What should johnson estimate time and parts costs

Assignment Help Operation Management
Reference no: EM13253677

Johnson Industries received a contract to develop and produce four high-intensity long- distance receiver/transmitters for cellular telephones. The 1st took 2,000 labor hours and $39,000 worth of purchased and manufactured parts; the 2nd took 1,500 labor hours and $37,050 in parts; the 3rd took 1,450 labor hours and $31,000 in parts; the 4th took 1,275 labor hours and $31,492 in parts.

Johnson was asked to bid on a follow-on contract for another dozen receiver/transmitter units. Ignoring any forgetting factor effects, what should Johnson estimate time and parts costs to be for the dozen units? (Hint: There are two learning curves)

 

Reference no: EM13253677

Questions Cloud

Explain what is w when a gas is compressed : What is w when a gas is compressed from 38.3 L to 28.8 L using a constant external pressure of 745 mmHg
Which function describes the expression of pleasure : In the closing of an interview, which function describes the expression of pleasure with the interaction and the projection of what will happen next?
Determine output voltage for an op-amp comparator circuit : Determine the output voltage for an op-amp comparator circuit with a non-inverting input reference voltage of + 2 VDC and an inverting input signal of - 1 VDC. The op amp reaches output saturation voltages of ±13 V at the limits.
What part of the interview provides an opportunity : What part of the interview provides an opportunity for the interviewer and the interviewee to increase their knowledge of each other, clarify the purpose of the interview, and explain the direction of questioning?
What should johnson estimate time and parts costs : Johnson was asked to bid on a follow-on contract for another dozen receiver/transmitter units. Ignoring any forgetting factor effects, what should Johnson estimate time and parts costs to be for the dozen units? (Hint: There are two learning curve..
Explain the final temperature of the brass-water mixture : Brass has a density of 8.40 g/cm3 and a specific heat of 0.385 J g-1 oC-1. A 11.2 cm3 piece of brass at an initial temperature of 154oC is dropped into an insulated container with 138.4 grams of water initially at 24.1oC. What will be the final te..
What is the peak value of the rectified voltage across load : t uses four diodes, each of which can be modeled to have a 0.7-V drop for any current. What is the peak value of the rectified voltage across the load. For what fraction of a cycle does each diode conduct.
What is the cyclotrons magnetic field : A proton takes 99.0?s to complete one orbit around a 14.5 m diameter cyclotron. What's the cyclotron's magnetic field
Describe the temperature of the calorimeter increased : The temperature of the calorimeter increased from 24.5oC to 26.7oC. If the heat capacity of the calorimeter is 4.46 kJ (oC)-1, then what is the constant volume heat of combustion of this compound, in kilojoules per mole? (Remember to include a "+"..

Reviews

Write a Review

 

Operation Management Questions & Answers

  How much money should the teller give paul

a bank charges a 1% fee to process a credit card cash advance. the fee is taken out of the cash advance amount. paul asks a teller for a cash advance of 4,000. how much money should the teller give paul after the cash advance has been processed? 3..

  Assess wal-marts attempt to restore its public image

Why do you think that Wal-Mart had so many events that caused its image to be tarnished?

  By explain how much would the accuracy rate improve

By explain how much would the accuracy rate improve if an additional (a second), equally accurate verifier were used.

  Describe the areas where you see yourself lacking

From the e-Activity, briefly describe your results from the communication skills quiz. Describe the areas where you see yourself lacking or needing improvement as a communicator, and suggest steps you could take to improve or fill a void.

  Estimating the current maximum output

Susan's Sub Shop makes customer submarine sandwiches to order. There are 4 workers. What is the current maximum output of Susan's Sub Shop in number of units per hour?

  How might a universal health insurance program change

How might a universal health insurance program change the current trends in the health care industry?

  Determine the project completion time

Development of an update of a particular software product is being considered by a software house. The activities necessary for the completion of this project are listed in the following table:

  First printing has contracts with legal firms

First Printing has contracts with legal firms in San Francisco to copy their court documents. Daily demand is almost constant at 12,500 pages of documents

  Creating a gantt chart

A project requires completion of activities A, B, C, D, E, F, G, H, I and J.Additionally, there are two other logic relationships. Activity ‘H' can start only after 3 days have elapsed following the completion of activity ‘E'.

  How many buns should be made each week

How many wieners and how many buns should be made each week to maximize profit? State the objective function if W is the number of Weiners produced and B is the number of buns.

  Working on a calendar year basis and give all raises

You are working on a calendar year basis and give all raises on january 1. your market position at the beginning of the new plan year is 4.0% below the market.

  Discuss application of the 3 stages of facility location

Read the Location Selection through Integrated Systems Management article. Define Integrated Systems Management in your own words.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd