What is the percent yield

Assignment Help Civil Engineering
Reference no: EM13210668

Carbon disulfide (CS2) reacts with excess chlorine (Cl2) to produce carbon tetrachloride (CCl4) and disulfur dichloride (S2Cl2). If 69.7 g of CS2 yields 62.6 g of CCl4, what is the percent yield? (Hint, you must first write the balanced equation.)

Reference no: EM13210668

Questions Cloud

What kind of preconceptions : Did the European explorers and missionaries confront the Native Americans with an open mind? What kind of preconceptions did they have?
Explain different types of purification techniques : Explain how to purify a product using each of the 3 different techniques, elaborate on what these techniques achieve at the molecular level.
Punishment is effective in suppressing behavior : Punishment is most effective in suppressing behavior when it is
Explain the molarity ofa saturated aqueous solution : Use the following data, as appropriate to estimate the molarity ofa saturated aqueous solution of Sr(IO3)2.
What is the percent yield : Carbon disulfide (CS2) reacts with excess chlorine (Cl2) to produce carbon tetrachloride (CCl4) and disulfur dichloride (S2Cl2). If 69.7 g of CS2 yields 62.6 g of CCl4, what is the percent yield? (Hint, you must first write the balanced equation.)
Calculate the force of water hitting a concrete cylindrical : How do you calculate the force of water hitting a concrete cylindrical pole. The velocity of the water is 2 ft/s, the depth of the water is 10 ft, and diameter of the pole is 3 ft. So what would be the total force exerted on the pole by the water?
Write a mass balance equation for this chemical : An industrial plant presently discharges a chemical (W=2000 * 106 gr/yr) to the lake. In addition, the inflow stream also contains the same chemical at a concentration of 15 mg/L. Note that the volumetric inflow and outflow are equal.
Explain reflux for reaction to be successful : The following lab requires water free conditions as well as reflux for reaction to be successful. Draw a schematic and label your reaction set up
Accumulation of information-skills and strategies learned : Which is based on the accumulation of information, skills, and strategies learned through experience, remains steady and in some cases actually improves.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Structure project design in civil engineering

Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas

  Fraction of the herbicide

The herbicide 2,4,D, is applied to a golf course at a rate of 1.2 kg/ha. The organic matter content of the soil is 1%, bulk density is 1.3 g/cm3, and water content is 0.3. a) What fraction of the herbicide is adsorbed, and what fraction is dissolve..

  Base of each standpipe

Determine: a) the height of the water, with respect to the base of each standpipe, and b) the effective stress at the depth of each standpipe, at the following times:

  Seepage velocity and estimating hydraulic gradient

The dye appears 14 days later in an observation well 75 ft away from the injection point. Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.

  How long the train blocked the crossing

Assuming constant acceleration, determine how long the train blocked the crossing. Dis- regard the width of the crossing.

  Find the shortest ladder

a wall 8 ft high is 3/3/8 ft. from a house. find the shortest ladder which will reach from the ground house when leaning to the wall.

  Unit of measurement and unit of payment

Write the unit of measurement and unit of payment of following items. 1) Earthwork in excavation in foundation. 2) Framwork. 3) Steelwork in trusses. 4) Damp proof course D.P.C. 5) Cement.

  Pressure on the soil if theta is given

A pipe is to be installed under the ground on a bed of aggregate 6 in. thick. The entire weight on the aggregate from pipe and soil above the pipe is 1800 lbs. per linear foot of pipe. What is the pressure on the soil if theta is 45 degrees? Assum..

  Construction of the embankment

Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..

  Required height of the roller coaster

Determine the required height h of the roller coaster so that when it is essentially at rest at the crest of the hill it will reach a speed v= 100km/hr when it comes to the bottom.

  Concrete dam retaining water

A concrete dam retaining water has a specific weight of concrete of 23.5kn/m3, what is the factor of safety against sliding & overturning and pressure intensity on the base if coefficient of friction is 0.45

  Measure the distance pa, pb, pc

Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd