Standard Job Order Costing -Variance Analysis
Special order lamps are manufactured in division S. Because of the precise nature of the process a standard cost system has been developed. The blowing standards are used for the special orders:
Standards
|
|
Lamp Kits
|
$16.000000 per lamp
|
Direct Labor
|
2.400000 per lamp (4 lamps/hr.)
|
Variable Overhead
|
0.250000 per lamp (4 lamps/hr.)
|
** Fixed Overhead
|
10.000000 per lamp
|
Total
|
$ 28.650000
|
** Fixed overhead is based on expected production of 4,009 customized lamps each month.
To keep records of the actual cost of a job, a Jab Order Cost System has been developed. Entries are made to the Job Order System at actual cost (overhead is applied based on actual labor hours) while entries are made to the accounting system at standard. Variance analysis is used to analyze the differences.
Job Order Costing Section
On January 1, 20x2, Division S began Job 1101 For the Client, THE BIG CHILDREN STORE. The job called for 4,000 customized lamps. The Following se! of transactions occurred from January 5 until the job was completed:
5-Jan Purchased 4,000 Lamp Kits @ 16 .75 per kit.
9-Jan 4,075 sets of Lamp Kits were requisitioned.
17-Jan Payroll of 560 Direct Labor Hours @ $9.45 per hour.
30-Jan Payroll of 610 Direct Labor Flours @ $9.70 per hour.
30-Jan 3,991 lamps were completed and shipped. All materials requisitioned were used or scrapped.
Month End Overhead information
Actual Variable Overhead - $ 1,193.40
Actual Fixed Overhead - $39,373.45
How many Lamps were completed?
Note: Show favorable variances as negative numbers.
What was the total material price variance for the Lamp Kits purchased?
What was the material usage variance far Lamp Kits?
What was the direct labor efficiency variance?
What was the direct labor rate variance?
Note: Snow favorable variances as negative numbers.
What was the' variable overhead efficiency variance?
What was the variable OH spending variance?
What is the fixed OH volume (denominator) variance?
What is the fixed OH spending variance?
What is a materiality threshold
: What is a materiality threshold, and how might the level set for negative deviations differ between small and large business.
|
Suggest strategy you may use to structure strategic planning
: Next, suggest one strategy you may use to structure the strategic planning session for a not-for-profit mid-sized health organization that is competing with several for-profit facilities in the area.
|
Find the density of the liquid in both si and u.s. customary
: A beaker has the shape of a circular cone of diameter 7 in and height 9 in. When empty, it weighs 14 oz; full of liquid, it weighs 70 oz. Find the density of the liquid in both SI and U.S. customary units.
|
Give an overview and flow diagram of the service process
: Give a brief overview of the company including its services, location & history.- Describe the service in more detail.- Give an overview and flow diagram of the service process.
|
What was the material usage variance far lamp kits
: Standard Job Order Costing -Variance Analysis. Special order lamps are manufactured in division S. Because of the precise nature of the process a standard cost system has been developed. What was the total material price variance for the Lamp Kits p..
|
Describe the differences between a leader and a manager
: Describe the differences between a leader and a manager and analyze the perspectives that shape each role for maintaining a healthy organization.
|
Estimate the apparent viscosity of this fluid
: Estimate the apparent viscosity of this fluid when the shear strain rate is 70 s-1, and compare this value with the viscosity of water at the same temperature.
|
Derive an expression for the viscosity of the fluid
: The inner cylinder rotates at a rate of Ω rad/s when a torque T is applied. Derive an expression for the viscosity of the fluid between the cylinders, μ, as a function of these parameters.
|
Summarize the given case and research about it
: Summary, Relevant research is summarized, with a clearly and logically stated theory.Transition and Development, There is a smooth and logical transition from research review to proposed study including a clear statement of purpose.Design Developm..
|