A production process is used to produce 20 different items, under intermittent batch production.  When inventory or projected inventory of an item drops to a certain level, a production order is released for Q units of that item.  Because product demand is random, production orders create a random pattern of jobs released for production.  Jobs in queue are processed by order of release date, i.e., first in/first out.

For simplicity, assume all 20 items have the same demand rate (about 20,000 units annually for each item), with demand for all items occurring at a uniform rate throughout the year.  Moreover, all 20 items have the same production rate (the production line runs at 100 units per hour), and the same setup/changeover time (3 hours). 

The plant runs 3 shifts in round-the-clock operations, on a 5-day work week (250 days per year).  Of the 24 hours per day, about 16.33% are consumed by shift changes, breaks, maintenance, machine breakdown, etc.  This leaves an effective capacity of approximately 20 hours per day, available for setups and running the line.

The items in question all sell for $50 per unit.  Direct materials cost is about $20 per unit.  One process operator (required for both setup and running the line) earns $15.00 per hour.  Historically, the process has been changed over about 300 times per year, for a total of about 900 hours of lost production time.  A total of about $1500 of setup-related scrap material is generated annually.  The carrying cost rate is 20%. 

You are going to conduct an EOQ analysis for the proper order quantity (lot size) for these items.  Since we have 20 identical items (just to simplify the problem), they will all have the same optimal lot size.  Your assignment is to review the simple EOQ model, and compute what the EOQ formula would suggest as the optimal lot size. 

What is annual demand for a single item (D)?

What is the annual carrying cost per unit (H) ?

What is the cost per order (per setup) (S)?

What would the EOQ formula, Q =uggest as the optimal lot size?

 

 

Reference no: EM13301475

Questions Cloud

What is the desired ending inventory : What is the desired ending inventory?
Explain ammonium carbamate can dissociate into gases : Ammonium carbamate can dissociate into gases at 25 C according to the reaction: NH2COONH4(s) 2NH3(g) + CO2(g) If sufficient ammonium carbamate is sealed in a flask, the total pressure will be 0.117 atm at equilibrium. What is the value of Kp at ..
At what angle with the ground is the shell projected : A 1350 kg cannon, which fires a 70 kg shell with a speed of 606 m/s relative to the muzzle, At what angle with the ground is the shell projected
What are the firm marginal and average tax rates : What are the firm's marginal and average tax rates on taxable income?
What is annual demand for a single item d : A production process is used to produce 20 different items, under intermittent batch production.  When inventory or projected inventory of an item drops to a certain level, a production order is released for Q units of that item.  Because product dem..
What is the kinetic energy of the flywheel after charging : Delivery trucks that operate by making use of energy stored in a rotating flywheel have been used in Europe. What is the kinetic energy of the flywheel after charging
Calculate the internal rate of return : The initial outlay associated with the expansion would be $1,950,000, and the project would generate free cash flows of $450,000 per year for six years. The appropriate required rate of return is 9 percent.
Compute the ph you would expect to measure : calculate the pH you would expect to measure if 15.0mL of 0.5M acetic acid were mixed with 25.0mL of 0.5M sodium acetate
Compute the market value of the bonds : Sincere Stationery Corporation needs to raise $500,000 to improve its manufacturing plant. It has decided to issue a $1,000 par value bond with a 14 percent annual coupon rate and a 10 year maturity. The investors require a 9 percent rate of retur..

Reviews

Write a Review

Project Management Questions & Answers

  Computing the total cost for loan

Compute the total cost for each loan and calculate based on paying off option A in 15 years.

  Finding maximum price that company willing to pay

If IRR is 15%, would you please tell me how to find out the maximum price that the company would be willing to pay for the new equipment? Ignore taxes.

  Benefits of using various quality tools during dmaic

Discuss the importance of using quality tools in the DMAIC process. What are the benefits of using various quality tools during DMAIC?

  Evaluate the break-even point

Separate the expenses between fixed and variable cost per unit. Using this information and the sales price per unit of $6, evaluate the break-even point.

  Advantages of functional organization structure

Shwo the advantages of the functional organization structure outweigh the disadvantages?

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Generate a unit demand forecast for a product

As a consultant you have been asked to generate a unit demand forecast for a product for Year 2014 using exponential smoothing.

  What it management changes should leslie request

What IT management changes should Leslie request that would likely increase the success of the IT acquisition projects and describe for each change why it would likely increase IT project success.

  Time management strategies to maximize the amount of time

Speculate on at least two time management strategies you can implement to maximize the amount of time you have at your disposal everyday. Describe how these strategies might be implemented.

  Explain the basic tools used by project manager

Explain the basic tools used by project manager and relate this to applications such as Excel, MS project and other packages that automate these processes.

  Estimates critical to effective project management

Why are accurate estimates critical to effective project management? Please explain in detail.

  Computing net salvage value of the asset

What is the net salvage value of the asset? List the NET cash flows of year 1 through year 5.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd