+1-415-670-9189
info@expertsmind.com
Production and six sigma quality tools
Course:- Project Management
Reference No.:- EM131195087




Assignment Help
Expertsmind Rated 4.9 / 5 based on 47215 reviews.
Review Site
Assignment Help >> Project Management

Production and Quality Tools

Review the various Lean production and Six Sigma quality tools outlined in Chapter 8. Select a tool or process that could be implemented in your current or past organization and describe how this tool could be used in improving supply chain management.

REFERENCE

Wisner, J.D., Tan, K.-C., & Leong, G. (2012). Principles of Supply Chain Management (3rd ed.). Mason, OH: South-Western Cengage Learning. CH 5, CH 6, CH 7, CH 8

Answered:-

Verified Expert

This assignment talks about FMEA. potential failure modes and effects analysis; failure modes, effects and critical analysis (FMECA). Failure modes and effects analysis (FMEA) is a step-by-step approach for identifying all possible failures in a design, a manufacturing or assembly process. This assignment is prepared in MS word and it is about 100 words.



Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Project Management) Materials
Are there any projects in the case study that would benefit from any of the PMLC models studied in this chapter? (Remember the six subsystems defined for the case are Order
Identify the problems and/or issues that you''ll need to include in your analysis. Document this information, and con - Recognize and manage for constraints and limited availa
How did Chris Zane learn his current managerial style? Describe the management style at Zane's Cycles using the concepts of responsibility, authority, and delegation.
Describe one instance of a project termination that you have experienced. Analyse the steps that were undertaken to close out the project. Include your evaluation of the eff
Do you believe that if two Project management tools, are used in a combined manner can complement each other and become a more powerful tool for a project manager to plan his
The carrying cost is $15 per kilo per year, and the cost of a stockout is $70 per kilo per year. Given the following demand probabilities during the lead time, how much safe
Answer these two questions: 1. How does the project closure review differ from a performance measurement control system? 2. What major information would you expect to find in
C, a student at University Z, discovers a method of bypassing the telephone system that allows him to make free telephone calls. C tells his roommate, D, about this method.-