
b. 1/6800
c. 1/3800
d. 1/6400

4. The coordinates for station A are 1023.34 N and 988.56 E. What are the northing and easting coordinates for station B that is located 40 feet due east of A, and 22.32 feet due south of A.

a 1045.66 N and 1028.56 E
b. 1001.02 N and 1028.56 E
c. 983.34 N and 1010.88 E
d. 1001.02 N and 948.56 E

5. Area calculation of a closed traverse can be accomplished by dividing the interior of the traverse area into
a. an open traverse.
b. azimuth angles.
c. simple geometric shapes and adding the smaller areas.
d. x and y axis.

Part 2

1. On a set of construction drawings for a municipal street, the necessary cut at a specific station interval would best be found on a
drawing.
a. plan view
b. standard detail
c. profile
d. section cut

2. Where would an offset stake marked 3+00, 50 feet from center be located?
a. At the roadway centerline at station 3+00
b. Adjacent to the roadway centerline at station 3+00, 50 feet from the edge of the proposed road
c. Adjacent to the roadway centerline at station 3+00, 50 feet from the center of the proposed road
d. 50 feet north of station 3+00

3. Roadway construction control incorporates construction surveying of:
a. cut and fill.
b. line and grade.
c. station intervals.
d. invert elevations.

4. For a grade stake set adjacent to centerline station 4+50, marked cut 2.25 feet, a construction equipment operator would:
a. remove 2 feet, 3 inches of earth at station 4+50 in order to get the proposed roadway to subgrade elevation.
b. add 2 feet, 3 inches of earth at station 4+50 in order to get the proposed roadway to subgrade elevation.
c. remove 2 feet, plus or minus a quarter inch, of earth, in order to get the proposed roadway to subgrade elevation.
d. grade the road at 2.25% at station 4+50.

5. In order to layout a new street centerline intersecting with an existing street, a construction surveyor would:
a. pull a string-line perpendicular to the existing street at the proposed location of the intersection, and mark the station intervals as close as possible.
b. paint out the new road location on the ground and begin grading operations to match the existing road.
c. install new centerline stations using coordinate points as provided on the design drawings, making sure to stake the beginning and end of the horizontal curve from the new road to the existing road.
d. orient the design drawing plan view of the proposed intersection, and use angles and distances necessary to  ensure the best fit of the new road to the existing road.

6. At what top elevation would a concrete form be set for the lower side of a 6 foot wide sidewalk with proposed upper edge elevation of 665A5?
a. 663.95
b. 666.95
c. 665.47
d. 665.33

7. What would the excavation cut depth be for a sewer line installation at a station interval with top of ground elevation at 765.08 and top of pipe elevation of 753.23 if the sewer pipe is 20 inch diameter RCP with a wall thickness of 3 inches, and a required commercial stone pipe bedding thickness of 4 inches?
a 14.35 feet
b. 15.11 feet
c. 12.87 feet
d. 13.54 feet

8. What is the percent grade of a storm sewer pipeline that has a change in elevation of 1.4 feet over 160 linear feet of pipeline?
a. 1.40%
b. 0.88%
c. 0.014%
d. 1.39%

9. What should the invert elevation of a sewer pipeline be at station 3+40 if the invert out elevation of manhole at station 2+50 is 343.35, the invert in elevation of manhole at station 4+50 is 340.76, and there are no obstructions between the manholes?
a. 342.05
b. 343.34
c. 342.18
d. 340.77

10. Laser alignment control of line and grade for pipeline installation is used when:
a. no obstructions are present in the pipeline excavation.
b. the pipeline is to be installed on a continuous grade.
c. there is significant distance of pipeline with no valves or fittings obstructing laser view.
d. All of the above

11. Tunnel construction is necessary when conventional open cut trenching cannot be feasibly utilized due to a existing utilities that cannot be disturbed.
b. large volumes of traffic on a main roadway.
c. extreme depth of cut due to existing terrain
d. All of the above

Part 3

1. For a building with a foundation bottom 10 feet deeper than the finished surrounding grade, the original batter boards should be placed at least how many, feet from the corners of the building?
a. 10 feet
b. 3 feet
c. 5 feet
d. At the building corners

2. The most important features of a construction project to verify for the final as-built survey prior to completion of the construction project are:
a. roof top pitches.
b. lab cabinetry color.
c. buried pipeline locations.
d. manhole covers.

3. Culvert location offset stakes are typically installed:
a. adjacent to the inlet and outlet of the culvert pipe.
b. adjacent to the culvert center point.
c. within the excavation limits of the culvert.
d. in line with the run of the culvert.

4. Construction surveying layout for culverts is most like
a building
b. highway
c gravity pipe line
d bridge layout.

5. Bridge construction surveying is usually conducted:
a. using pacing to layout distances.
b. using a high degree of accuracy.
c. in the winter months when the water is frozen.
d. without regard to the connecting highway.

6. Typically, bridge construction layout is initiated with:
a. complex offset distance calculations.
b. offset stakes from bridge centerline.
c. strings or wire from each end of the adjoining highway.
d. coordinate layout of foundation corners or centers.

4. Construction surveying layout for culverts is most like
a. building
b. highway
c. gravity pipe line
d. bridge layout.

5. Bridge construction surveying is usually conducted:
a. using pacing to layout distances.
b. using a high degree of accuracy.
c. in the winter months when the water is frozen.
d. without regard to the connecting highway.

6. Typically, bridge construction layout is initiated with:
a. complex offset distance calculations.
b. offset stakes from bridge centerline.
c. strings or wire from each end of the adjoining highway.
d. coordinate layout of foundation corners or centers.

7. Bridge construction elevation control is first established with level and rod methods:
a. along the bridge span beams.
b. at the foundation of the bridge.
c. along the adjoining highway centerline.
d at the crown of the pavement over the bridge.

8. How many building corners must be established using coordinate layout prior to setting a transit or total station over one of the corner points?
a. 1
b. 2
c. 3
d. 4

9. Construction surveying for building layout is most crucial for which component of construction?
a. The roof
b. The walls
c. The doors
d. The foundation

10. A batter board is used to:
a. hit trespassers with.
b. control unruly workers.
c. install line of site offsets along a building outside wall line.
d. hold up instrument tripods.

11. For a rectangular building measuring 26 feet long and 16 feet wide, the diagonals from opposite corners should measure:
a. 26 feet and 16 feet respectively.
b. 30 feet, six and % inches each.
c. 42 feet each.
d. 2 inches different from each other.

12. A rotating laser is used:
a. as an audible site security alarm.
b. to establish a constant elevation or grade plane in its radius of influence.
c. to install building outside wall line offsets.
d. to keep insects away from the construction workers.

13. To maintain vertical control during multistory building construction, measurements are taken using differential leveling or steel taping from the:
a. roof line.
b. top of the concrete foundation.
c. batter board.
d. rotating laser centerline.

14. For vertical alignment of walls, a transit or total station from a wall line offset can be used, as well as a(n):
a. automatic level and rod.
b. steel tape.
c. horizontal curve computation.
d. plumb bob offset over the top of an outside wall line or corner point.

15. Projects requiring quantity surveying are usually being paid for:
a. by lump sum after project completion.
b. by unit price measured in dollars per unit of measure.
c. with cash.
d. with extremely expensive survey equipment.

16. The final units of measure reported from a quantity survey, of an earthwork project would more than likely be:
a. degrees, minutes, and seconds.
b. feet.
c. square feet.
d. cubic feet or cubic yards.

17. Quantity surveying is accomplished by breaking up large complex areas into:
a. squares.
b. circles.
c. simple geometric shapes.
d. triangles.

18. For earthwork volume calculations, the variation in elevation measured in feet is usually accomplished:
a. by numerous differential leveling measurements.
b. using a tape measure.
c. by rounding to the nearest foot.
d. by guessing.

19. A final survey is also known as:
a. a baseline survey.
b. the last hoorah.
c. an as-built survey.
d. a control survey.

20. The final survey must take into account:
a. building corners installed a few feet from original design location.
b. roadway horizontal curves larger than design.
c. constructed variations from the original design.
d. All the above

Reference no: EM131279691

Questions Cloud

Receiver can be expressed by the polynomial : Assume that in a cyclic redundancy check algorithm the errors received at the receiver can be expressed by the polynomial x7 + x6 + x + 1.
Determine the flowrate assuming the pipe is horizontal : Asphalt at 120 °F, considered to be a Newtonian fluid with a viscosity 80,000 times that of water and a specific gravity of 1.09, flows through a pipe of diameter 2.0 in.
What is meant by a fundamental factor model : What is meant by a fundamental factor model?- What is meant by latent factors?- How are latent factors estimated?
What are the main assumptions of arithmetic random walks : What are the main assumptions of arithmetic random walks?- What are their main disadvantages when modeling asset prices?
What would excavation cut depth for sewer line installation : What would excavation cut depth be for a sewer line installation at a station interval with top of ground elevation at 765.08 and top of pipe elevation of 753.23 if the sewer pipe is 20 inch diameter RCP with a wall thickness of 3 inches.
Company has been inspecting units of output from process : A manufacturing company has been inspecting units of output from a process. Each product inspected is evaluated on four criteria. If the unit does not meet standards for the criteria it counts as a defect for the unit. Each unit could have as few as ..
How will you manage the risks to your project : Managing risk means reducing the likelihood and/or impact of negative events. The Quality & Risk Manager should lead the development of the plan - How will you manage the risks to your project?
Audio application in action : Imagine that you are building a Website for a popular international music store. The owner wants to play an audio clip featuring the musical instrument of the month on their home page. Determine how you would add audio to the page so that it is co..
What is the value of the friction factor for this duct : What is the value of the friction factor for this duct and the approximate size of the equivalent roughness of the surface of the duct?

Reviews

Write a Review

Other Subject Questions & Answers

  Research paper on berkeley view of cloud computing

In a short write-up, highlight the major points that you comprehend from the paper - Above the Clouds: A Berkeley View of Cloud Computing

  What is the greatest domestic terrorist threat

What is the greatest domestic terrorist threat the United States faces today? How might this threat change in the next five years

  Development of right to counsel impacted criminal justice

What is right to counsel. Explain when the right to counsel attaches, and when it does not apply. How has the development of right to counsel impacted the criminal justice system. What changes to right to counsel would you suggest. Why. Explain.

  Why are sweeping claims about fundamental sex differences

Why are sweeping claims about fundamental sex differences in the human brain misleading?

  What is different about an omnibus bill

Given what you now know about how Congress works and how a bill is passed, what is different about an omnibus bill. What is the strategy behind omnibus bills. Provide an example from American politics. Other countries, notably Canada, use omnib..

  Effective strategies paper

Effective Strategies Paper

  Practical advice on writing a business plan

Having taken an Ashford course on entrepreneurship, you have been asked by a friend to offer practical advice on writing a business plan. What advice would you give your friend? Identify five key points you would insist be included in a business p..

  Explain effective leaders both learn from past

Effective leaders both learn from past and are able to adjust what they have learned to present context. In paper, explain how you, as leader or potential leader in professional or community context.

  Assignment: quality care and safety

Assignment: Quality Care and Safety

  Eplain chi-square goodness-of-fit test give detailed

describe the chi-square goodness-of-fit test. provide a detailed explanation of what this test measures and how it is

  American concept of family

The American concept of "family" shifted radically in the last fifty years. People may use their own family as an example when they think of family, but it is important for them to realize that family is far larger and broader than their own exper..

  Developing goals and nursing interventions

The purpose of this assessment is to promote both problem solving and nursing care provision, related to a selected clinical scenario -

Free Assignment Quote