Case Study - Doncaster Quarry Rehabilitation Works

Brief

Your Company has won the Tender to rehabilitate the Doncaster Quarry Site. Prepare a preliminary Report for the project. The council will rely on your expertise to return the site into a safe community park. Your task is to control the site, run earth works operations (fill 35 x 85 x 65 meter deep hole).

Important Council Briefing Session 1st October (Outline of requirements)

Part (A) Report

Your Report should discuss the key activities required. Ensure to includes an outline of (but not limited to):

o Setup of site, including amenities, services, boundary fences, surveying, signage

o Stabilization of rock faces

o Allocation and manning of earth works operation

o Write up of a Co-ordination Plan

o Example of a SWMS

o Contingencies Plans

o Others....

Ensure to include a Project Schedule using Microsoft Project, whereby activities and resources are identified.

Part (B). Presentation: In your Groups, provide a 10min presentation outlining your project schedule. This is due on the due date of the project.

Verified Expert

Reference no: EM13846836

Compute the normal depth with a bottom width

A trapezoidal channel with a bottom width of 4 feet and side slopes 2:1 (H:V) and a bed slope of 1 percent conveys a discharge of 50,000 gpm. Assume n = 0.025. Compute the n

What would the height be after it was consolidated into this

There is a perfectly uniform soil that is an assemblage of spheres of equal diameter. A 1m thick layer of this soil is packed so that it is as loose as possible (void ratio, e

What is the present worth in year 0 of the profit

An entrepreneurial new civil engineering graduate started a lab for testing endocrine disrupting compounds. The lab just broke even the first year, but in years 2 through 5, i

Compute magnitude of the velocity and acceleration vectors

A Ferris wheel with a radius of 35 feet starts from rest and undergoes an angular acceleration of 0.05 rad/s^2. Compute the magnitude of the velocity and acceleration vector

Find the specific heat capacity of iron at steady state

an iron cube at 400 degrees Celsius is dropped into a insulated bath containing 10kg of water  25 degrees Celsius. the water finally reaches a temperature of 50 degrees Cels

Determine what is the concentration of pce in the lake

An industry discharges PCE (tetrachloroethene, tetratchloroethylene, or perchloroethylene) into a small, well-mixed lake. The influent concentration is 0.4mg/L and the hydra

Determine the m,agnitude of the force f exerted by rrod ac

The design of  arobotic system calls for ther two-rod mechanis shown. Rods AC and BD are connected by a lider block D as shown. Negelcting th eggect of friction, write a omput

Simplify the shape of the base and the 4 legs and estimate

The Statfjord B drilling platform, was built in Norway and towed 370km in 5 days to its present site in the North Sea in August 1981. It is the heaviest object ever moved by m

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd