Calpal is a small manufacturer of a special engineering workstation. The company operates one plant with a monthly capacity of 3,000 units. In addition, 750 units can be produced on an overtime basis, which is 30% more expensive, on the average. The labor cost when producing a regular time is $1,000; it is $1,300 on overtime (per workstation produced). The company may use inventories to reduce fluctuations in production, but carrying inventories costs money. The cost of carrying one finished unit in inventory is $80 per unit per month. a.All demand must be met according to the following schedule: Month 1 2 3 4 5 6 Units 2,500 3,200 3,800 3,500 5,000 3,000 b. There should be no inventory left at the end of the sixth month. c. There is no inventory at the present time. The problem is to find the production schedule for the next six months that minimizes total cost.

plant capacity 2500

over time extra cost 0.26

regular cost 1130

need lingo program input

Reference no: EM13962460

Describe a fictional large-scale change

Describe a fictional large-scale change that could affect DuPont. You will address this change from both a problem-solving approach and an appreciative inquiry approach.

What is impact of losses in process in inspection-final test

CBF hired you to help determine why it is not able to produce the 1,000 boards per day. What type of process flow structure is CBF using? Diagram the process in a manner simil

Why are some products difficult to categorize

Explain the difference between consumer products and business products. Why are some products difficult to categorize as one or the other? Give an example of a business prod

Define information literacy

Define information literacy and explain why the specific skills required for a person to be information literate are important for success as a student and in professional lif

Give an example of some incongruity

Give an example of some incongruity that you have experienced that challenged you to recognize one of your assumptions. Describe the discomfort you felt when you could not res

Promise of health check outsourcing-small cost

How do you respond to this in a discussion? "Promise of health check outsourcing: small cost, high excellence, and competence have been very basic in medicinal outsourcing the

Learning curve analysis-purchasing and sourcing course

Craig Phillips is a buyer at Socon, a manufacturer of large industrial pumps. He has a requirement for a customized subassembly that his preferred supplier, Oriel, is building

Estimate the number of kanban cards required for component

Consider a Component X, one unit of which is used in every 5th Venza (e.g., X could be a Panoramic glass roof). The average lead-time (= wait time in queue + production time)

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd