Show that both portfolios have the same duration

Assignment Help Civil Engineering
Reference no: EM131404147

Portfolio A consists of a one-year zero-coupon bond with a face value of $2,000 and a 10-year zero-coupon bond with a face value of $6,000. Portfolio B consists of a 5.95-year discount bond with a face value of $5,000. The current yield on all bonds is 10% per annum.

a. Show that both portfolios have the same duration.

b. Show that the percentage changes in the values of the two portfolios for a 0.1% per annum increase in yields are the same.

c. What are the percentage changes in the values of the two portfolios for a 5% per annum increase in yields?

Reference no: EM131404147

Design a swap that will net a bank

Design a swap that will net a bank, acting as intermediary, 50 basis points per annum. Make the swap equally attractive to the two companies and ensure that all foreign exch

What is the value of the swap to the financial institution

Payments are exchanged every year, with one exchange having just taken place. The swap will last two more years. What is the value of the swap to the financial institution?

Design a swap that will net a bank, acting as intermediary

Design a swap that will net a bank, acting as intermediary, 10 basis points per annum and that will produce a gain of 15 basis points per annum for each of the two companies

How can swaps be used to offset the risk

A bank finds that its assets are not matched with its liabilities. It is taking floating-rate deposits and making fixed-rate loans. How can swaps be used to offset the risk?

What is the cost to the financial institution

What is the cost to the financial institution? Assume that, at the end of year 6, the interest rate is 3% per annum in Swiss francs and 8% per annum in U.S. dollars for all

What opportunities are there for an arbitrageur

The stock price is $64, the strike price is $60, and a dividend of $0.80 is expected in one month. The risk-free interest rate is 12% per annum for all maturities. What oppo

What is the initial margin requirement

A United States investor writes five naked call option contracts. The option price. is $3.50, the strike price is $60.00, and the stock price is $57.00. What is the initial

What is the pattern of profits from the strangle

A call option with a strike price of $50 costs $2. A put option with a strike price of $45 costs $3. Explain how a strangle can be created from these two options. What is th

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd