What are the types of taxable transactions

Assignment Help Other Subject
Reference no: EM131945654

Instructions for Students:

Whilst researching and writing your project it is important to:
- Read the Assessment description carefully.
Assessment should be in a Word format.
- Assemble and analyze a set of sources that you have determined are relevant to the issues you are investigating.
Acknowledge clearly when and how you are drawing on the ideas or phrases of others;
- Consult your Assessors when you are unsure about how to acknowledge the contributions of others to your thought and writing.
- Read the Plagiarism policy and procedure carefully to understand the consequences that you could face if your work is plagiarized.
Student can seek clarification regarding the assessment required to be done.
- Students can ask for reasonable time from Assessor for preparation of project or Assessment. Students can seek information on additional reading material and reference for completion of the assessments.
Students with special needs can seek assistance from Assessors depending upon the nature of the need.
- Submit this document along with your Assessment work.

Assessment 1 - PROJECT

You are working for a local builder, who has just sold a new house which is to be constructed.

The home is a large 3 bedroom house that includes a large open plan living area, accessible from the rumpus, bedrooms and courtyard. This house is a quality home for an affordable price.

The home payment structure follows a standard HIA Victorian New Homes Contract, and is as follows:

Deposit

5%

$13,274

Base Stage

10%

$26,546

Frame Stage

15%

$39,819

Lock-up Stage

35%

$92,912

Fixing Stage

25%

$66,366

Completion

10%

$26,546

Total Contract Price (Excluding Variations)

$265,463

For this assessment, you are required to prepare an budget for the construction of this house. You are required to research appropriate costings to ensure the budget is relevant to current expected construction expenses. You will need to use your building and construction knowledge for this task to ensure all stages are covered, including:
Expected Site Costs
Security of premises (fencing)
- Surveying
- Plumbing / Electrical
- Base Stage - Foundation ("M" Class Slab)
- Framing
- Lock-up - External wall cladding. Roof coverings, Flooring, External Doors / windows
- Fixing - Internal cladding, architraves, skirting, doors, built in shelves, baths, basins, troughs, sinks, cabinets, cupboards
- Completion (Refer to provided fixture list)

Be sure to
- Undertake discussions with stakeholders (Your Assessor will role play these parts) to determine any specific budget objectives and set milestones and / or performance indicators

- Discuss and review assumptions and budget parameters-review these during the budget process as needed.
- Clearly details any Cash, expenditure and revenue items
- Ensure your budget objectives are clear & conform with the business' expectations
- Include milestones and performance indicators to monitor financial performance
- Include a detailed breakdown of your annual budget into stages as required by the business
- Identify any financial risks and incorporate protection strategies according to business

Details: Students should keep the following points in mind when creating the budget
- Identify the non-current asset requirements and consider alternative asset management
strategies
- Prepare cash flow projections to enable business operation in accordance with business plan and legal requirements
Select budget targets to enable ongoing monitoring of financial performance Relevant taxes such as GST and BAS should also be included.

Students must ensure that estimates of future cash flow, costs and revenues are realistic in context of the available information at the time of creating the budget. Changes in circumstances should be anticipated as best as possible with particular emphasis on financial risks and creating protection strategies in accordance with organisational procedures. Any liaison with the proprietor of the business to determine milestones, policies, goals etc. should be carried out with your Assessor, who will role play the relevant parts.

ASSESSMENT 2 - STUDENT INFORMATION

Whilst researching and writing your assessment, it is important to:
- Read the Assessment description carefully.
- Assessment should be in a Word format.
- Assemble and analyze a set of sources that you have determined are relevant to the issues you are investigating.
- Acknowledge clearly when and how you are drawing on the ideas or phrases of others; Consult your Assessors when you are unsure about how to acknowledge the contributions of others to your thought and writing.
- Read the Plagiarism policy and procedure carefully to understand the consequences that you could face if your work is plagiarized.
- Student can seek clarification regarding the assessment required to be done.
- Students can ask for reasonable time from Assessor for preparation of project or Assessment.
- Students can seek information on additional reading material and reference for completion of the assessments.
- Students with special needs can seek assistance from Assessors depending upon the nature of the need.

Assessment 2

For this assessment, your assessor will provide you with costings relevant to your submission in Assessment 1. The costings will provide up to date figures showing a total of expenses relevant up to lock-upstage.

Part 1: Prepare an 800 word written report discussing the following:
- How has your budget matched up with actual figures?
- What figures have been overestimated / underestimated?
- What business milestones have been met or have fell short?

Part 2: You must now adapt your original budget to incorporate and respond to the information given to you by your builder. Undertake the following tasks:
- Give a detailed comparison of budgeted forecasts and actual figures for project commencement to lock-up stage period - include comparison trends and other graphs as required to demonstrate the information clearly and demonstrate validity of analysis.
- Prepare and analyse the budget variances
- Prepare a recommendation to your builder regarding his business' performances and
- Complete a reviewed budget taking into account the latest figures. Your builders goals are skill the same - is he on track? If not, what needs to be dome for your builders project to get back on track? Are his goals too unrealistic? Complete a feasibility report answering these questions.
- Prepare a report to give to your builder (Assessor) with your recommendations.

ASSESSMENT 3 - WRITTEN ASSESSMENT

Questions

1. Discuss measures a company may safeguard integrity in financial reporting

2. Discuss how companies can promote ethical and responsible decision making.

3. Define Accrual Accounting

4. List 2 advantages of double entry accounting over single entry

5. List the 5 types of accounts which underpin double entry bookkeeping

6. Which of the following examples would Total Assets remain unchanged?

7. Give 4 examples of benefits that would require Fringe Benefit Tax to be paid on them

8. What are the 4 types of taxable transactions?

9. How does a professional in the accounting profession ensure they maintain ethical practices? Discuss.

10. Give 3 examples of perceived disadvantages to budgeting

11. What is depreciation? How is it claimed? What information is required

12. List 2 advantages of double entry accounting over single entry

13. What is a sensitivity analysis? Discuss how this can impact the business budget

14. What is straight-line depreciation? Give an example.

15. Explain what is meant by the following financial information terms.

16. What do reporting entities need to report - Give 3 examples?

17. What is the FTR ACT?

18. What is the chart of Accounts?

19. List the 7 Basic Accounting Types in the Chart of Accounts in order.

20. Give an example of a budgetary deception technique.

21. Give an example of a situation that would result in an accrued expense. What happens if the expense isn't accrued?

22. What is cost underestimation? What does it result in? What usually causes this?

23. How long does a company need to keep its financial records

24. What records need to be kept for the ATO for a small business with an annual turnover of less than $2million (cash basis)

25. What information should be shown on sales and expense invoices / receipts?

26. What records relating to assets for capital gains tax purposes should be kept, and for how long?

27. What FBT records must you keep for tax purposes? How long must you keep these records?

Verified Expert

very complicated case study on budgeting of a building construction project. Entire budget of the construction, with much focus on details, was made. A report giving analysis and recommendations has also been made.

Reference no: EM131945654

Questions Cloud

What kind of network technology should be installed : What kind of (wired and wireless) network technology should be installed in the new office space in order to facilitate the mobility of the staff?
Minutes to effuse through the same barrier : Under the same conditions, the same number of moles of an unknown gas requires 7.58 minutes to effuse through the same barrier.
Differences between qualitative and quantitative research : What are the key differences between qualitative and quantitative research? What are the strengths and weaknesses of qualitative research designs?
Corp management fights the hostile bid : Your corp’s management FIGHTS the ‘hostile’ bid. Is management woking in your best intersest?
What are the types of taxable transactions : BSBFIM501A - Discuss measures a company may safeguard integrity in financial reporting and Define Accrual Accounting
Planning to go to graduate school in program of study : Pete Morton is planning to go to graduate school in a program of study that will take 2 years.
D-glucose is known to exist in two forms : D-glucose is known to exist in two forms, a and ß, which interconvert slowly but surely. At 300 K, 62% of D-glucose exists in the ß form
What are the responses available for the decision-maker : The final project for the semester challenges you to critically examine the realism and fantasy of the popular urban simulation game SimCity.
Dilute aqueous solutions are mixed together : Explain why no net heat is given off or absorbed when two dilute aqueous solutions are mixed together.

Reviews

inf1945654

8/2/2018 3:31:18 AM

Best in class assignment service with top in town experts for assignment and best in class service. Awsome work by an experienced expert thank u so much.

inf1945654

8/2/2018 3:07:41 AM

Low sheen acrylic to all internal walls, 3 coat system White flat acrylic to ceilings Gloss enamel finish to internal woodwork and internal doors HOT WATER Rinnai instantaneous Solar boosted Hot Water Service FOUNDATIONS Class 'M' concrete slab STRUCTURAL Your home is constructed to N2 wind rating &5 star energy rating with a year structural guarantee CONNECTIONS 2 external garden taps NB: Connection of services (water, electricity, sewer & stormwater) is based on a 600m2 allotment with up to 300mrn of site fall, and up to 6m front set-back. Account opening fees for electricity, gas, phone etc. are not included. Gas connection is only included if gas appliances & HWS are selected, and natural gas is available. Additional costs will apply where bottled LPG is required. Estimated earthwork costs are based on balanced cut &fill, and excludes; any importation or removal of soil to or from the site, surface drainage, retaining walls, or piers to the slab.

inf1945654

8/2/2018 3:07:41 AM

ELECTRICAL Halogen low voltage ceiling down-lights to home only Smoke detectors and safety switches (earth leakage detectors) TV point (1) and Phone point (1) Generous amount of double power points CEILINGS 2440 (overall plates) standard ceiling height to the home. (2610 to Garage) Two storey 2440mm ground floor and 2440mm first floor PLASTER 10mm plaster sheets, villaboard to walls near plumbing 55mm Scotia cornice FIXING 67mm MDF architraves in a choice of Pencil Round, Splayed, or Colonial profiles 87mm MDF skirtings to match architraves PAINT Low sheen acrylic to external timberwork

inf1945654

8/2/2018 3:07:04 AM

DOORS House specific feature front door with strike plate and deadlock Lockwood 'Sentinal' door lock Aluminium external sliders (with locks) to Family Room 2040 high flush panel doors throughout Gainsborough 'Sofia or 'Alyssia' or 'Venice' lever handles or hand-pulls to all internal hinged doors. BRICKS Clay bricks from Builders standard range, up to Category 1 Acrylic rendering to brickwork only where denoted on plans. (house specific) ROOFING Cement roof tiles from Builders standard range Colorbond fascias, gutters & downpipes INSULATION 23.5 Glass wool batts or R4.O blow in type insulation to the roof space of the home area only R2.O Batts to external walls of the home only, and the walls between the Garage and the home RI.3 Sisalation to all external walls and the walls between the Garage and the home

inf1945654

8/2/2018 3:06:48 AM

GARAGE Plaster-lined Garage with concrete floor Sectional panel style door to front Weatherproof hinged rear access door HEATING Brivis 'Wombat' ducted heating system FLOOR COVERINGS (From Builders Standard Range) Ceramic floor tiling to the Entry, Kitchen, Meals Area, Family Room(house specific), Laundry, Bathroom & Ensuite - 400 x 400 maximum Carpet to all other areas inside the home WALL TILING (From Builders Standard Range) Ceramic wall tiling, 2m above shower base, 650mm above Kitchen bench-tops, & 400mm above Laundry trough Skirting tiles, 100mm high to wet areas WINDOWS Aluminium awning windows (with window locks) to front elevation Aluminium sliding windows (with window locks) elsewhere

inf1945654

8/2/2018 3:06:31 AM

BATHROOM, ENSUITE & TOILETS Feature acrylic bath, set into a tiled hob. (bathroom only) Feature vitreous china hand-basin Melamine lined laminate base cabinets with laminate post formed bench-tops Polished edge mirrors to the full width of the vanity bench-top Feature mixer taps to the Basins Feature taps to the Bath & Shower Feature shower outlet Semi-frameless shower screen to ensuite and bathroom showers Polymarble shower bases Exhaust fan with draft stopper above showers Stylish Close Coupled Toilet Suites with ceramic cistern LAUNDRY Radiant 45 Litre stainless steel trough in a polymer cabinet Feature wall sink set tap, chrome Wall mounted washing machine taps

inf1945654

8/2/2018 3:06:12 AM

KITCHEN Westinghouse stainless steel underbench oven (Model POH967S) 900mm and a Westinghouse stainless steel gas cook-top (Model GHP95S) 900mm. OR, ifyouprefer; Westinghouse stainless steel upright dual fuel cooker (Model DSK963S) 900mm Westinghouse stainless steel canopy rangehood (Model WRF900CS) 900mm OR Westinghouse curved glass rangehood (Model WRG950CGS) 900mm Vulcan bishlex stainless steel Dishwasher (Model DX103SK) Feature 14 bowl (1080mm) stainless steel sink Feature sink mixer tap Melamine lined laminate base cabinets with laminate post formed bench-tops Melamine lined laminate overhead cabinets 900mm refrigerator space with overhead cabinets Up to No.6 pot drawers to kitchen

Write a Review

Other Subject Questions & Answers

  Identify the most appropriate decision when conflict arises

How can ethical principles be used to identify the most appropriate decision when conflict arises?

  What you would do to help get the bill passed

What you would do to help get this bill passed if you were representing consumer groups. What you would do to change or defeat this bill if you were representing payday and title lenders.

  The causes of floods in pakistan

The Causes of Floods in Pakistan - Pakistan is highly susceptible to floods, the fact that flood is an annual occurrence

  Discuss the ethics code violated

Discuss the ethics code violated during the Volkswagen Scandals

  Examine the history of the issue through the present

Examine the history of the issue through the present, providing a condensed literature review of previous research/legislation on it and Establish Evaluation Criteria - How will you know when the problem is solved? How can you compare possible appr..

  Define the best known employers of health workers

Hospitals are the best known employers of health workers with expanding opportunities. List a minimum of two other employers that are often overlooked

  How a user could utilize ads to hide data

Explain how a user could utilize ADS to hide data and explain other destructive uses which exist for ADS. Determine how rootkits can be used as an alternative for data hiding and explicate why they can be used for this purpose

  Define three types of racism discussed in newman

Define three types of racism discussed in Newman. Explain how discrimination has been built into our social system so that institutions can end up racist even if the individuals within them are not.

  Analyze the implementation of technology

analyze the implementation and eventual widespread use of XYZ technology to prevent network intrusions

  How you would apply the theory of constraints

Speculate how you would apply the theory of constraints to this medical practice. Explain your position and support your answer.

  How global warming affecting the arctic wolves

I need 3 sources about the Arctic wolves. The first source about how global warming affecting the Arctic wolves? Second source, what are the things that are connected with this problem?

  Explain three disadvantages of federalism

Identify and describe at least two ways in which American federalism has changed since the ratification of the Constitution. Discuss one advantage or disadvantage of federalism most relevant to you.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd