What is the bod5 of the river water

Assignment Help Civil Engineering
Reference no: EM13560431

1.An open traverse that runs from A through H has the following deflection angles: B = 6o25' R; C = 3o54' R; D = 11o47' R; E = 20o02' L; F = 7o18' L; G = 1o56' R. If the bearing of AB = N 20o40' E, compute the bearings of the remaining sides.

2.A 150-mL sample from a lake was used to determine TSS. A rinsed and dried filter weighed 0.3588 grams before the sample was filtered and then weighed 0.3630 grams after the sample was filtered and being at dried at 103C. What is the TSS for this sample?

3.A BOD5 test sample of river water has the following test data. DO on day 0 = 7.9 mg/L. DO on day 5 = 2.3 mg/L. What is the BOD5 of the river water?

4.A 250 cubic meter reaction tank contains a waste water having an ultimate BOD concentration of 755 mg/L. If the BOD reaction rate constant is -0.352/day, how much BOD is remaining after 12.0 days?

Reference no: EM13560431

Questions Cloud

Determine the thickness for the slab and select the size : A solid one-way slab is to be used for a framing system similar to that shown. Column spacing is 33 ft, with regularly spaced beams occurring at 11 ft center to center.
Determine all components at the reactions at the pin support : A suburban street receives storm water runoff at a rate of 2.0 L/m-s (one each side). the street has a slope of .8 percent and a cross slope of 2 percent, n = .013. If the street is 10 m wide and can be totally covered by water (depth = 0 at the midp..
Why we were given the radius of the sheave : Accounting for all the moment equations at Point O is throwing me off. The collar at A seems to be a fixed body that would induce a moment? Also why we were given the radius of the sheave @ point C is confusing.
What is the longest amount of time that the particle can : A particle enters a 20 meter long rectangular settling tank an travels with the flow at a horizontal velocity of 0.09 meters per second. If the tank is 2 meters deep and the particle enters the tank at the surface of the water, what is the longest am..
What is the bod5 of the river water : A 250 cubic meter reaction tank contains a waste water having an ultimate BOD concentration of 755 mg/L. If the BOD reaction rate constant is -0.352/day, how much BOD is remaining after 12.0 days?
Define the control variables and formulate the mathematical : No more than 12 units of TV, 40 units of radio and 25 units of direct mail are available. A minimum of 9 units of radio and 5 units of direct mail must be purchased.
Determine the increment of vertical stress there : Constructing the foundation causes changes in the levels of vertical stress at all points in the soil. One such point lies at the centre of the footing plan and is at a depth of 10m. Determine the increment of vertical stress there.
Find the maximum principal effective stress at failure : Given the initial effective stress state at a point within a soil mass (s_y=2.5 daN/cm2, s_x=1.5 daN/cm2, t_xy=t_xy=0.4 daN/cm2) and effective soil shear strength parameters at the same point (friction angle=30 degrees, cohesion=0.5 daN/cm2)
Comment on the water discharge rate for maximum power : During the recent camping trip, a curious junior engineering student (like yourself) noticed that water is being discharged from a high reservoir to a stream in the valley through a 0.3 m diameter plastic pipe. The difference in elevation between the..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the largest allowable length of the aluminum bar

Using the aluminum alloy 2014-T6, determine the largest allowable length of the aluminum bar AB for a centric load P of magnitude (A) 150 kN b=50 mm h=20 mm

  Water at 20 c is proposed to be is siphoned from a

water at 20 c is proposed to be is siphoned from a reservoir as shown. assume no losses. for d 10 cm and d 16 cm

  Construct a choice table for interest rates from

QZY, Inc. is evaluating new widget machinesoffered by three companies. The machines have the following characteristics:

  Determine the required pumping rate of the construction

It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumps are to be used in 0.5-m diameter wells at the four corners of the site.

  Calculate the force that the bolt must put on the hatch

A circular hatch, 2-m in diameter has its top 10-feet under water ( fresh water s.g. = 1.0), and is hinged on the bottom, and held closed on the top with a single bolt. Perform a moment balance about the hinge

  Consider a cantilever mass-less beam subjected to a

consider a cantilever mass-less beam subjected to a concentrated mass at the tip of the beam.nbspassume length l

  Sufficient collapse strength

Would a 30 slot stainless steel screen (2.0 m long; located at the bottom of the well) have sufficient collapse strength for this application?

  Determine the reaction at a and b by a pin

Three loads are applied to a beam. the beam is supported by a roller at A and by a pin at B. neglecting the weight of the beam, determine the reaction at A and B when P=15kips.

  Determine the force members bc, fc, and fe

Determine the force members BC, FC, and FE, and state if the members are in tension or compression.

  A 1kg ball is dropped from the top of a cliff and falls

a 1kg ball is dropped from the top of a cliff and falls with a constant acceleration due to gravity. assume that

  Determine the coliform concentration at pacific ocean beach

An ocean outfall diffuser that discharges treated wastewater into the Pacific Ocean is 500m from a public beach. The wastewater contains 105 coliform bacteria per milliliter. The wastewater discharge flow rate is 0.3 m3/s.

  Determine the new reading along the inclined leg

If the pressure in pipe B is decreased 10 kPa and the pressure in pipe A remains unchanged, determine the new reading along the inclined leg of the mercury manometer.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd