The normal time to perform a repetitive manual assembly task is 4.25 min. In addition, an irregular work element whose normal time is 1.75 min must be performed every 8 cycles. Two work units are produced each cycle. The PFD allowance factor is 16%. Determine (a) the standard time per piece and (b) how many work units are produced in an 8-hour shift at standard performance. (c) Determine the anticipated amount of time worked and the amount of time lost per 8-hour shift that corresponds to the PFD allowance factor of 16%.
Please show all work
Non-Value Adding Activity For A Car Manufacturer
Some courts have held that certain shareholders are fiduciaries of each other. These are shareholders of:
Of the five management functions, which do you expect will experience the most dramatic changes in the next decade? Defend your answer. Which will have the least amount of change? Explain your answer.
A heavy manufacturing company wants to decide whether to initiate a new project which will last for 5 years. The success of the project depends heavily on the state of the economy, which has a 50/50 chance of being strong enough to support the ventur..
During peak demand, an airline check-in with two desks and a single waiting line receives one customer every 1.5 minutes on average, with standard deviation of 0.4 minutes. Service times are 2.5 minutes on average, with standard deviation of 0.9 minu..
Plot your distribution over a range of zero to ten minutes in increments of one minute. What is the upper limit of your distribution?
Social policy and laws regarding the rights of women, gay persons, and persons with disability vary greatly throughout countries in Asia, the Middle East, and the United States (to say nothing of variation within the fifty states). That is, what are ..
A designer estimates that she can (a) increase the average time between failures of a part by 5 percent at a cost of $550, or (b) reduce the average repair time by 10 percent at a cost of $100. Which option would be more cost-effective? Currently, th..
If the 10th unit contained labor costs of $2.5 million, what price should Western Turbine charge for labor on units 11 and 12 to make a profit of 10 percent of the selling price?
How does ceasars casinos emphasis on cost control, through implementations of LEAN processes and kaizen meetings, increase its differentiation?
Formulate this problem so as to determine how many medical beds and how many surgical beds should be added to maximize revenues.
When should an audit be conducted during a project? Is there a "best" time?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd