This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County).  Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girders on brackets (which are attached to columns).  Secondary members are in the form of pre-fabricated T-section joists.   A shear wall system is considered for the wind load effects (note: because of the shear walls, your design will be only for DL and LL). 

 As a minimum, the following tasks are required:

1.      Develop a schematic design for the facility.  Include the locations of columns and show girders with a few cross sections (that will also show single footings for columns).

2.      Conduct a preliminary design and identify all loads (DL and LL).  Decide on the type of materials to be used.

3.      Design a typical girder.

4.      Design a typical column.

5.      Design a typical bracket.

6.      Design a typical footing

7.      Prepare detail drawings for the beam, column and footing you designed. 

Bonus points:  Additional points will be given for the design of the T-section joists and design of a typical foundation. 

Your calculation sheets must be clear and written on suggested calculation sheets.  Include a section in your report (up-front) for the specifications summarizing material properties, pertinent codes and specifications, assumptions made, etc.  Also include a critique, at the end of your report, summarizing what you found as areas that perhaps more work would have been needed and/or design should have been done differently. 

Grading will be based on:

1.      Completeness of the tasks requested.

2.      Correctness of calculations.

3.      Reasonableness of your design.

4.      Presentation of your project (as your final report).

 

5.      Professionalism in preparing your calculation sheets and drawings.

Reference no: EM13851004

Previous Q& A

  Cae 432 project

This project concerns design of a one-story parking garage in a 90x120-foot land in a North Chicago suburb (Cook County).  Cars will be using both the ground level and the roof. The suggested design for the roof is a series of simply-supported girder..

  What is the mean weight of my ancient gold coins

What is the mean weight of my ancient gold coins - How do you consider this collection, a population or a sample - However, some formats are better than others in the sense that they convey important and relevant information in the given data set.

  Dataset that can be used with the between subject design

Create a new dataset that can be used with the between subject design. You will no longer need the variables CreativePre and CreativePost Test. Instead, you will have only one variable for the score on the creativity test.

  Analyze and discuss the failure and apply the laws

Analyze and discuss the failure and apply the laws given in the text showing clearly how the application of the laws might have lessened or even prevented the failure.

  Closing case- china limits exports of rare earth materials

Closing Case- China Limits Exports of Rare Earth Materials. Which group benefitted the most from China imposing an export quota on rare earth metals? Did it give the Chinese domestic manufacturers a significant cost advantage

  The issue of the us government using technology to spy

Create your blog on the issue of the US government using technology to spy on US citizens and/or foreign nations. Remember, your article must contain an author and a date AND be from the past 12 months.

  Program demonstrates simple symmetric-key encryption

This program demonstrates simple Symmetric-key Encryption using the XOR instruction with a multi-byte key entered by the user. Use this key to encrypt and decrypt the plain text

  Design a modern network for a private high school

Design a Modern Network for a Private High School. The network is proposed to achieve the above objectives considering the school's following business and technical goals.

  Implementing a new performance appraisal system

Topic: An integrative approach to managing people issues arising from implementing a new performance appraisal system. Question: You are the team leader of an organisational and development unit within a human resources department of a large univer..

  Calculate the value of this estimate for the sample

What is the unbiased estimate of the difference in height between boys and girls? Provide a formula and check the unbiasedness. Calculate the value of this estimate for the given sample.

Reviews

Write a Review

 

Similar Q& A

  Develop a simple urban constructed wetland design

develop a simple urban constructed wetland design guidelines and drawings. your report should include the followingi.

  Explain why the architects requires a deflection limitation

The buildings are single story with a rood line 6 feet above the man-door opening is constructed from clay brick that is 12 inches thick and weighs 115 psf. the opening of the man-doors are 3 feet 4 inches wide.

  How many ton of asphalt concrete will be required to overlay

How many tons of asphalt concrete will be required to overlay a 3-mile-long, 24-ft.-wide road with 2.5 in. of wearing course asphalt concrete that has a density of 146.3 pcf

  Estimate probability that given square meter of aluminium

The number of flaws on a sheet of aluminum manufactured by a certain process follows a Poisson distribution. In a sample of 100m2 of aluminum, 200 flaws are counted.

  Determine the location on the wheel at the net acceleration

a wheel rolls to the right with an angular velocity of 2 rad/s while slowing down at a rate of 3 rad/s^2. knowing the wheel rolls without sliding and ignoring the effect of gravity determine the location on the wheel where the net acceleration is ..

  The casting has a mass of 3 mg suspended in a vertical

the casting has a mass of 3 mg. suspended in a vertical position and initially at rest it is given an upward speed of v

  Calculate distance up ramp using the work energy theorem

A 58.3 degree inclined plan has a spring with spring constant 23,400 N/m attached at the bottom.A 1.2 kg block is placed on the plane and compresses the spring a distance of 2.4 cm from equilibrium.

  What is the probability of no health hazard in 30 days

Air pollution in a city is caused by the following four sources: vehicle exhaust (V), industrial exhaust (I), dust (D), and pollen from plants and trees (T). On a particular day, the likelihood of air pollution caused by these sources is 4:3:2:1, ..

  What is effective vertical pressure at base of the stratum

A submerged stratum of clay has a thickness of 15m. The average water content of samples taken from the stratum is 54%, and the specific gravity of the solid constituents is 2.78.

  Find the maximum principal effective stress at failure

Given the initial effective stress state at a point within a soil mass (s_y=2.5 daN/cm2, s_x=1.5 daN/cm2, t_xy=t_xy=0.4 daN/cm2) and effective soil shear strength parameters at the same point

  Create a matlab program and flowchart

Create a MATLAB program and flowchart which will allow the user to input an unknown number of temperatures, each of which might be a temperature in Celsius, Fahrenheit, Kelvin, or Rankine, and will convert the user input temperature to each of the..

  What is the maximum diameter that the rod can have

Under the right conditions, it is possible, due to surface tension, to have metal objects float on water. Consider placing a short length of a small diameter steel (sp. wt. =460 lb/ft^3) rod on a surface of water.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd