As a part of a lean initiative, a manufacturer has reduced the setup cost for machining a component from $520 to $12.5. as a result, the new economic lot size is 10 units. IF the goal is to reduce the economic lot size to 1 uni, what must the setup cost be reduced to?

Reference no: EM13904223

Questions Cloud

Consider the marketing-product and positioning strategies : Consider the marketing, product, and positioning strategies when taking a U.S.-based consumer product global. Would you consider a local strategy (specific for that country) or a standard strategy (one global strategy)?
Federal and state governments have in educational standards : How large of a role should the Federal and State governments have in educational standards? Give good detail and be informative in your response, answer should be at least a few paragraphs long, make sure to be persausive to why you answered the way ..
Write preliminary plan for an exhibition : You did not thrive in your job at the survey company, and now you are back at your former work museum curator. A Japanese auto manufacturer recently opened a facility in your city, and the museum’s upper management decided to do a series of exhibitio..
Part of lean initiative-setup cost be reduced : As a part of a lean initiative, a manufacturer has reduced the setup cost for machining a component from $520 to $12.5. as a result, the new economic lot size is 10 units. IF the goal is to reduce the economic lot size to 1 uni, what must the setup c..
How manager can build better-more effective teams : Describe 2 ways (in your own words) how a manager can build better/more effective teams.
Reduced the setup cost for machining a component : As a part of a lean initiative, a manufacturer has reduced the setup cost for machining a component from $520 to $12.5. as a result, the new economic lot size is 10 units. The former economic lot size had been much larger.
Suitable incoterms for different types of supplies : Are there more suitable incoterms for different types of supplies? Based on Volume? Based on supplier or locations of Supplier?
What organizational and cultural changes ghosn implemented : What problems do you see with these changes Do you think that Porter's competitive strategy works for Renault? How? What organizational and cultural changes Ghosn implemented at Nissan?

Reviews

Write a Review

 

Operation Management Questions & Answers

  Which of the following is most correct

Bob has always performed well and has an excellent track record with the company. He and Arnold do not have any type of employment contract - they've just worked together for the last 30 years.

  Paddy''s pub was planning to have a street party to celebrate

Paddy's Pub was planning to have a street party to celebrate St. Patrick's Day. They contracted to buy 2,000 kegs of beer from Moe's at $50 dollars per keg

  Illustrate what is break-even ebit

In considering newly levered versus formerly unlevered firm, illustrate what is break-even EBIT. Ignore taxes.

  Manage project costs and scheduling

Select one (1) tool, other than MS Project, that you could use in order to manage project costs and scheduling. Next, speculate on the overall different project management strategy that you would apply based on the tool that you have selected.

  A pizza delivery company promises to deliver all customer

A pizza delivery company promises to deliver all customer orders within one hour of receiving an order at one of its stores. Actual data for all pizza delivered during the past week showed that the average delivery time was 40 minutes and standar..

  Evaluate the value of the cba

Evaluate the value of the CBA for each constituency and integrate these estimates into a scenario model and/or decision tree. Analyze the results.

  Distinguish between bottleneck time and throughput time

Distinguish between bottleneck time and throughput time. Give an example of a bottleneck that could occur in an organization. What are the techniques available to operations managers to deal with a bottleneck operation? Which of these does not decrea..

  In contract negotiations are all offer valid-legally binding

In contract negotiations are all offers valid and legally binding? If the offer is valid, when may it be accepted and by whom? At what time, if any, may a contract offer be lawfully withdrawn?

  Current systems and work flow processes

You will need to include information such as cost, compatibility with current systems and work flow processes, functionality, ease of use, and end user support.

  State-of-the- art technology-enabled shipment monitoring

Using the Internet, look up and briefly describe at least one example of state-of-the- art technology-enabled shipment monitoring (tracing and tracking) capabilities. Be sure to include links to your sources.

  The total amount of time to complete all activities

An assembly line with 20 activities is to be balanced. The total amount of time to complete all 20 activities is 56 minutes. The longest activity takes 3.2 minutes

  What is performance excellence

What is performance excellence? What are the principles of total quality? Describe the composition of each category in the Baldrige Criteria. Contrast total quality (TQ) and Six Sigma. Briefly describe the various elements of strategy development. Li..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd