Intro- Supply Chain Management
Problem : Line Balancing
First shift employees at Harley-Davidson work from 6am to 2pm Monday through Friday. Everyone on the motorcycle assembly line is allowed a 30 minute lunch and two 20 minute breaks, but other cross-trained associates cover lunches and breaks for the associates on the assembly line so the line doesn’t stop. The processes of the assembly line have the following dependencies:
Task Predecessor Average Time (sec)
A none 60
B A 40
C A 80
D B, C 40
E D 100
F D 110
G E, F 30
The Plant Manager needs first shift to achieve an output of 200 motorcycles.
1- Compute the Takt time for the line.
2- What is the theoretical minimum number of workstations?
3- Draw the precedence diagram, and then create work stations. Follow the “largest eligible task” heuristic rule to assign these tasks to the work stations. Show which tasks are assigned to each workstation.
4- Compute the efficiency and percent idle time for the system.
5- What is the maximum output that could be achieved by a single assembly line in 8 hours?
State your argumentative thesis
: Create a simple presentation of your MGA for the rest of the class to view. This presentation is due FRIDAY. When your presentation is done, please provide a link to it in the "MGA Presentation" discussion board in the current module.
|
What are the functions of water in the body
: Write an essay of that explains the basic functions and sources of minerals and water in the body. Include what you learned about minerals, water, and dehydration from the article. Provide responses to the following:Mention two major and two minor ..
|
How would developing a work breakdown structure
: How would developing a work breakdown structure (WBS) allivate some of the problems that occurred during the first meeting and help Nicolette organiz and plan the project.
|
Donald duck in math magic land
: Describe the form of Listening Rest Part 1-B "Bye-Bye Love", by using alphabetical symbols. Each letter should indicate a unique section of the song, with letters repeating if a song section repeats. (Usually a verse or a chorus) (A, B, C etc.)
|
Line balancing-compute the takt time for the line
: First shift employees at Harley-Davidson work from 6am to 2pm Monday through Friday. Everyone on the motorcycle assembly line is allowed a 30 minute lunch and two 20 minute breaks, but other cross-trained associates cover lunches and breaks for the a..
|
Selective and differential medium
: Why is Mannitol Salt Agar (MSA) classified as a type of both selective and differential medium?
|
Demonstrate your understanding of characterization
: Conclude your analysis by giving a summary of your overall thoughts about each character and the most compelling way the two are connected.
|
Characteristics of the abo blood system
: Characteristics of the ABO blood system also illustrate some of the properties of the human immune system, our bodies defense against disease."?
|
Is the inherently discriminatory nature of underwriting
: How do agents and brokers differ? Is the inherently discriminatory nature of underwriting acceptable from a public policy standpoint? Would shifting to a primarily behavior-based approach to risk assessment be feasible? What actuarial adjustments are..
|