Using the information from the Nightingale Project A (end of Chapter 9), you will create a MS Project schedule and answer the questions from the end of the case, however, you will note the following changes:
The crew work only Monday – Fridays (no weekend work) 8 hours per day.
You will submit the following
A multilevel work breakdown structure (WBS) and detailed project schedule in MS Project
A screen print (using the Windows Snipping Tool) of your project’s network schedule
An one-page response with your submission that answers the following questions:
When will the project be completed?
What is the critical path for the project?
How much slack / float is in your project? What activities have the greatest slack float
Identify the top 3 activities you fell that could impact the project completion date.
What additional activities you would add to this project to make it more complete, from a project management viewpoint.
Borrowing a portfolio of currencies offer
: If a firm borrows a portfolio of currencies, what characteristics of the currencies will affect the potential variability of the portfolio's effective financing rate? What characteristics would be desirable from a borrowing firm's perspective?
|
Find the probability of getting at least under-performing
: The probability worker to be is hardworking is 0.55 and 0.45 under-performing. Find the probability of getting at least an under-performing in an office with 4 workers.
|
Why san diego port is a local treasure for president
: Watch 2 videos and write a one page summary about each of them. The videos are about Why San Diego Port Is A Local Treasure and Bernie for president. 12 Pages Font, Double spaced. No Palgrism.
|
Write a program to evaluate the arithmetic statement
: By using an accumulator type computer with one address instructions3-By using a general register computer with two address instructions4- by using a stack-organized computer with zero-address operation instructions
|
Using the information from the nightingale project
: Using the information from the Nightingale Project A (end of Chapter 9), you will create a MS Project schedule and answer the questions from the end of the case, however, you will note the following changes: When will the project be completed? What i..
|
Confidence interval for average car insurance premium
: (a) Find a 99% confidence interval for the average car insurance premium and interpret your result. (b) What is the margin of error when using $780 to estimate the population average car insurance premium with 99% confidence? [Hint: (U-L)/2 ]
|
Determine the expected net operating income (noi) from sales
: The probabilities are 20%, 50%, and 30% for revenues of $800,000, $1,000,000, and $1,100,000 per year, respectively, and operating expenses are constant at $200,000 per year.
|
Value of the mean of the two x distributions
: Suppose an x distribution has mean μ = 5. Consider two corresponding x distributions, the first based on samples of size n = 49 and the second based on samples of size n = 81. (a) What is the value of the mean of each of the two x distributions?
|
Describe methodologies including the independent variables
: Describe methodologies, including the independent and dependent variables. How did their work add to the body of literature. Identify new ways they might have interpreted gaps in previous research.
|