Quantify the objectives of the various projects

Assignment Help Project Management
Reference no: EM13307812

Justify the commitment of Project D using the portfolio process you defined in (Project Outline). Make whatever assumptions are necessary (cash flows to fit NPV analysis, strategic alignment determination, etc.). Your team should prepare the following items for the report to be submitted to the Instructor:

  1. Quantify the objectives of the various projects, the objectives of the SBU and the objectives of the parent company and present the KPIs of the industry . Other suggestions are:
  • Assign weights to the specific parameters in the selection criteria in coming up with the final ranking and include a marketing component to measure perception
  • Offer a risk assessment measurement and risk mitigation plan. Specify the types of risk, weigh them with respect to impact and offer a plan to handle. It would seem to me that each project has unique implementation and commercial risks, which would make the risk matrix a necessity.
  • comments on any organizational and/or governance issues
  1. Recommendation Memo-Write a relatively short memo to your manager describing your recommendation for changing the project portfoliobased on your portfolio process. Justify your decision on Project D and describe any impact on the rest of the programme (Projects A, B, and C) and your rationale for that impact. Attach whatever data is needed to back up your recommendation. This memo should be 6-8 pages (not counting attachments). No more than 6 pages of attachments for this part.

 

  1. Executive Summary Project Plan-Assume you are in the definition phase of Project D and developing an executive-level project plan that will be an attachment to your recommendation memo. It should follow the attached outline. This document should be at least 8 pages but no more than 18 pages, including any attachments.

The documents should be double-spaced, in 10- or 12-point font, and with one-inch margins. These are documents for an executive, so be concise and to the point.

 

 

Reference no: EM13307812

Questions Cloud

Determine the total heat flow into the gas : An ideal gas expands at a constant pressure of 2.9 atm from 435 mL to 709 mL. Heat then flows out of the gas, determine the total heat flow into the gas
Explain evaluating a proposal for acquisition and sourcing : When evaluating a proposal for acquisition and sourcing, are there considerations that are unique in the case of an IT project versus a non-IT project
Find the linear acceleration of center of mass of cylinder : A solid cylinder has a mass of 3.2kg and a radius of 0.6m. find the linear acceleration of the center of mass of the cylinder?
Determine what percent removal efficiency may be expected : The current removal efficiency is 96% for an air flow rate through the separator equal to 18 m3/s. Due to a process change, the air flow rate is expected to increase to 22 m3/s.
Quantify the objectives of the various projects : Justify the commitment of Project D using the portfolio process you defined in (Project Outline). Make whatever assumptions are necessary (cash flows to fit NPV analysis, strategic alignment determination, etc.). Your team should prepare the followin..
What is the speed of the remaining spacecraft : A Spacecraft with a total mass of 50,000kg is flying with a speed of 90m/s with respect to a distant planet. What is the speed of the remaining spacecraft with respect to the planet after the explosion
Encouragement of small business : Encouragement of Small Business
What relative speed is required : A standard tournament domino is 1.5 in wide and 2.5 in long. What relative speed is required
Design the flexural reinforcement for the member : A rectangular concrete beam of width b = 24 inches is limited by architectual considerations to a maximum total depth of h = 16 inches. it must carry a total factored load moment of Mu = 400 ft-kips.

Reviews

Write a Review

Project Management Questions & Answers

  Ways to manage resources in integrated project management

Describe three ways to manage resources in integrated project management.

  Entertainment - due to electrical code changes

All the equipment that bands bring to the stage will need to be checked by fire marshals

  Project planning and management

Project Planning and Management - In spite of their poor cost performance, why do you think these projects were supported to their conclusion?

  Checklist versus weighted factor method of selecting project

Show the pros and cons of the checklist versus the weighted factor method of selecting projects - Important information about checklist versus the weighted factor method

  Probability of project completed by desired completion date

Which of the following alternatives gives the probability that the project will be completed by the desired completion date?

  Determine the best transportation schedule

The saussy Lumber Co. ships pine flooring to three building supply houses from its mills in Pineville, Oak Ridge, and Mapletown. Determine the best transportation schedule for the data given in the table. Use the northwest corner rul and two itera..

  Objective of project meet constraints of quality and cost

The objective is that the project may meet the constraints of quality, cost and schedule in time.

  Globalcom products spam filter

The Globalcom product's spam filter requires a different network configuration than is currently in place for the network

  Purchasing and supply chain management

Purchasing and Supply Chain Management - Show the advantages and disadvantages of sourcing from suppliers located overseas.

  What is the minimum number of service bays fast lube needs

what is the minimum number of service bays fast lube needs to achieve an anticipated production of 300 cars per 8 hour day?

  Designing a quality power trim system

Design a quality power trim system. Design and build the equipment to produce such a system efficiently.

  Stakeholders and accounting ethics

Mike Singletary, president of Singletary industries, wishes to issue a press release to bolster his company's image and maybe even its stock price which has been gradually falling. Who are the stakeholders in this situation?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd