Q6  Queuing

Multiple Choice -- please select the right answer

Part 1 If the average time to serve a customer is 3 minutes, then the service rate, µ, would be

a. 3 per hour

b. 12 per hour

c. 16 per hour

d. 20 per hour

Part 2 If, on average, it takes 90 seconds to serve a customer then the hourly service rate, µ, would be

a. 90 per hour

b. 40 per hour

c. 30 per hour

d. 1.5 per hour

Part 3 An espresso stand has a single server. Customers arrive to the stand at the rate of 28 per hour according to a Poisson distribution.  Service times are exponentially distributed with a service rate of 35 customers per hour.

Part 3a The probability that the server is busy is

a. 0.20

b. 0.60

c. 0.80

d. 1.00

Part 3b The average number of customers waiting in line for service is

a. 4.0

b. 3.8

c. 3.5

d. 3.2

Part 3c The average time a customer spends waiting in line for service is

a. 0.114 minute

b. 0.143 minute

c. 6.857 minutes

d. 8.58 minutes

Part 3d If the arrival rate remains at 28 customers per hour and the stand’s manager wants to have the average time a customer spends in the system (i.e., wait time line and service time) to be a maximum of 6 minutes on average, then the service rate must

a. decrease by 2 to 33 customers per hour

b. decrease by 3 to 32 customers per hour

c. increase by 3 to 38 customers per hour

d. increase by 2 to 37 customers per hour

Reference no: EM1358844

Questions Cloud

Why are control charts important : Why are Control Charts important? What are the key steps from implementing Statistical Process Control and what are the benefits?
What is average seek time : Tracks traversed Disk receives a request to access a random sector on a random track. Assume the head starts at track 0. What is the average seek time?
Patient with advanced parkinson disease : Suppose an ordinary patient with advanced Parkinson's disease, who has a brain damage tom dopamine-releasing axons, move very slowly if at all.
How much higher would the ball have gone in a vacuum : How much higher would the ball have gone in a vacuum. The time constant of an RC circuit is 4.8 s. How much time t is needed for the capacitor (uncharged initially) to gain one-half of its full equilibrium charge.
Queuing questions : If the arrival rate remains at 28 customers per hour and the stand’s manager wants to have the average time a customer spends in the system (i.e., wait time line and service time) to be a maximum of 6 minutes on average, then the service rate must
Discuss global business management : How might the establishment of the FTAA impact the strategy of North American businesses?
Illustrate what mistakes did policymakers make : Illustrate what mistakes did policymakers make that have kept developing nations from growing more quickly.
Estimate the weighted cost of capital : Electronics Unlimited has the following capital structure: 60 percent stock, 10 % preferred stock, and 30% in debt. The after-tax cost of debt is 8 percent, the cost of preferred stock is 10 percent, and the cost of common stock is 12 percent.
Key stages of project monitoring : address the 4 key stages of project monitoring and how that will be useful for the ongoing project.

Reviews

Write a Review

 

Operation Research Questions & Answers

  Statistcal process control

If no values are outside of the control limits, what are the implications for the business and what would you recommend they do?

  Write a report on im operations governance

Write a report on IM operations governance

  Red brand canners

Red Brand Canners Gordon asked Myers about the demand for tomato products for the coming year. Myers replied that they could sell all of the whole canned tomatoes they could produce.

  Give both a high-level algorithm and an implementation

Give both a high-level algorithm and an implementation (\bubble diagram") of a Turing machine for the language

  Compute the company''s predetermined overhead rate

Corporation bases its predetermined overhead rate on the estimated labor hours for the upcoming year

  Control charts

Control Charts, Are the connection times normally distributed?  How many values are outliers?  Is the connection time in control or out of control?  Explain

  Optimal translocation strategies

Optimal Translocation Strategies - use stochastic dynamic programming (SDP) to ?nd the optimal decisions

  Prepare a planning memo for the tlc engagement

Prepare a planning memo for the TLC engagement based on the information provided in the case.

  Lp using revised simplex method

Solve the following LP using Revised Simplex Method, Solve the following transportation problem (Using VAM, Compute initial basic solution)

  Bioimetic vascular network design

What kind of material is needed for bioimetic vascular network design?

  Project specification and plan

The Project Specification is a description of what you are working to achieve, and a Plan is the schedule proposed to achieve it

  Decisions under certainty

the number of components the company should order, the frequency of ordering, the total annual cost of the inventory, expected value, return on investment, decisions under certainty, decisions under uncertainty, Decision making

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd