A three-span continuous beam ABCD with three equal spans supports a uniform load with intensity q. Determine all reactions of this beam and draw the shear force and bending moment diagrams labelling all critical ordinates.
The viscosity of the film of oil separating the piston from the cylinder is 0.020 lb.s/ft. Calculate the force required to maintain this motion.
If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .
Describe a dynamic programming algorithm to find an independent set of T such that the sum of numbers of nodes in the set is the largest among all possible independent sets of T.
A rod of steel is 20 m long at a temperature of 200C. find the free expansion of the rod when the temperature is raised to 65 0 C. Find the temperature stress produced
You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work.
Determine the number of completely mixed bioreactors (detention time of 45 min each) that would be required to meet the phenol discharge limit of 5 mg/L. The first-order removal rate constant is equal to 6.1 hr -1
A sewage treatment works (STW) with 4 single-stage trickling filters has become organically overloaded due to the discharge of a biodegradable industrial effluent to the STW. This is causing effluent to pond on the surface of the filters.
The base engine develops 200 ft-lb of torque, and a modified version of the engine develops 240 ft-lb of torque. If the overall gear reduction ratio is 8 to 1, what is the maximum acceleration from rest (in ft/sec^2) for:
A sample of natural glacial till was taken from below the groundwater table. The water content was found to be 52%. Estimate the wet density, dry density, buoyant density, porosity and void ratio. Clearly state any necessary assumptions.
At a specified point on a highway, vehicles are known to arrive according to a Poisson process. Vehicles are counted in 20-second intervals, and vehicle counts are taken in 120 of these time intervals.
A four-lane freeway (two lanes in each direction) is on mountainous terrain with 11ft lanes, a 5ft right-side shoulder, interchange spacing of one every 10 miles, and a 60mph base free-flow speed.
To remove a nail, a small block of wood is placed under a crowbar, and a horizontal force P is applied as shown. Knowing that the maximum vertical force needed to extract the nail is 2600 N and that the horizontal force P is not to exceed 290 N, d..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd