Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 185 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 80 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 205 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if need arises, it can add a second shift of eight hours for the assembly lines. The cost of assembly labor is 30 cents per part for each assembly line; the cost of drilling labor is 10 cents per part. For drilling, the cost of electricity is 1 cent per part. The total overhead cost has been calculated as $1,200 per week. The depreciation cost for equipment has been calculated as $30 per week. Suppose a second shift of eight hours is run for assembly line 1 and the same is done for the final assembly line. In addition, four of the six drilling machines are made operational. The drilling machines, however, operate for just eight hours a day. What is the new process capacity (number of components produced per week)? determine the cost per unit output for part b. (Round your answer to 2 decimal places.) Management decides to run a second shift of eight hours for assembly line 1 plus a second shift of only four hours for the final assembly line. Five of the six drilling machines operate for eight hours a day. What is the new capacity? Determine the cost per unit output for part c. (Round your answer to 2 decimal places.) The product is sold at $3 per unit. Assume that the cost of a drilling machine (fixed cost) is $34,000 and the company produces 8,200 units per week. Assume that four drilling machines are used for production. If the company had an option to buy the same part at $2 per unit, what would be the break-even number of units? (Round your answer to the nearest whole number.)
A firm currently offers a single product within the product category. the product management team is considering the development of a new high-featured and high priced offering. Should they expect the new higher-priced product to cannibalize sales fr..
Manager's Ethical Dilemma You are the manager of a factory of the Make-It Company. You have 5,000 parts that must be shipped by Friday at 5:00 p.m. Things have been on schedule, making 1000 parts per day, but you have just been alerted on Thursday af..
What is the objective of critical path analysis? Explain why the critical path is the longest, not the shortest, path through a network.
Several samples of size 5 each were taken from a fertilizer-bag-filling machines. The results were: Overall mean x = 60lbs; Average range R=2 lbs. Determine the upper and lower control limits of the x chart. Please give the formulas for calculating U..
Case Study- The Binghams and The Lousiville Courier-Journal Companies in The Family Business Book by Ernesto J Poza and Mary S. Daugherty. Designate the decisions and/or actions you would take in the situation if they were the CEO or individual re..
Identify a business you think is interesting and briefly discuss how each of the above challenges might impact that business in the future - Number of key challenges have become very Changing Technologies significant to Operations Managers.
Nara is a fashion apparel and accessories chain store that procures a line of new shorts at $10 each from its European supplier. Unfortunately, at the time of order placement, demand is still unknown. Nara forecasts that its demand is normally distri..
Project planning is arguably one of the most important aspects of the project management office (PMO). The purpose of this assignment is for you to understand and synthesize the application of project planning as a key function for enabling PMO su..
You studied the printing costs at your firm. The annual fixed cost of printing is $750,000 and the per-page cost was 2 cents. You have a proposal from a company that would lease the printers to the you for only $400,000 and charge 9 cents per page. W..
Craft a 600-800 word paper comparing and contrasting “worst” vs. “best” communicators, deciding on key points, then using the all sources provided and tying to course concepts from the text. What do you admire most about effective communicators? What..
Choose one of the following topics to make your initial post of about 200-250 words. Remember to make your initial post by Friday night at midnight. Finally, remember to post two substantive replies to either the other topics or to your classmates by..
The effectiveness of the performance appraisal is often a topic of debate. Read the Forbes article, "Eliminating Performance Appraisals". Based on the content of the article, identify three key points related to the author's position on the elimin..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd