Case Study - Doncaster Quarry Rehabilitation Works

Brief

Your Company has won the Tender to rehabilitate the Doncaster Quarry Site. Prepare a preliminary Report for the project. The council will rely on your expertise to return the site into a safe community park. Your task is to control the site, run earth works operations (fill 35 x 85 x 65 meter deep hole).

Important Council Briefing Session 1st October (Outline of requirements)

Part (A) Report

Your Report should discuss the key activities required. Ensure to includes an outline of (but not limited to):

o Setup of site, including amenities, services, boundary fences, surveying, signage

o Stabilization of rock faces

o Allocation and manning of earth works operation

o Write up of a Co-ordination Plan

o Example of a SWMS

o Contingencies Plans

o Others....

Ensure to include a Project Schedule using Microsoft Project, whereby activities and resources are identified.

Part (B). Presentation: In your Groups, provide a 10min presentation outlining your project schedule. This is due on the due date of the project.

Verified Expert

Reference no: EM13846836

How many of the 15 access points must be blocked to achieve

A four- lane undivided multilane highway ( two lanes in each direction) has 11- ft lanes and 5- ft shoulders. At one point along the highway there is a 4% upgrade that is 0.62

What is the difference in water levels between reservoirs

A wrought iron water line connecting two reservoirs at 20°C has a length of 1500 m, a diameter of 75 cm, two elbows (90º, long-radius, flanged), a fully open gate valve, and

Determine the forces in members de and ea of the truss

Determine the forces in members DC,CB and BA of the truss. State whether the members are in tension or compression. set P=7 kN. Determine the forces in members DE and EA of th

Determine p q and r

The transmission tower OA is being hoisted into position by the cables AB and AC. The resultant of the cable tensions P and Q, along with the 2400-lb weight of the tower, is

Downstream response to imposed flow transformation

Write a paragraph ( 1 paragraph for i, ii, iii, & iv together) summarizing the following Holistic Methodologies Methods used to analyze environmental flow requirements.)

Find the final volume and pressure and the work

Now the valves are slowly opened and heat is transferred so that the water reaches a uniform state at 250?C with the valves open. Find the final volume and pressure, and the

How many particles would be present in a cubic meter

How many particles would be present in a cubic meter of aerosol at the concentration of the U.S. PM-10 standard or 50 micrograms/cubic meter if the particles are .1 micromet

At what speed in stillwater will cavitation first occur

A sphere L ft in diameter is moving horizontally at a depth of 12 ft below a water surface where the water temperature is 50°F. v max = 1.5 V0. where V0. is the free stream ve

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd