What are the main challenges for change in organization

Assignment Help Operation Management
Reference no: EM131375344

Organizational Innovation and Change (PLAED):

1) What are the main challenges for change in an organization?

2) Identify examples within the case study below that relate to the challenges listed in question one?

Casese Study 11.3 in Palmer, I., Dunford, R., & Akin, G. (2016). Managing Organizational Change: A Multiple Perspectives Approach (3rd ed.). New York, NY: McGraw Hill. The Challenger Disaster On January 28, 1986, the space shuttle Challenger rose into the sky, its seven crew strapped into their padded seats while the 2,000-ton vehicle vibrated as it gained speed and altitude. The launch was going perfectly. Seventy seconds had passed since liftoff and the shuttle was already 50,000 feet above the earth. From NASA Mission Control at Houston’s Johnson Space Center, Spacecraft Communicator Richard Covey instructed, “Challenger, go at throttle up.” “Roger, go at throttle up,” replied Challenger commander Dick Scobee. In the next few seconds, however, Challenger experienced some increasingly violent maneuvers. The pilot, Mike Smith, expressed his sudden apprehension: “Uh-oh.” In Mission Control, the pulsing digits on the screen abruptly stopped. Mission Control spokesman Steve Nesbitt sat above the four console tiers. For a long moment he stared around the silent, softly lit room. The red ascent trajectory line was stationary on the display screen. Finally he spoke: “Flight controllers here looking very carefully at the situation. Obviously a major malfunction.” Headed by former secretary of state William Rogers, the Presidential Commission that was set up to investigate the cause of the Challenger disaster had little trouble identifying the physical cause. One of the joints on a booster rocket failed to seal. The “culprit” was one of the synthetic rubber O-rings that were designed to keep the rockets’ superheated gasses from escaping from the joints between the booster’s four main segments. When one of the O-rings failed, the resulting flames burned through the shuttle’s external fuel tank. Liquid hydrogen and liquid oxygen then mixed and ignited, causing the explosion that destroyed Challenger. However, the Rogers Commission investigations also revealed a great deal about the internal workings of NASA. It was a geographically dispersed matrix organization. Headquarters were in Washington, DC, where its most senior managers, including its head, NASA administrator James Begg, were mainly involved in lobbying activity, reflecting the dependence on federal funds (and its vulnerability to fluctuations in funding). Mission Control was located at the Johnson Space Center in Houston, Texas. All propulsion aspects—main engines, rocket boosters, fuel tanks—were the responsibility of the Marshall Space Center in Huntsville, Alabama. Assembly and launch took place at the Kennedy Space Center, Cape Canaveral, Florida. These various centers existed in an uneasy alliance of cooperation and competition. The Marshall Center in particular was known for its independent stance based on its proud tradition going right back through the Apollo program to the early days of rocketry with Werner von Braun. One manifestation of this pride, reinforced by its autocratic leader William Lucas, was that loyalty to Marshall came before all. Any problems that were identified were to be kept strictly “in-house,” which at Marshall meant within Marshall. Those who failed to abide by this expectation—perhaps by speaking too freely to other parts of NASA—could expect to receive a very public admonishment. Marshall was also at the center of a “can-do” attitude within NASA, supporting the idea that great objectives are achievable if only the will is there. Born of the Apollo success, this took form in Marshall as pride in the achievement of objectives and strongly held views that if a flight was to be delayed for any reason, it would never be because of something caused by Marshall. The Commission also concluded that NASA was working with an unrealistic flight schedule. The formal schedule demanded twelve flights in 1984, fourteen in 1985, seventeen in 1986 and again in 1987, and twenty-four in 1988. In practice, NASA had managed five launches in 1984 and eight in 1985. Congressional critics had begun to question the appropriateness of continuing the current (high) level of program funding when NASA was falling so far short in meeting its own goals. However, rather than revise its schedules, these were retained and senior NASA managers increased the pressure on staff and contractors to meet the schedules. Most of the design and construction work in the shuttle program was contracted out. One of the contractors was Morton Thiokol, a Brigham City, Utah-based company that had won the contract to produce the solid rocket boosters. At the time of the Challenger launch, Thiokol and NASA were in the middle of contract renewal negotiations. The Commission revealed that there had been doubts about the reliability of the O-rings for some time. Since 1982, they had been labelled a “criticality 1” item, a label reserved for components whose failure would have a catastrophic result. However, despite evidence of O-ring erosion on many flights, and requests from O-ring experts both from NASA and Thiokol that flights be suspended until the problem was resolved, no action had been taken. There was no reliable backup to the O-rings. This violated a long-standing NASA principle, but each time a flight was scheduled, this principle was formally waived. A cold front hit Cape Canaveral the day before the scheduled launch. Temperatures as low as 18°F were forecast for that night. Engineers from Thiokol expressed their serious reservations about the wisdom of launching in such conditions because the unusually cold conditions at the launch site would affect the Orings’ ability to seal. As a result, a teleconference was called for that evening. At the teleconference, Roger Boisjoly, Thiokol’s O-ring expert, argued that temperature was a factor in the performance of the rings, and Robert Lund, Thiokol’s vice president for engineering, stated that unless the temperature reached at least 53°F, he did not want the launch to proceed. This position led to a strong reaction from NASA, and from Lawrence Mulloy, Marshall’s chief of the solid rocket booster program, and George Hardy, Marshall’s deputy director of science and engineering. Hardy said that he was “appalled” at the reasoning behind Thiokol’s recommendation to delay the launch, and Mulloy argued that Thiokol had not proven the link between temperature and erosion of the O-rings, adding, “My God, Thiokol, when do you want me to launch, next April?” A view expressed at the Commission was that the Thiokol engineers had been put in a position where, in order for a delay to be approved, they were being required to prove that the O-rings would fail, rather than to prove that they would be safe at the low temperatures before a go-ahead was approved. The teleconference took a break, to allow the Thiokol management team to consider their position. The Thiokol engineers were still unanimously opposed to a launch. Jerald Mason, Thiokol’s senior vice president, asked Robert Lund to “take off his engineering hat and put on his management hat.” Polling just the senior Thiokol managers present, and not any of the engineers, Mason managed to get agreement to launch. The teleconference was then reconvened. The Thiokol approval was conveyed, no NASA managers expressed any reservations, and the OK to launch was given. Post-Challenger Changes at NASA The Commission’s recommendations included that NASA restructure its management to tighten control, set up a group dedicated to finding and tracking hazards with regard to shuttle safety, and review its critical items as well as submitting its redesign of the booster joint to a National Academy of Sciences group for verification. The official line within NASA was that the necessary changes had been successfully implemented. A NASA news release on January 22, 1988, stated that: In response to various reviews of NASA safety and quality programs conducted in the aftermath of the Challenger accident and associated recommendations for improvements, NASA has acted to elevate agency emphasis on safety and implement organizational changes to strengthen SRM&QA [Safety, Reliability, Management & Quality Assurance] programs. There has been a 30 percent increase in NASA personnel assigned to SRM&QA functions since January 1986. The Columbia Disaster On February 1, 2003, the space shuttle Columbia’s braking rockets were fired as the shuttle headed toward a landing at Kennedy Space Center. As it passed over the United States, observers spotted glowing pieces of debris falling from the shuttle. At 8:59:32 am EST, commander Rick Husband replied to a call from Mission Control, but his acknowledgment ceased mid-transmission. About a minute later, Columbia broke up, killing its seven astronauts. The Columbia Accident Investigation Board (CAIB or Board) was formed to identify what had happened. In its August 2003 final report, it identified the physical cause of the accident. A 1.67-pound slab of insulating foam fell off the external fuel tank 81.7 seconds after Columbia was launched (on January 16), hit the left wing, and caused a breach in the tiles designed to protect the aluminum wing from the heat of reentry. On reentry, the breach allowed superheated gas into the wing, which, as a result, melted in critical areas. But the Board also addressed the nonphysical factors that contributed to the disaster. Because of no improvement in the level of NASA funding, NASA administrator Daniel Goldin pushed a “Faster, Better, Cheaper” (FBC) initiative that impacted on the shuttle program. The premium placed on maintaining an operational schedule, combined with ever-decreasing resources, gradually led shuttle managers and engineers to miss signals of potential danger. Foam strikes on the orbiter’s thermal protection system (TPS), no matter what the size of the debris, were “normalized” and accepted as not being a “safety-of-flight risk.” The shuttle workforce was downsized, and various program responsibilities (including safety oversight) had been outsourced. Success was being measured through cost reduction and the meeting of schedules, and the shuttle was still being mischaracterized as operational rather than developmental technology. The Board particularly identified NASA’s organization culture as being as much to blame as the physical causes. According to the Board: Though NASA underwent many management reforms in the wake of the Challenger accident, the agency’s powerful human space flight culture remained intact, as did many practices such as inadequate concern over deviations from expected performance, a silent safety program, and schedule pressure. Cultural traits and organization practices detrimental to safety and reliability were allowed to develop, including: reliance on past success as a substitute for sound engineering practices (such as testing to understand why systems were not performing in accordance with requirements/specifications); organizational barriers which prevented effective communication of critical safety information and stifled professional differences of opinion; lack of integrated management across program elements, and the evolution of an informal chain of command and decision-making processes that operated outside the organization’s rules. According to the Board: “NASA’s blind spot is that it believes it has a strong safety culture [when in fact it] has become reactive, complacent, and dominated by unjustified optimism.” The Board found that while NASA managers said that staff were encouraged to identify safety issues and bring these to the attention of management, there was evidence to the contrary, including insufficient deference to engineers and other technical experts. Also, while NASA’s safety policy specified oversight at headquarters combined 377with decentralized execution of safety programs at the program and project levels, the Board found that NASA had not been willing to give the project teams the independent status for this to actually work. The external tank of the shuttle was designed with a layer of insulation tiles that were designed to stick to the tank, not to be shed. Similarly, the shuttle’s heat shield was not designed to be damaged; the tiles were fragile, such that the shuttle wasn’t allowed to fly in rain or stay outside in hail. However, the experience of previous launches was that foam sometimes did fall off and tiles sometimes were damaged. But this was occurring without any noticeable negative effect on the functioning of the shuttle. Of 112 flights prior to the fatal Columbia flight, foam had been shed 70 times, and tiles had come back damaged every time. Over time, NASA managers got used to the idea that such damage would occur and convinced themselves there was no safety-of-flight issue. The Board reported that “program management made erroneous assumptions about the robustness of a system based on prior success rather than on dependable engineering data and rigorous testing.” The report cites eight separate “missed opportunities” by NASA during the 16-day flight to respond to expressions of concern or offers that could have assisted. For example, engineer Rodney Rocha’s email four days into the mission, asking Johnson Space Center if the crew had been directed to inspect Columbia’s left wing for damage, had been left unanswered. Also, NASA had failed to accept the U.S. Defense Department’s offer to obtain spy satellite imagery of the damaged shuttle. The CAIB faulted NASA managers for assuming that there would be nothing that could be done if the foam strike had indeed caused serious damage to the TPS. After the accident, NASA engineers, working on the request of the CAIB, concluded that it might have been possible either to repair the wing using materials on board Columbia or to rescue the crew through a sped-up launch of the shuttle Atlantis. The Board also criticized NASA managers for not taking steps to ensure that minority and dissenting voices were heard, commenting: All voices must be heard, which can be difficult when facing a hierarchy. An employee’s location in the hierarchy can encourage silence. Organizations interested in safety must take steps to guarantee that all relevant information is presented to decision makers. This did not happen in the meetings during the Columbia mission. Program managers created huge barriers against dissenting opinions by stating preconceived conclusions based on subjective knowledge and experience, rather than on solid data. The NASA Intercenter Photo Working Group had recommended that the loss of foam be classified as an in-flight anomaly—a much more critical designation than it currently had—but this was not approved by the program requirements control board. The engineers were placed in the situation of having to prove that a safety-of-flight issue existed before the shuttle program management would take action to get images of the left wing. The Board found that this was just one example of a more general situation where those concerned with safety found themselves having to prove that a situation was unsafe, whereas it might be reasonably expected that the emphasis would be on proving instead that a high level of safety existed. The Board also concluded that there was an unofficial hierarchy among NASA programs and directorates that hindered the flow of communications: Management decisions made during Columbia’s final flight reflect missed opportunities, blocked or ineffective communication channels, flawed analysis, and ineffective leadership. Perhaps most striking is the fact that management displayed no interest in understanding a problem and its implications. Because managers failed to avail themselves of the wide range of expertise and opinion necessary to achieve the best answer to the debris strike question—“was this a safetyof- flight concern?”—some space shuttle program managers failed to fulfill the implicit contract to do whatever is possible to ensure the safety of the crew. In fact, their management techniques unknowingly imposed barriers that kept at bay both engineering concerns and dissenting views, and ultimately helped create “blind spots” that prevented them from seeing the danger the foam strike posed. The Board concluded that the post-Challenger changes “were undone over time by management actions” and that “the pre-Challenger layers of processes, boards and panels that had produced a false sense of confidence in the system and its level of safety returned in full force prior to Columbia.”

Reference no: EM131375344

Questions Cloud

Market is crucial-requires good understanding of customers : Product type should meet customer needs Product type describes the goods and/or services that customers want. Sometimes the product type is strictly a physical good or strictly a service. But marketing managers who ignore the possibility that both ar..
Construction firm was the low price bidder on plan : Your construction firm was the low price bidder on a plan to build three new runways at an airport. After winning the contract, you assured the airport commissioner that your work would far exceed the minimum quality specs in the contract. With or wi..
From generic markets to product-markets : From generic markets to product-markets To understand the narrowing-down process, it’s useful to think of two basic types of markets. In contrast, a product-market is a market with very similar needs and sellers offering various close substitute ways..
What is company market : What is a company’s market? Identifying a company’s market is an important but sticky issue. In general, a market is a group of potential customers with similar needs who are willing to exchange something of value with sellers offering various goods ..
What are the main challenges for change in organization : What are the main challenges for change in an organization? Identify examples within the case study below that relate to the challenges listed in question one?  The Board concluded that the post-Challenger changes “were undone over time by management..
Decision logic is critical part of requirements collection : Accurate recording of decision logic is a critical part of requirements collection. Decision tables offer a regular approach to managing the rules (conditions and actions) on which decisions are based. Walk through the discovery and analysis of a sim..
Fighting little fires within the existing operation : Sandwich Blitz Scenario: As part of your reading you were introduced to the business case study, Refer back to the description of the company and to your textbook reading on “Levels of Planning.” The business is owned by Dalman Smith, who is the Pres..
How is critical thinking defined : How is critical thinking defined? Provide a detailed explanation that demonstrates clear, insightful critical thinking. How can you apply critical thinking in your work? Provide a detailed explanation that demonstrates clear, insightful critical thin..
Provide brief history of the affirmative action movement : Provide a brief history of the Affirmative Action Movement. How does this impact the modern work place? Explain the role and functions of the consumer product safety commission and the food and drug administration. Discuss the roles that business and..

Reviews

Write a Review

Operation Management Questions & Answers

  International standards in healthcare information systems

In the textbook, Tan and Payton state: "International standards in healthcare information systems have provided the pivotal backbone to integrating clinical knowledge discovery." Explain what this statement means and provide examples where internatio..

  Explanation for sensitivity analysis

The sensitivity analysis is a simple way to access risk. In our text the author states that a common approach is to estimate NPV based upon an optimistic.

  Is the null hypothesis one side or two sided in a test

Is the null hypothesis one side or two sided in a test to evaluate whether the product quality of two suppliers is equal?

  Roles and responsibilities of industrial safety

paper in which you synthesize the materials and information from the previous weeks into an overall industrial security plan. The following content areas are required-

  Incentive plan to fail

In your view, what might cause an incentive plan to fail? (Minimum 300 words)

  What implications do these errors have

Provide some examples in business or in sports in which a controlled process is erroneously adjusted and an out-of-control process is ignored. What implications do these errors have?

  Likelihood of support from business and government interests

Compare and contrast the regulatory alternatives in terms of the efficiency and efficacy these alternatives might provide to businesses and consumers. Next, determine which solution is the most viable, considering the likelihood of support from busin..

  Founders using a pioneering new entry strategy look

Founders using a pioneering new entry strategy look for opportunities to capitalize on proven market successes. Do you agree? Why?

  A number of quality-management philosophies hold that

a number of quality-management philosophies hold that prevention costs are the most critical quality-related costs.

  Supply chain management system-strategic goals of teds

Explain to Ted what a supply chain management (SCM) system could do for his business and how it might improve his operations. Be sure to cover the full range of SCM functionality as it applies to Old Dominion Trail Bikes. List 3 strategic goals for T..

  Categorize the inventory based on departments

Categorize the inventory based on departments, units, and teams. Include time lines for restocking resources and placing orders based on anticipated demands and usage.

  Identify three ways to develop competent team relationships

Why is the attitude of team members at least as important as their aptitude for decision making and problem solving? How is a team identity developed? Should team roles be chosen by team members? Why or why not? Identify three ways to develop compete..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd