What is the terminal velocity of mass m

Assignment Help Civil Engineering
Reference no: EM13541213

A 73-mm diameter aluminum (SG=2.64) piston of 100-mm length residesin a stationary 75-mm inner diameter steel tube lined with SAE10W-30 oil at 25C. A mass m=2kg is suspended from the free end ofthe piston. The piston is set into motion by cutting a supportcord. What is the terminal velocity of mass m? Assume a linearvelocity profile within the oil.

Reference no: EM13541213

Questions Cloud

What is the annual equivalent value of ageometrically : Assume he has to reach a town 300km away, and that the 40 kg he carries includes both merchandiseand the food necessary for his sustenance during the trip at 2000Cal/day.
What amount of tension do you need to apply not to have any : You are using that tape to measure the distance between two pointswhere the tapes are supported at the ends only. The temperature ofthe day is 68oF. What amount of tension do you need to apply not tohave any corrections in the tape measurement?
Estimate the annual number of additional cancers per year : Why don't we assume that there is an unknown moment about B? It the solution it only shows a horizontal force at B. And is there a reason why the horizontal force at B is labeled By?
Determine the dry density of the soil : A small hole about 4" in diameter and 6" deep is dug into acompacted layer of a soil embankment. 2.96 lbs of motor oil withGs=0.92 is required to fill the hole.
What is the terminal velocity of mass m : A 73-mm diameter aluminum (SG=2.64) piston of 100-mm length residesin a stationary 75-mm inner diameter steel tube lined with SAE10W-30 oil at 25C. A mass m=2kg is suspended from the free end ofthe piston
When will the loan be paid off : A person applied a mortgage of $300,000.A mortgage company claimed the interest rate for the 15-year loanis 6.5%. (a) What would be the monthly payment? (b) If the personaccepted the terms of the loan on Oct.
What interest rate did hereceive on his investment : An investor purchased 100 shares ofOmega common stock for 10,000. He held the stock for nine years.For the first four years he received annual end-of-year dividendsof $1,000. For the next four years he received annual dividends of$400
A large part of holland is below sea level : A large part of Holland is below sea level.Earthen dikes keep the sea at bay. There's a Holland legend of aboy who uses his finger to plug a hole in the dike and saves thecountry side. Assume the center of the hole is located 3.0
Determine the concentration of fe3+ in pure water : Give a few examples of movable bridge designs, that build with a certain robotics toolkit (VEX) kit. Specify the dimensions of the bridge design and the materials needed to build it from a VEX kit.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine how high an elevated reservoir must be

Often times, this pressure comes from the fact that community's water supply is stored in an elevated reservoir. Determine how high an elevated reservoir must be so that the water supply has a pressure of 50 psi. Given: the unit weight of water is..

  Calculate the height of water in the standpipe after 4 hours

A falling-head permeability test is being conducted on a saturated sample of clayey silt having hydraulic conductivity of 6.5 x 10-9 m/s. The diameter and the length of the sample are 100 mm and 150 mm.

  Calculate what is the elongation of a rectangular bar

What is the elongation of a rectangular bar (cross section 2 inch * 2 inch length 4 ft) When it is subjected to an axial load of 80,000 lbs. Assume the material of the bar has the following properties G = 7,700 KSI, V =0.30

  Determine the inlet volumetric flow rate for the ammonia

The magitude of the power input to the compressor is 7,5kW and there is heat tranfser from the compressor to the surroundings at a rate of 0.15kW. Kinetic and potential energy are negligible.

  Determine what force was needed to buckle the bar

On a very hot day, I saw a 1.6 meter long steel bar held between two rigid supports that had buckled due to the heat. The bar had a cross section of 10 mm by 40 mm, and I assume was A36 steel.

  What will be the shear stress

A trapezoidal channel is carrying water at a normal depth of 5.2 ft, the channel has a bottom width of 10 ft and side slopes of 2 H to 1 V. It is running on a slope of 0.005 ft/ft. What will be the shear stress in lb/ft^2 exerted on the channel be..

  Determine the ratio k of the tension in the remaining wire

The small sphere of mass (m) is suspended initially at rest by the two wires. If one wire is suddenly cut, determine the ratio (k) of the tension in the remaining wire immediately after the other wire is cut to the initial equilibrium tension.

  What is the rate of water rise in the lake in one day

A river discharges at a rate of 500 cfs into a lake. The water is drawn from the lake at a rate of 200 cfs. The surface area of the lake is 60 acres (1 acre = 43, 560 ft2). What is the rate of water rise in the lake in one day

  Determine what minimum value of coefficient of traction

A wheel tractor-scraper is operating on a level grade, assuming no power derating is required for equipment conditions, altitude, and temperature.

  Draw the shear diagram for the shaft

Draw the shear diagram for the shaft. The bearings at and exert only vertical reactions on the shaft

  Find speed and direction of each section relative to earth

A two stage rocket with a total mass of 925kg is traveling at a speed of 6.6 10^3 m/s away from the earth . A predesigned explosion separates into two sections of equal mass that move with a speed of 2800m/s relative to each

  Determine the distance the orbiter travels from the time t

A 230,000-lb space shuttle orbiter touches down at about 220 miles per hour (mph). At 200 mph, its drag parachute is deploys. The wheel brakes are applied at 100 mph until wheel sotp and the drag parachute is jettisoned from the orbiter at 35 mph.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd