A wastewater is discharged to a stream with a reoxygenation constant of 0.5 day-1 and a velocity of 1 m/sec. The oxygen saturation concentration in the stream is 11 mg/L. Immediately downstream of the discharge the oxygen concentration is 9 mg/L and the deoxygenation constant is 0.3 day-1. Upstream of the discharge the ultimate oxygen demand is 8 mg/L and the stream flows at 20 million gallons per day. The plant discharges a waste which has an ultimate oxygen demand of 30 mg/L and has a flow rate of 8 million gallons per day. What will the lowest dissolved oxygen concentration be downstream of the discharge and how far down the stream will it occur?
The truss is to be constructed of members with equal cross-sectional areas and using a material with yield stress 700 MPa. The structure must be designed to support a mass (m) of 3400 kg with a factor of safety of 3.
an electrical-generation utility sometimes pump liquid water into an elevated reservoir during periods of low electrical consumption. this water is used to generate electricity during periods when the demand for electricity exceeds the utilities a..
Determine the cycle time for a single engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions.
The setting velocity of a particle is 0.002 m/s and the overflow rate of a settling tank is 0.008 m/s. (a) what percent of the particles does the settling tank capture. If the particles are flocculated so that thie rsettling rate is 0.05 m/s
A tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. What measurements should be laid out to establish a horizontal distance of 682.25ft?
Calculate deformation of the truncated equilateral triangular steel pyramid. The pyramid has the height h of 156mm truncated at the top by 2mm and the base side s of 127mm.
A motor grader will require 2 pases at 3 mph., 2 pases at 4 mph., and 2 passes at 5.5 mph. to accomplish the work How many grder hours will be required to accomplish this job if the job efficiency factor is 0.75.
You are in an old spy movie, and have been locked into a small room (volume 1000 ft). You suddenly realize that a poison gas has just started entering the room through a ventilation duct.
An article reports measurements of expansion for several concrete bridges in the area of Quebec City. Following are measurements of horizontal and vertical expansion (in parts per hundred thousand) for several locations
A micro-channel of diameter 0.5 mm and length 750 mm is connected to a plenum. A fan produces a negative gage pressure of -1.5 inch H2O in the plenum and draws air at 20oC into the micro- channel.
Lift Charts in direct marketing, The mass-mailing business is often used to illustrate the use of lift charts. Another real world application where the lift charts can be used
The temperature was 200C, and the void ratio (e) of the soil was 0.43. Calculate the "Coefficient of Permeability" in "centimeters per second" (Given, k = (QL)÷(A Δh t)).
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd