Table of parameter for the system substitute

Assignment Help Other Engineering
Reference no: EM13938481

Using the table of parameter for the system substitute them into your expression for Y(S) and determine and plot your expression  using  scilab or matlab  for y(t)

Parameter

Value

Units

M

100

Kg

K1

50

Nm-1

K2

5000

Nm-1

?

1

Rads s-1

B

1000

Nsm-1

Using  your expression  for G(S) from part 2 simulate the output of the system using scilab/matlab for the same  input f(t) given in equation 1. Include in your answer both the plot of the time response and the scilab/matlab code

Reference no: EM13938481

Questions Cloud

Differences between channel proteins and carrier proteins : Insulin increases glucose transport across the cell membrane of an adipocyte but not across the membrane of a liver cell. How can one hormone have two different effects?
C program that will fork a new process : Write a C program that will fork a new process. The parent side has to sort the elements of an array of size 10 in ascending order, while the child process has to sort the same array in descending order using bubble sort technique.
How is the amount of a liability measured : How is the amount of a liability measured? When are most liabilities recognized? What are current liabilities? Provide some common examples.
What type of thyroid disease does elena have : What type of thyroid disease does Elena have? hypothyroidism, Why are Elena's TSH levels elevated, but free T4 levels in the normal range? Given Elena's lab results, what would you expect her levels of TRH to be?
Table of parameter for the system substitute : Using the table of parameter for the system substitute them into your expression for Y(S) and determine and plot your expression  using  scilab or matlab  for y(t)
Users glean from an analysis of the statement of cash flows : Referencing this week’s readings and lecture, describe the following terms as they relate to the statement of cash flows: cash, operating activities, investing activities, and financing activities. What can creditors, investors, and other users glean..
Morally wrong to have a blow-dry : Is it normal to get fewer followers the more you tweet? Is technology now the fiDh element? Or is that wood?
Current cost of common equity for the firm : Underestimated Inc.’s common shares currently sell for $40 each. The firm’s management believes that its shares should really sell for $49 each. The firm just paid an annual dividend of $2 per share and management expects those dividends to increase ..
Description of the e-commerce project : Drawing on this description of the e-commerce project you are required to produce a series of documents that address the main activities and milestones of the initiation ,planning and control phases of project management.

Reviews

Write a Review

 

Other Engineering Questions & Answers

  Heat treatment of high tensile carbon steel

Explain why tempering cycle is essentially required in the heat treatment of high tensile carbon steel and what are the consequences if tempering cycle is not carried out?

  What would be stakeholders in a project

What would be stakeholders in a project

  Determining the ground-based radar

Airplanes A and B are flying at the same altitude and are tracking the eye of hurricane C. The relative velocity of C with respect to A is vC/A = 470 km/h A 75°, and the relative velocity of C with respect to B is vC/B = 520 km/h A 40°. Determine

  Determine the average temperature of the air

Determine the average temperature of the air in the balloon when the balloon first starts rising. What would your response be if the atmospheric air temperature were 25°C?

  Arena modify the airline terminal problem by adding agent

modify the airline terminal problem by adding agent breaks. the 16 hours are divided into two 8-hour shifts. agent

  Estimate the number of reports the professor

Assume that an average report is the thickness of about 10 sheets of printer paper and use a single dimensional equation to estimate the number of reports the professor would have had to grade for her claim to be valid.

  The international sale of goods (cisg)

A purchase contract must have certain considerations to be legal. Which of the following is not one of these considerations?

  Best side lobe attenuation expected under constraints

The requirements for the frequency resolution of the system specify that the largest allowable main lobe for the Kaiser window is p/100. What is the best side lobe attenuation expected under these constraints?

  Calculate the fracture stress for a crack length

Calculate the fracture stress (σc) for a crack length (2a) of 50 mm, assuming plane strain conditions. If conditions were plane stress instead.

  Determine power spectral density-autocorrelation function

Determine the power spectral density and autocorrelation function of the random process at the filter output.

  Traffic management plan for a four-lane

Write a report to develop a worksite traffic management plan for a four-lane two-way arterial road. In you plan include: The eight steps of worksite traffic management processes. The location of lead vehicle, work vehicle, shadow vehicle and tall veh..

  Design a real time flood monitoring system

Design a Real Time Flood Monitoring System based on Arduino Microcontroller.The system should monitor flood related information like Water level and Precipitation.The data collected from the sensors should be transferred to a client application via i..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd