Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
1. The third unit of an aircraft hangar project was completed in 2700 hours. The fifteenth unit was built in 2100 hours. What is the learning rate (based on doubled units)? How long would it take to build the hundredth unit? 2. A tower (the first one) was installed in 900 hours. The improvement rate for doubled units is expected to be 90%. a. What will be the time required to complete the fifth tower? b. The thirtieth tower? 3. The "A" value for 5 sluice gate installations was 160 hours (learning 0.90 for doubled averages). Find the average time to install 25 sluice gates. What is the time required to install the twentieth sluice gate? 4. The cumulative average time for constructing 30 electrical assemblies is 170 hours. The rate of learning for doubled averages is about 0.95. a. How much time was consumed in building the fiftieth unit? b. What was the total time required for all units after 100 units were completed? c. What total hours were needed to assemble units 100 through 150? 5. The learning rate of 0.90 on cumulative averages is realized when constructing metal storage tanks. The first unit took 1400 hours to construct. After 6 units were constructed, the hunting season opened and the entire work crew took off a total of 5 days. a. Ignoring the impact of weekends, determine the time required to complete units 7 through 12. b. If wages are $10 per hour, what was the cost of the hunting season in terms of lost productivity? 6. A learning rate of 92% on cumulative averages is realized when constructing metal storage tanks. The first tank took 1200 hours to construct. After 6 tanks were constructed, the work was stopped for two days, after which the work was resumed. Find the time required to complete units 7 through 10. a. If wages are $15 per hour, what was the cost of the delay from lost productivity? b. What was the total cost of constructing 15 tanks? 7. Study the following data: unit #1, labor cost/unit of $1000; unit #5, labor cost/unit of $900; and unit #25, labor cost/unit of 4810. Based on the trend of production costs on these units, develop a formula that will be usable to predict future costs; that is, find the value of s. Find the cost for unit 100. 8. A contractor has kept accurate records on the installation of pressure vessels in a refinery. She has the following data: Unit # 3, A = 1530; Unit #4, A = 1450; Unit #7, A = 1370; Unit #10, A = 1325; Unit #12, A= 1300; Unit#15, A= 1275. A strike delayed further installations for two weeks (16 days), before the 16th unit could be installed. The contractor had a crew size of 11 workers who receive an average wage of $18 per hour. The rental on the equipment and the company overhead is $500 per day. The contractor noted that she broke even after having completed the eighth unit. a. Find the theoretical time to complete the first unit. b. Find the learning rate (in percent).
Assume that the sludge does not change density during filtration and that liquid removed from the sludge contains no sludge. Using mass-balance method. determine the volume of sludge after filtration.
A micro-channel of diameter 0.5 mm and length 750 mm is connected to a plenum. A fan produces a negative gage pressure of -1.5 inch H2O in the plenum and draws air at 20oC into the micro- channel.
A cohesionless soil sample was subjected to a triaxial test. The sample failed when the minor principal stress (confining pressure) was 1200 lb/ft^2 and the deviator stress was 3000 lb/ft^2.
A 12-ft-long cantilever supports its own dead load plus an additional uniform service (unfactored) dead load of 0.5 kip/ft. The beam is made from normal-weight 4000-psi concrete and has in., in., and in.
The natural water content of a saturated soil is 41% and its shrinkage limit = 20%. Gs (sp. gravity of solids) = 2.75. Calculate the percentage change in volume based on its volume at its natural water content if the soil is dried to a water conte..
The pump graphs are given to us, and I'm asked to determine possible lengths and diameters of the pipe to meet two requirments. The system can have multiple outputs in order to satisfy the needs, but they must be occuring at the same time.
KNowing that after being snugly fitted, the nut at C is tightened one full turn, determine (a) the tension in rod CD, (b) the deflection of point C of the rigid member ABC
For an elevated storage tank , if the minimum allowable pressure = 300 kPa, Height of pipe system at low-pressure service location = 6 m, and head loss from tank to service location: average daily conditions = 11 m
Wastewater from a paper mill contains ultimate BOD of 200ppm and DO of 3ppm, water is discharged at a rate of 100,000 gallons per day into a river, the river has a flow of 1 million gallons per day with no BOD
A truck spils 1 gallon of benzene into an aquifer with an area= 50ft^2 Benzene has a solubility of 1750 ppm, and a specific gravity of 0.873. The aquifer ahs a porosity of 0.25, a hydraulic gradient of 0.004 and a hydraulic conductivity of 1000 gp..
Question about Spring, A 37kg object is placed onto a coil spring which has been compressed 43mm. The force used to compress the spring was 35KN.
The supplier says it would prefer to sell the company a 65% NaOH solution and the company says the water content is immaterial as long as the equivalent costs are the same including freight.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd