What estimating techniques should be used for a mission

Assignment Help Operation Management
Reference no: EM1390295

Three years ago the Sharp Printing (SP) strategic management group set a goal of having a color laser printer available for the consumer and small business market for less than $200. A few months later the senior management met off-site to discuss the new product. The results of this meeting were a set of general technical specifications along with major deliverables, a product launch date, and a cost estimate based on prior experience.

Shortly afterward, a meeting was arranged for middle management explaining the project goals, major responsibilities, the project start date, and importance of meeting the product launch date within the cost estimate. Members of all departments involved attended the meeting. Excitement was high. Although everyone saw the risks as high, the promised rewards for the company and the personnel were emblazoned in their minds. A few participants questioned the legitimacy of the project duration and cost estimates. A couple of R&D people were worried about the technology required to produce the high-quality product for less than $200. But given the excitement of the moment, everyone agreed the project was worth doing and doable. The color laser printer project was to have the highest project priority in the company.
Lauren was selected to be the project manager. She had 15 years of experience in printer design and manufacture, which included successful management of several projects related to printers for commercial markets. Since she was one of those uncomfortable with the project cost and time estimates, she felt getting good bottom-up time and cost estimates for the deliverables was her first concern. She quickly had a meeting with the significant stakeholders to create a WBS identifying the work packages and organizational unit responsible for implementing the work packages. Lauren stressed she wanted time and cost estimates from those who would do the work or were the most knowledgeable, if possible. Getting estimates from more than one source was encouraged. Estimates were due in two weeks.
The compiled estimates were placed in the WBS/OBS. The corresponding cost estimate seemed to be in error. The cost estimate was $1,250,000 over the senior management estimate; this represents about a 20 percent overrun! The time estimate from the developed project network was only four months over the top management time estimate. Another meeting was scheduled with the significant stakeholders to check the estimates and to brainstorm for alternative solutions; the cost and time estimates appeared to be reasonable.

Some of the suggestions for the brainstorming session are listed below.
- Change scope.
- Outsource technology design.
- Use the priority matrix (found in Chapter 4) to get top management to clarify their priorities.
- Partner with another organization or build a research consortium to share costs and to share the newly developed technology and production methods.
- Cancel the project.
- Commission a break-even study for the laser printer.

Very little in the way of concrete savings was identified, although there was consensus that time could be compressed to the market launch date, but at additional costs.

Lauren met with the marketing (Connor), production (Kim), and design (Gage) managers who yielded some ideas for cutting costs, but nothing significant enough to have a large impact. Gage remarked, â€Å"I wouldn't want to be the one to deliver the message to top management that their cost estimate is $1,250,000 off! Good luck, Lauren.

Q1. At this point, what would you do if you were the project manager?

Q2. Was top management acting correctly in developing an estimate?

Q3. What estimating techniques should be used for a mission critical project such as this?

Reference no: EM1390295

Questions Cloud

Determining stem and leaf-dot plot : How many observations were in the original data set? In the bottom row of the stem and leaf display identify the stem the leaves and the numbers in the original data set represented by this stem and its leaves.
Armentrout broadened his product line and offering coffee : Armentrout broadened his product line, offering coffee, soft drinks, and breakfast items such as muffins and bagels He had become t friendly with a number of customers who often shopped to discuss the latest new's in the express
Determine expected number of females in the summer : My favorite bird is the black crowned night heron. The relative proportion of males to females is hypothesized to vary with season.
Company yearly costs for the next five years : A startup company began manufacturing toy dolls tailored to environmental-oriented customers. Using linear regression, find a linear model for the Cost Function if the company's yearly costs for the next five years were (2005,$8,000,000),(2006,$1..
What estimating techniques should be used for a mission : Was top management acting correctly in developing an estimate? What estimating techniques should be used for a mission critical project such as this?
American mortgages-broiler chicken : The data consists of random sample of 30 households from the 2007 American Community Survey. Construct a frequency distribution and a histogram for each data set.
Large sample of null alleles of the gene : A certain Drosophila protein-coding gene has one intron. If a large sample of null alleles of the gene are examined, will any of the mutant sites be expected in the
Evaluate the tooltimes total variance : Overhead is applied on the basis of direct labor hours. Coen's total overhead variance and evaluate the ToolTime's total variance
A fast-food restaurant buys hamburger buns : A fast-food restaurant buys hamburger buns from a national bakery supplier. The daily usage of buns at the restaurant is normally distributed with an average of 160 and standard deviation

Reviews

Write a Review

Operation Management Questions & Answers

  Illustrate what is multifactor productivity ratio

University fans support $192 ticket price increased overhead cost to 30000 from 25000 per section increase average class size.  Illustrate what is multifactor productivity ratio.

  Illustrate what is the difference between the two

Illustrate what is the difference between the two. Explain how would you resolve this dilemma if you were Jack or Jenny.

  Illustrate what is number of late jobs

A single machine work center has 5jobs assigned to it. Using first-come-first-served priority rule, illustrate what is number of late (tardy) jobs.

  Estimate using air carrier service to ship the cards

Baseball Card Emporium (BBE) of Lewistown, Pennsylvania, is a distributer or of baseball cards to sports card retailers. Estimate using air carrier service to ship the cards.

  Explain self-managed teams present management

Explain however, self-managed teams present management also leadership challenges. Illustrate what factors find out team performance.

  Illustrate what suggestions can you offer to address

Consider this with regard to both strategy formulations also strategy implementation. Illustrate what are shortcomings of using measures to justify project selection also illustrate what suggestions can you offer to address se shortcomings.

  Analyze at least two instructional strategies

Analyze at least two instructional strategies that could be used when developing cross-cultural training for an organization, with the focus addressing the various parts of the training design model presented throughout the textbook.

  A worker-machine operation was found to involve

A worker-machine operation was found to involve 3.6 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker's time averaged 2.5 minutes per cycle

  Examine how several other non-room departments forecast

The room's forecast is a tool for managers throughout the hotel; it is not for the front office alone. List also examine how several other non-room departments (housekeeping, food also beverage, etc.) would use the rooms forecast.

  Explain how such firms can overcome the obstacles

From institution based and resource based views identify the obstacles confronting MNE's from emerging economies interested in expanding overseas.

  The challenger system has a maximum useful life

The challenger system has a maximum useful life of 5 years, a uniform AOC cost of $20,000 over its useful life, and a $10,000 salvage value anytime it is replaced.

  Expand the sport globally

Expand the sport globally, Constant comminent to providing top of the line products and services.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd