Reference no: EM131113355
You have been put in charge of the Quality Control systems for the resistor produc- tion line that your company has developed.
Run PF4NumberGen.m in MATLAB with your student number to generate your data for this portfolio. The code will output the data, and print out some key values and permissible assumed values. Do not use Octave.
The key process in the production line requires a resistor to be within a specific range of resistance. If the resistance lies outside this range, it is faulty and must be discarded.
1. You start the process to generate 50 units of the resistor. The resistances are measured, and the values recorded (see data from PF4NumberGen.m).
Write a single m file function that calculates and returns the sample mean (x¯) and sample variance (s2) of your data, using a for loop. Do not use built-in functions (you may use length or size, or hardcode the size of the array). Provide the code and the resulting mean and variance.
2. The process is supposed to have a mean value of µ (as per printout from PF4NumberGen.m). There are concerns that the system may be incorrectly calibrated. Determine the 95% confidence interval for the mean value, and perform a hypothesis test to determine if there is sufficient evidence to sup- port the concerns.
3. In order to be within tolerance, the resistance must be between µ - α and
µ + α (see printout from PF4NumberGen.m). If it is outside of this range, the resistor is defective. Assuming that the system produces resistances de- scribed by a Normal distribution with mean x¯ and variance s2, determine the probability that the resistor will be defective. You may use MATLAB or the Z-table.
4. Each packet contains 10 of these resistors, and the packet is acceptable as long as at least 8 of them are within tolerance. Determine the probability that the packet will be unacceptable.
5. The production line has been running for a while, and it has been observed that a glitch occurs approximately once every n days on average (see printout from PF4NumberGen.m), after which the system needs to be restarted. What is the probability that the system will need to be restarted more than 3 times in the next 31 days?
6. The boss has decided that the frequency of the glitches is unacceptable, and has ordered the critical component of the production line to be replaced with a newer, more expensive model. This newer model is supposed to improve stability so that the glitch only occurs approximately once every m days on average (find the value of m from PF4NumberGen.m). Upon installing, the glitch occurs within 24 hours. It is suspected that the manufacturer of the component has shipped the older model (that typically glitches every n days) by mistake. Calculate the probability that each model of the component will cause a glitch within the next 24 hours.
7. The manufacturer asserts that, at most, they mistakenly send the wrong model just 1% of the time. Assuming the manufacturer is telling the truth, use Bayes' Rule to determine the probability that it is the older model given that it failed within 24 hours.
How many times have you received a bill from an inpatient
: How many times have you received a bill from an inpatient or outpatient stay that was either upcoded or inaccurately coded. If downcoded, most people don't bother bringing that to anyone's attention and hopefully Case Management and Audit picks i..
|
What cross rate would the bank quote
: A bank is quoting the following exchange rates against the dollar for the Swiss franc and the Australian dollar: SFr/$ = 1.5960-70 A$/$ = 1.7225-35 An Australian firm asks the bank for an A$/SFr quote. What cross-rate would the bank quote?
|
Compute the flux linkage as a function of time
: The time-average value of the induced voltage. (e) The induced voltage when the plane of the coil is 30° from the vertical.
|
Provide conditional processing
: What are the two XSLT elements that provide conditional processing? Describe how the functionality provided by these two elements differs.
|
Student number to generate data for portfolio
: You have been put in charge of the Quality Control systems for the resistor produc- tion line that your company has developed.Run PF4NumberGen.m in MATLAB with your student number to generate your data for this portfolio. The code will output the dat..
|
Prepare the general journal entry or entries to correct
: Prepare a bank reconciliation going from balance per bank and balance per book to correct cash balance.
|
What do you do when a hospital worker that has access
: It doesn't eliminate it, just points to those who have access. Now what do you do when a hospital worker that has access but shouldn't necessarily look at the case? Example a CT Tech has a Chest/Abdomen/Pelvis as a patient and the Manager looks ..
|
Determining the important terminology
: Give a short overview of the topic(s) covered; include as many details as necessary to make the topic(s) clear. Explain any important terminology covered (including any terms that are new to you).
|
Compute the maximum value of the voltage
: The coil is placed so that its axis of revolution is perpendicular to a uniform field, as shown in Figure P12.1.10. If the flux per pole is 0.02 Wb, and the coil, consisting of 2 turns, is revolving at 1800 r/min, compute the maximum value of the ..
|