CASE STUDY: BUCKEYE TECHNOLOGIES Buckeye Technologies is a manufacturer of semiconductors for mobile consumer electronic devices, such as laptop computers, smart phones, and digital cameras. Ms. Sabina Norton has been working at Buckeye Technologies for about a year as a production manager. The volatile demand of the semiconductor industry has been an obstacle in designing an accurate production schedule. The unstable demand causes the company to carry high amounts of safety stock and incur other types of wastes. Sabina is wondering if the operation can be modified to become more efficient.Transistors are key components used in the manufacture of a semiconductor. One of the transistors of a cell phone semiconductor is sourced from Xiang, a supplier in China, with a lead time of two months. Buckeye Technologies usually carries enough of these transistors at the plant. When it runs out of them, however, they experience high levels of work-in-process (WIP) inventory and are unable to continue with production. Although this transistor can also be obtained from several suppliers in the United States, the cost is considerable higher compared to the cost of sourcing it from Xiang.The semiconductors for laptop computers, smart phones, and digital cameras are produced differently, so every time the company needs to produce a different type of semiconductor, the operator is required to change the setting of the production machinery. This can be time consuming, and the company wants to be able to respond quickly to changes in demand. Sabina knows that there must be a way to reduce inventory, but at the same time she wants to keep a flexible production to keep up with the fast paced environment and the volatility of the demand.Sabina has also noticed that the current design of the facility is not very efficient. Currently the facility production system is grouped by function and components move from function to function. There are about 350 steps in producing a semiconductor chip. Some functions of the facility are located at one end of the facility, while other functions are at the other end of the facility. This results in long waiting times between procedures. She is thinking about changing the design of the facility to one that will give more flow to the production process.Sabina recognizes that there are a number of changes that must be made. She has heard of Lean as a method to reduce waste but is not sure where to begin.CASE

QUESTIONS

What suggestions do you have for Sabina about working with suppliers and how would you address the sourcing issue from the Chinese supplier based on Lean principles?

What should Sabina do about reorganizing the work environment?

Should any layout changes be made and how do you think they should be implemented?

How would you address the issue of equipment setup? How would you proceed?

What other suggestions would you offer Sabina to improve the operation of this company? In what order should these changes be made?

Describe the organizational culture of Lean. How can Sabina promote this at Buckeye?

Reference no: EM132234897

What are industry concerns or benefits from each method

Has OSHA been successful in cases where companies have been cited for ergonomic hazards under the General Duty Clause? Why or why not? What are industry concerns or benefits f

Is a simple model or seasonally enhanced model better

Evaluate alternative forecasting models. Is a simple model or a trend or seasonally enhanced model better? How could you use this information to solve the paper shortage probl

Tracking scope creep

Refer to the text, “Tracking scope creep: A project manager responds” in chapter 10 of the Meredith & Mantel text. Is the point of this letter to the editor about scope creep

Determine the effective purchasing power

Fourteen years ago, the U.S. Aluminum Corporation borrowed $9.9 million. Since then, cumulative inflation has been 98 percent (a compound rate of approximately 5 percent per y

Sponsor of project to build two mega-movie theaters

You are the sponsor of a project to build two mega-movie theaters in Austin, Texas. You hired Dallas-based Martin Construction Company to do the work to the tune of $16M. Thei

Discuss who is most likely to prevail in each circumstance

In the following situations, two parties claim the same goods. Discuss who is most likely to prevail in each circumstance. Explain the basis for your response. Olan steals Phi

Compute the net present value of each project

Garry Piper’s rich uncle gave him $80,000 cash as a gift for his 40th birthday. Unlike his spoiled cousins who spend money carelessly, Mr. Piper wants to invest the money for

Divide the business into more manageable working units

Companies use departmentalization to divide the business into more manageable working units. Each departmentalization option has both distinct advantages and disadvantages. Th

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd