Prepare a preliminary report for the project

Assignment Help Civil Engineering
Reference no: EM13846836 , Length:

Case Study - Doncaster Quarry Rehabilitation Works

Brief

Your Company has won the Tender to rehabilitate the Doncaster Quarry Site. Prepare a preliminary Report for the project. The council will rely on your expertise to return the site into a safe community park. Your task is to control the site, run earth works operations (fill 35 x 85 x 65 meter deep hole).

Important Council Briefing Session 1st October (Outline of requirements)

Part (A) Report

Your Report should discuss the key activities required. Ensure to includes an outline of (but not limited to):

o Setup of site, including amenities, services, boundary fences, surveying, signage

o Stabilization of rock faces

o Allocation and manning of earth works operation

o Write up of a Co-ordination Plan

o Example of a SWMS

o Contingencies Plans

o Others....

Ensure to include a Project Schedule using Microsoft Project, whereby activities and resources are identified.

Part (B). Presentation: In your Groups, provide a 10min presentation outlining your project schedule. This is due on the due date of the project.

Verified Expert

Reference no: EM13846836

Calculate the amount of work done for the process

A container with a plunger compresses one pound mole of an ideal gas from 1 atmospheres pressure to 10 atmospheres. Calculate the amount of work done if the process is consi

Calculate and plot the distribution of total and stresses

A borehole at a site reveals a soil profile comprising 6 m deep fine sand layer overlying a 9 m thick clay layer, which in turn overlies weathered bedrock. The groundwater t

Determine the power required as a function of time

A train of total mass equal to 500 Megagrams starts from rest and accelerates uniformly to a speed of 90 km/h in 50 s. After reaching this speed, the train travels with a co

What is the ratio of the area at this location to entrance

Assuming isentropic flow, determine the pressure and temperature of air at a location where the air velocity equals the speed of sound. What is the ratio of the area at this

Calculate the extreme-fibre stresses at mid-span

Calculate the extreme-fibre stresses at mid-span for a simply supported prestressed concrete beam with a depth of 750mm, width 370mm and span of 7m under working live load of

Determine what is the elevation of the curve at station

An equal-tangent crest curve connects a +2% initial grade with a -1% final grade, and is designed for 55mi/h. The station of the PVI is 233 + 40 with elevation 1203 ft. What

Determine what is the concentration of nox

At 100 km downwind (y=10m), what is the concentration of NOx in g/m^3. The wind speed at the top of the stack with a height of 100m is 6.5 m/s and an inversion layer of 750m

At what speed in stillwater will cavitation first occur

A sphere L ft in diameter is moving horizontally at a depth of 12 ft below a water surface where the water temperature is 50°F. v max = 1.5 V0. where V0. is the free stream ve

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd