What is the estimated labor cost for a job

Assignment Help Microeconomics
Reference no: EM13990473

1. You're figuring out the bid for a job that includes installing a device you've never installed before. To get an accurate and competitive bid for this installation, you should

A. leave it out of the bid because you're not sure exactly what it will cost to do the installation.

B. assume it won't take more than the normal labor-unit so your bid won't be more than your competitor's.

C. include the total cost of all tools needed to install it.

D. try to guess at the time and expenses to install it based on your knowledge of similar tasks.

2. Many labor-related tasks are considered when developing a labor-unit count for a job. A portion of the labor-unit total includes

A. 75 percent for layout, material, and tool handling.

B. 25 percent for material handling.

C. 60 percent for installation and material handling.

D. 50 percent for installation and layout.

3. Supervision represents _______ percent of the labor unit.

A. 50

B. 5

C. 15

D. 10

4. The labor to install a receptacle is listed as 14/C. This means that it will take 14 hours to install 100 receptacles or _______ minutes to install 1 receptacle.

A. 840

B. 14

C. 8.4

D. 0.14

5. What is the estimated labor cost for a job if the total adjusted estimated labor is 115 hours and the labor rate per man-hour is $23.00?

A. $2,645.00

B. $138.00

C. $2,530.00

D. $1,322.50

6. You might want to consider _______ to protect you against dramatic cost increases, such as those in steel conduit and copper wire prices.

A. job insurance

B. occupational fees

C. a utility charge

D. a contingency clause

7. What is the total travel time required for a 350-hour job that has 5 workers, assuming a travel time of 1.5 hour per worker per day and 7-hour work days?

A. 525 hours

B. 52.5 hours

C. 75 hours

D. 105 hours

8. What labor-unit adjustment should you make for ladder work at 18 feet?

A. 25%

B. 19%

C. 3%

D. 13%

9. Which of the following should you consider when adjusting labor units for job conditions?

A. Weather/temperature

B. Sales tax

C. Material cost fluctuations

D. Anticipated staff strikes

10. After developing your bid, you need to create a proposal that states what you'll be responsible for and what costs are included in the bid. Which of the following does not need to be included in the proposal?

A. The analysis of the accuracy of your bid

B. The length of time the agreement will remain in effect

C. Information about who will pay for the cost of the permit

D. The amount of your bid for the final cost of the project

11. To develop an accurate bill-of-materials, you should count and measure each individual symbol on the blueprints. This process is called

A. the take-off.

B. labor extension.

C. material cost extension.

D. computer-assisted pricing.

12. When developing a bid for wiring a new building that contains 17 floors with the same basic wiring layout, you need to

A. add 17 percent to the total project cost of labor.

B. subtract 13 percent from the cost of labor for each floor.

C. subtract 5 percent from the cost of labor for each floor.

D. add 7 percent to the total project cost of labor.

13. If your employees prefer to work second shift, they prefer to work from

A. 7 a.m. to 3 p.m.

B. 7 a.m. to 11 p.m.

C. 3 p.m. to 11 p.m.

D. 11 p.m. to 7 a.m.

14. _______ is not suitable for jobs where outlets aren't located at standard intervals.

A. Unit pricing

B. Take-off pricing

C. Software-based estimating

D. Estimating

15. When possible, you should try not to bid jobs that have more than _______ competitors.

A. 3

B. 2

C. 4

D. 5

16. A/An _______ Worksheet contains pertinent job information, such as the job name, location, and address, as well as the name and phone number for the business owner.

A. Plan Review

B. Take-Off

C. Estimate Record

D. Direct Job Expenses

17. The second step in determining your break-even cost is to transfer the _______ from the Price/Labor Worksheets to the Estimate Summary Worksheet.

A. occupational fees

B. sales tax

C. material cost

D. labor burden

18. How much must sales increase per year to cover the cost of a software estimating system based on a cost of $3,000 with an expected life of 6 years and a gross profit margin of 25 percent?

A. $3,000

B. $500

C. $2,000

D. $18,000

19. What percentage of the total material cost is considered an acceptable value for tools, such as ladders, cords, and screw guns?

A. 3 percent

B. 4 percent

C. 5 percent

D. 2 percent

20. Which of the following does not need to be considered when deciding on the cost of a job?

A. Competitors' labor rates

B. Parking fees

C. Site distractions

D. Cost of small tools needed

Reference no: EM13990473

Questions Cloud

Implemented on an individual and a business scale : Explain, with an example, how eco-efficiency can be implemented on an individual and a business scale.
Calculate the mean poverty rate for gender on pei : The Canadian council of social development (CCSD) has the following poverty information on males and females in PEI, Calculate the mean poverty rate for gender on PEI. Calculate the median poverty rate for gender on PEI
What characteristics make diversity training most effective : Discuss what characteristics make diversity training most effective along with at least three different approaches to diversity training.
Take stand and hire disabled person to break the ice : You are the newly hired HR manager in a family-run organization with a long standing informal policy of not hiring people with disabilities. You do a bit of investigation and discover the thought internally, that disabled workers will not be as produ..
What is the estimated labor cost for a job : What is the estimated labor cost for a job if the total adjusted estimated labor is 115 hours and the labor rate per man-hour is $23.00?
Important elements of standardizing purchased materials : You have been hired as a new procurement and supply manager at a company that manufactures and assembles construction equipment. The management team is not satisfied with the cost to manufacture and assemble the construction equipment as well as the ..
What is the magnitude of the net force on the loop : In the figure, a long straight wire carries a current I1 = 42.1 A and a rectangular loop carries current I2 = 16.2 A. Take a = 1.43 cm, b = 9.67 cm, and L = 40.5 cm. What is the magnitude of the net force on the loop due to i1?
Workshops increase sales consultants : Can the human resource manager conclude, at the 5% significance level, that the job enrichment workshops increase sales consultants' job satisfaction levels? Present your findings to the human resource manager.
Describe how operations strategy is developed : Describe how operations strategy is developed. What are competitive priorities and how is it related to operations strategy? What are “make to stock strategy”, “assemble to order strategy”, and “make to order strategy”? Examples of how one operation ..

Reviews

Write a Review

 

Microeconomics Questions & Answers

  Calculate the final cumulative impact on spending

In Central Texas College ECON 2301 , how do you calculate the final cumulative impact on spending?

  What motivated the producers of all the individual products

Think of a business firm you recently visited (such as Walmart, Home Depot, Red Lobster, Barnes & Noble, McDonald's, etc.). What motivated the producers of all the individual products in the store to make them and offer them for sale

  Measure ofwell-being and welfare of a nation are?

measure ofwell-being and welfare of a nation are?

  Compute the total expected utility from each restaurant

patricia is researching venues for a restaurant business. she is evaluating three major attributes that she considers

  Find out all pareto optimal allocations and graph

Give a definition of Pareto Optimal Allocation in this economy. Find out all Pareto optimal allocations and graph them in the Edge worth Box and also describe what is the theory of Second Best? Prove the theorem by using a diagram.

  How does the adoption of a tighter monetary policy

How does the adoption of a tighter monetary policy, like that conducted by Volcker Fed in the early 1980's affect output, inflation, and the real interest rate in the short run? In the Long run?

  Determine the equilibrium price and quantity

Assume the following market supply and demand functions Qs = 10 e0.1 P - 20, Qd = 150 e-0.2 P -Determine the equilibrium price and quantity.

  In 1999 they buy 75 heads of cauliflower for 225 80 bunches

suppose that the residents of veggieland spend all of their income on cauliflower broccoli and carrots. in 1998 they

  Differences between the terms persuasion and manipulation

Delineate the differences between the terms persuasion, manipulation and seduction as they relate to human communication.

  Discuss and classify the clinic input costs-fixed inputs

What would the number of paying patients and federally funded seniors be if the federal funding agency raised its rate to $120 per treatment?

  Analyze how production and cost functions in the short run

Analyze how production and cost functions in the short run

  Calculate the herfindahl-hirschman index for the industry

Calculate the six firm concentration ratio and Herfindahl-Hirschman index for this industry. What does each of these measures have to say about the degree of concentration in the industry

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd