Specializes in selling books and music

Assignment Help Operation Management
Reference no: EM13534403

Problem 1:  Create a flow chart for the following telephone-ordering process at a retail chain that specializes in selling books and music CDs. It provides an ordering system via the telephone to its time sensitive customers besides its regular store sales.

First, the automated system greets customers and identifies if they have a tone or pulse phone. Customers choose 1 if they have a tone phone; otherwise, they wait for the first available service representative to process their request. If customers have a tone phone, they complete their request by choosing options on the phone. First, the system checks if customers have an existing account or not. Customers choose 1 if they have an existing account or choose 2 if they want to open a new account. Customers wait for the service representative to open a new account if they choose 2.

Next, customers choose between the options of making an order, canceling an order, or talking to a customer representative for questions and/or complaints. If customers choose to make an order, then they specify the order type as a book or a music CD, and a specialized customer representative for books or music CDs picks up the phone to get the order details. If customers choose to cancel an order, then they wait for the automated response. By entering the order code via phone, customers may cancel the order. The automated system says the name of the ordered item and asks for the confirmation of the customer. If the customer validates the cancellation of the order, then the system cancels the order; otherwise, the system asks the customer to input the order code again. After responding to the request, the system asks whether the customer has additional requests; if not, the process terminates.

Problem 2:  Draw a fishbone diagram for the possible causes of poor reports submitted by staff to executives.

Problem 3:The Florida Company was flooded by a Hurricane and somehow lost part of their forecasting data. Positions in the table that are marked [a],[b],[c],[d],[e],and [f] must be recalculated from the remaining data. Exponential smoothing constant of 0.3 is used for both the forecast and updated MAD.

Period Actual Forecast Error MADt TSt
0 10.0
1 120 100 20 [a] 1.54
2 140 106 34 19.3 [b]
3 160 [c] [d] [e] [f]


Show your work in detail how you obtain each missing information, [a] through [f].

Problem 4:  Whole Grains Inc. uses statistical process control to ensure that its health-conscious, low-fat, multigrain sandwich loaves have the proper weight. In order to calculate 3σ control limits for both means and ranges, based on periodic process sampling, the following weights information (in ounces) were recorded.

Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8
Loaf # 1 6.5 6.1 5.7 6.7 5.6 5.4 6.0 5.9
Loaf # 2 6.2 6.7 6.4 5.9 6.0 5.8 6.2 6.4
Loaf # 3 6.6 6.3 6.2 6.1 6.4 6.6 6.4 6.3
Loaf # 4 5.8 6.0 6.1 6.3 5.9 6.1 6.0 5.9

a) Obtain the upper limit, center line, and lower limit for both charts.

b) Over the past few days, they have taken six random samples of four loaves each and have found the following:

Sample Loaf # 1 Loaf # 2 Loaf # 3 Loaf # 4
1 6.3 6 5.9 5.9
2 6 6 6.3 5.9
3 6.3 5.3 5.6 5.2
4 6.2 6 6.2 5.9
5 6.5 6.6 6.5 6.9
6 5.7 5.4 6 6.3

Is the process in control? Explain why or why not? Do the plotting below and write your recommendations.

Problem 5: Americans Family insurance company wants to design a control chart to monitor whether claim forms are being completed correctly. The company intends to use a control chart to see if the improvements in the design of the form are effective. To start the process the company collected data on the number of incorrectly completed forms over the past 10 days. The insurance company processes thousands of these forms each day, and due to the high cost of inspecting each form, only a small representative sample of 300 was collected each day. The data for the last 10 days are as follows: 10, 8, 9, 13, 7, 7, 6, 11, 12, and 8.

a) What type of control chart(s) should be used?
b) What is the value of central line?
c) Compute the upper and lower control limits for the chart.
d) Based on the data collected, what would you conclude?
e) Do the improvements in the design of the forms effective? What can we say?


Problem 6:Manager of a travel agency has been using a forecast to predict demand for packaged tours. The actual and predicted values are:

Period Demand Predicted
1 129 124
2 194 200
3 156 150
4 91 94
5 85 80
6 132 140
7 126 128
8 126 124
9 95 100
10 149 150

The manager asks you to assess the performance of the technique used in forecasting by plotting the tracking signals starting from period 5 through 10. Company uses exponential smoothing with ? = 0.3 in updating the mean absolute deviation. Hint: use the regular MAD for the fifth period as the initial MAD. If the action limits are set for 3σ, what would you conclude?

Problem 7: (10 points) An appliance manufacturer wants to contract with a repair shop to handle authorized repairs in Indianapolis. The company has set an acceptable range of repair time of 50 minutes to 90 minutes. Two firms have submitted bids for the work. In test trials, one firm had a mean repair time of 74 minutes with a standard deviation of 4.0 minutes and the other firm had a mean repair time of 72 minutes with a standard deviation of 5.1 minutes. Which firm would you choose? Why?

Reference no: EM13534403

Questions Cloud

What constitutes quality speed dependability and flexibility : What constitutes quality, speed, dependability, and flexibility in the following operations: a university library, a university sports center, and a university restaurant?
Prepare the manufacturing overhead budget for the year : Prepare the manufacturing overhead budget for the year, showing quarterly data - Atlanta Company is preparing its manufacturing overhead budget for 2012.
Sequence of biochemical events : For each of the metabolic pathways prepare a chart illustrating the sequence of biochemical events that constitute the pathway.Describe the required energy and/or source materials and theproducts in each step of the pathway
Prepare a direct materials budget for january 2012 : Prepare a production budget for January and February 2012 and prepare a direct materials budget for January 2012.
Specializes in selling books and music : Create a flow chart for the following telephone-ordering process at a retail chain that specializes in selling books and music CDs. It provides an ordering system via the telephone to its time sensitive customers besides its regular store sales..
Prediction of the osmotic potential of this cell : Consider a plant 20 cm tall growing in well watered soil. Ina dark and humid greenhouse, in the middle of the night, you measure the turgor pressure of aliving leaf cell of this plant using  a probe inserted in the cell. You find that the turgor p..
Prepare a cash budget for each of first two quarters of 2012 : Prepare a cash budget for each of the first two quarters of 2012 - Lager Dental Clinic is a medium-sized dental service specializing in family dental care. The clinic is currently preparing the master budget for the first 2 quarters of 2012.
During crossing over in meiosis : During crossing over in meiosis, an incomplete exchange of geneticmaterial occurs. This would most likely produce
Significant difference during winter and autumn : Why do air temperatures only differ significantly between clearcutand old growth forest stations during spring and summer? Why isthere no significant difference during winter and autumn?

Reviews

Write a Review

Operation Management Questions & Answers

  Explain why is the planning phase often referred to as

1 why is the planning phase often referred to as phase 0 zero of the generic product development process?2 what is a

  Which of the given is factor underpinning the flow shops

which of the following is factor underpinning the flow shops advantage over the job shop? a. ease of changeover to

  Evaluate expected completion time for each path

Subsequent precedence diagram reflects three time estimates for each activity. Evaluate: Expected completion time for each path also its variance.

  Write down the main elements of the air transportation

what are the main elements of the air transportation infrastructure? how would the quality and dependability of the air

  While the nation as a whole may gain from free trade

While the nation as a whole may gain from free trade, and isolationist policies have proven to be non-profitable, certain regions, industries, firms

  Determine the four major types of contracting officers

Determine the four major types of contracting officers and analyze how they differ in scope and responsibility from one another.

  Expand the sport globally

Expand the sport globally, Constant comminent to providing top of the line products and services.

  Operation management an item is demanded at the rate of

an item is demanded at the rate of 2000 units per year at a uniform rate. order cost is rs.350 per order. inventory

  Wildlife and recreation program

Case Study International Paper’s Wildlife and Recreation Program

  What possible sources of role conflict might affect group

How would you characterize the role of each member of the Sternberg-Silverman-Friedman group? What possible sources of role conflict might affect group performance in the future?

  What is the linear programming model for this problem

What is the linear programming model for this problem? What are the boundary points of the feasible region?

  How many laburers are employed at the plant

If the labourer productivity at the plant is 0.15 hot water heaters per labour hour, how many laburers are employed at the plant?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd