Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A chalk core plug having a pore volume of 17.0307 cm3 is fully saturated with reservoir brine. A synthetic oil flood is conducted on this plug. It is found that 12.25 cm3 of reservoir brine was displaced from this plug by the synthetic oil. After reaching this value, no further reservoir brine could be displaced from the core plug. What is the irreducible water saturation of this core plug?
The phone lines to an airline reservation system are occupied 40% of the time. assume that the events that the lines are occupied on successive calls are independent. assume that 20 calls are placed to the airline.
What is the relation between reflection and transmission coeffients of a sea wall
The power, P, required by an agitator in a tank is a function of the following variables, diameter of the agitator, D, Frequency of the impeller rotation, w (1/s), Viscosity of liquid, u (lbss/ft^2) and the density of the liquid ,p (slugs/ft^3)
The length of the wire is 7,000 m, the weight density of the steel is 78 kN/m3 and its ultimate stress is 620 MPa. Find the safety factor of the wire against breaking from its own weight.
The fluid pressure in the screen of a piezometer in a saline aquifer is 7.688 x 10^5 N/m^2. The fluid density is 1055 kg/m^3 and the temperature is 14 degrees C. The elevation of the piezometer screen is 45.9 m above sea level.
The posItIon of a particle along a straight line is given by s = (t 3 - 9t 2 + 1St) ft, where t is in seconds. Determine its maximum acceleration and maximum velocity during the time interval 0 :5: t :5: 10 s.
According to the design philosophy in the AASHTO Specifications, how does a heavy truck parked on a prestressed bridge girder effect the nominal shear resistance of the girder
A line is measured with a 2-chain tape, and a suveyors arrows are use to mark the end of the tape lengths . the three tallies are recorde the rear tapeman has eight arrows
Determine the cycle time for a single engine scraper rated at 21 cy heaped that is used to haul material from a pit to a fill 900 ft away under severe conditions. The average haul speed will be 14 mph and the average return speed will be 20 mph.
Find the cooling load (in tons of refrigeration) for a room supplied with 10,000 CFM of 95 DB outside air with ratio of 105 gr/lb. The room is to be maintained at 78 DB and humidity ratio of 71.5 gr/lb.
A highway reconstruction project is being undertaken to reduce crash rates. the reconstruction project involves a major realignment of the highway such that a 60mi/h design speed is attained.
A four- lane undivided multilane highway ( two lanes in each direction) has 11- ft lanes and 5- ft shoulders. At one point along the highway there is a 4% upgrade that is 0.62 mi long. There are 15 access points along this grade.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd