What is the change in internal energy of the system

Assignment Help Civil Engineering
Reference no: EM13557071

A closed system undergoes a constant pressure process from state 1 to state 2. The volume of the system is doubled from 1 m^3 to 2 m^3 while 200 kJ of heat is added to the system. If no work is done except for the boundary displacement work and the pressure remains constant at 101.3 kPa (1 atm) throughout the process,

(a) what is the change in internal energy of the system? Assume the displacement work in a (fully resisted) constant pressure process is given by (*sub 12 means from stage 1 to 2) Wsub12=p(Vsub2-Vsub1).

(b) develop an algebraic expression for the heat added in terms of properties of the system assuming a quasi-equilibrium constant pressure process.

Reference no: EM13557071

Questions Cloud

Calculate the change in length of a 30m measuring tape made : Calculate the change in length of a 30m measuring tape made of steel when its temperature changes by 84 F. The coefficient of thermal expansion for steel is x = 3.1 x 10^-6 per C
Determine the temperature rise : A 45 W electric mixer is operated for 5 minutes while mixing a 2 kg shake. Assume Csubv=4200 J/kg-K for the liquid. Determine the temperature rise (in degrees C) of the milk shake.
Neglecting drive train losses what is the average power : A cyclist rides up a local mountain at an average speed of 11 mph. The road has an average grade of 5.5%. The cyclist and her bike have a combined mass of 75 kg. The force from road drag is 2.5 N and the aerodynamic drag (in Newtons)
Sub 12 means from stage one to two heat transfer : Sub 12 means from stage one to two. Heat transfer (Qsub12) occurs to a fluid of mass m whose volume increases at a constant pressure of 21 bar. Assume that the fluid is air (Csubv=0.718 kJ/kg *K and R=0.287 kJ/kg*K) and that Tsub1=725K and Tsub2=1100..
What is the change in internal energy of the system : What is the change in internal energy of the system? Assume the displacement work in a (fully resisted) constant pressure process is given by (*sub 12 means from stage 1 to 2) Wsub12=p(Vsub2-Vsub1).
What should the spring stiffness be if the spring : A 2 kg block is projected up a frictionless plane with and initial speed of 8 m/s. The plane is inclined upward at 30°. If the block travels 5 m before striking a linear spring, what should the spring stiffness be if the spring compression is to be l..
What is the concentration of bod in the river-wastewater mix : Compare the monolithic approach, the layered approach, and the microkernel approach in terms of degree of difficulty to debug, portability, efficiency, and degree of structure.
How much heat energy is radiatred from each of the disk : Given the heat transfer of the disk rotor is 120 W/m2/K, how much heat energy is radiatred from each of the disk rotors when the ambient air temperature is 30 C
What is the concentration of particles in the air : A hi-vol clean filter weighs 18.00 g. After a 24 hour sampling period the filter is removed and weighs 18.65 g. The initial flow rate through the filter was 2.5 m3/min. When the filter was removed the flow rate through the filter was 1 m3/min. What i..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the specific gravity of the soil solids

A soil has a moisture content of 31.4%, a degree of saturation of 90% and a unit weight of 17.3kN/m^3. Determine the specific gravity of the soil solids.

  Calculate the net volume of earthworks needed or available

The following data represents, in square meters, the cross-sectional areas along a short portion of highway. Calculate the net volume of earthworks needed or available over the portion of the highway.

  Determine the magnitudes of the velocity v and acceleration

A particle which moves in two-dimensional motion has coordinates given in inches by x=t^2-4t+20 and y=3sin2t, where the time t is in seconds. Determine the magnitudes of the velocity v and the acceleration a and the angle between these two vectors..

  Determine the cost of capital for the company

a new space age development corporation in wichita kansas has borrowed a sum of $4M from a friendly bank at an interest rate of 9%. the company has also borrowed another $1M from other sources at an interest rate of 8%.

  Assume atmospheric pressure at the outlet section

The propellor is situated at the end of the tunnel wherethe area is 10 m2 (rigth before the tunnelis opened to the atmosphere). So I used the energyequation, but I have two unknows: pressure P of thetest section, and the shaft work hT orhP (I am not ..

  Find what is the concentration of the mixture of the stream

A pickle producing plant produces and discharges a waste brine solution with a salinity of 13,000 mg/L NaCl at a rate of 0.14 MGD into a stream. Before the discharge enters the stream, the flow rate of the stream is 1.2 MGD and the salinity is 20 ..

  Explain metallurgical balance in mineral processing

Metallurgical balance in mineral processing, Assume 2000 short tons of ore were mined, 200 tones were rejected as waste and the tonnage accepted for metallurgical treatment

  Find angular acceleration needed to keep prisoner in beam

Find the angular velocity and angular acceleration needed to keep the prisoner in the beam of the spot light at the moment when the prisoner is 4000 ft away from the spot light.

  Determine the force arm oa exerts on the smooth cylinder

If arm OA rotates with a constant clockwise angular velocity of theta dot(first dirivatie)=1.5 rad/s. determine the force arm OA exerts on the smooth 4-lb cylinder B when theta=45 degrees.

  Determine the specifications for the elastic cord to be used

Determine the specifications (unstretched length and springconstant k) for the elastic cord to be used at a bungee-jumping facility. Participants are to jump from a platform 150 ft above the ground.

  Determine critical depth in circular pipe of 36 inches dia

determine critical depth in a circular pipe of 36 inches diameter and roughness coefficient of 0.015 The flow rate is 15 cfs , So = 0.002

  How many gallons of water per cubic yard should be added

given moisture contents of 5%, 9%, 14%, 22% and 25% with corresponding weights of 3.1, 3.42, 3.78,3.85, 3.77 lbs. of the compacted soil. (specific gravity =2.7)(compaction test using compaction mold of 1/30 ft^3).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd