Reference no: EM13890850
The following information pertains to Paramus Metal Works for the year just ended.
Budgeted direct-labor cost: 77,000 hours (practical capacity) at $17 per hour Actual direct-labor cost: 79,000 hours at $18 per hour
Budgeted manufacturing overhead: $993,300
Budgeted selling and administrative expenses: $417,000 Actual manufacturing overhead:
Depreciation $225,000
Property taxes 19,000
Indirect labor 79,000
Supervisory salaries 210,000
Utilities 58,000
Insurance 32,000
Rental of space 295,000
Indirect material 79,000
Indirect material:
Beginning inventory, January 1 46,000
Purchases during the year 95,000
Ending inventory, December 31 62,000
Required:
1. Compute the firm's predetermined overhead rate, which is based on direct-labor hours.
2. Calculate the overapplied or underapplied overhead for the year.
3. Prepare a journal entry to close out the Manufacturing Overhead account into Cost of Goods Sold.
4. Build a spreadsheet: Construct an Excel spreadsheet to solve requirements (1) and (2) above. Show how the solution will change if the following data change: budgeted manufacturing overhead was $990,000, property taxes were $25,000, and purchases of indirect material amounted to $97,000.
Calculate the amounts and compositions of phases
: Calculate the amounts and compositions of phases and constituents of steel composed of iron and 0.10% carbon just above and below the eutectoid isotherm
|
Drainage facility
: Drainage facility: - Drainage facility is the normal or fake evacuation of surface and sub-surface water from a territory. Numerous rural soils need waste to enhance creation or to oversee water supplies
|
Determine the volume fraction of fibers that will required
: Using the data provided, determine the volume fraction of fibers that will be required. What will be the tensile strength of this composite? Assume that the matrix stress at fiber failure is 50 MPa (7250 psi)
|
Estimate the amount of work that was required
: The cars were loaded 6 at a time, and once all 36 cars were full, the wheel made a complete rotation at constant angular speed in about 2 min. Estimate the amount of work that was required of the machinery to rotate the passengers alone
|
Prepare a journal entry to close out manufacturing overhead
: Calculate the overapplied or underapplied overhead for the year. Prepare a journal entry to close out the Manufacturing Overhead account into Cost of Goods Sold.
|
Calculate the azimuths of the remaining sides
: Balance the following interior angles (angles to the right) of a five-sided closed polygon traverse using method 1 of section 10.2. if the azimuth of side AB is fixed at 122-32-16, calculate the azimuths of the remaining sides
|
Determine the average penetration of the pile
: The design capacity of a steel pile is 250 kN. The pile is driven by a steam hammer with a manufacturer's hammer energy rating of 36 kN • m. Determine the average penetration of the pile
|
Compute the firms predetermined overhead rate for the year
: Compute the firm's predetermined overhead rate for the year using each of the following common cost drivers: (a) machine hours, (b) direct-labor hours, and (c) direct-labor dollars.
|
Calculate the bracing required for the building
: Using the plans for a dwelling and the relevant Australian Standard you are to calculate the bracing required for the building and complete the Bracing Layout Plan
|