Lead time demand is distributed normally

Assignment Help Operation Management
Reference no: EM131121689

Given this information: Expected demand during lead time = 320 units Standard deviation of lead time demand = 20 units Use Table. Determine each of the following, assuming that lead time demand is distributed normally:

a. The ROP that will provide a risk of stockout of 1 percent during lead time. (Round your answer to the nearest whole number.) ROP units

b. The safety stock needed to attain a 1 percent risk of stockout during lead time. (Do not round intermediate calculations. Round your answer to the nearest whole number.)

Reference no: EM131121689

Questions Cloud

Prepare an appropriate journal entry to record transaction : Prepare an appropriate journal entry to record Transaction A. Kenya records treasury shares at cost. Prepare an appropriate journal entry for Transaction B. Prepare an appropriate journal entry for Transaction C.
Find the nyquist sampling periods for the following signals : Show transcribed image text (Problem 3.19) The Nyquist sampling periods for 1D band-limited signals f(x) andg(x) are Delta f and delta g, respectively. Find the Nyquist sampling periods for the following signals: a. f(x-x0) b. f(x) + g(x)
Calculate the allowable levelling misclosure : Calculate the allowable levelling misclosure and compare it with the actual misclosure. Briefly comment on the result. Carry out the error distribution and calculate the corrected levels of the sections indicated in the sketches
Lead time demand is distributed normally : Given this information: Expected demand during lead time = 320 units Standard deviation of lead time demand = 20 units Use Table. Determine each of the following, assuming that lead time demand is distributed normally:
Divisional structure configuration : Reflect on your reading for the week, specifically Analytical Exercise 8. Is another form of structural configuration better suited to multiproduct, multiservice companies? If not, is there a form of departmentalization for multiproduct, multiserv..
Economic order quantity to buy each time and its total cost : A particular raw material is available to a company at three different prices, depending on the size of the order. The cost to place an order is $60. Annual demand is 3,100 units. Holding (or carrying) cost is 20 percent of the material price. What i..
Find the twice differentiable function : Let f (x) be a twice differentiable function and f"(0) = 5, then limx→0 (3f (x) -4f (3x) + f (9x))/x2 is equal to
What amount of safety stock would provide stockout risk : The injection molding department of a company uses an average of 30 gallons of special lubricant a day. The supply of the lubricant is replenished when the amount on hand is 170 gallons. It takes four days for an order to be delivered. Safety stock i..

Reviews

Write a Review

 

Operation Management Questions & Answers

  Potential conflict situation in criminal justice setting

Describe a potential conflict situation in a criminal justice setting. Suggest possible ways this conflict could be managed. Also, describe what you believe the role of a criminal justice administrator should be in such a situation, and why. Is there..

  Intrinsic value of deployment specialists stock

If the required return for Deployment Specialists is 9.5%, what is the intrinsic value of Deployment Specialists stock? Please show work.

  The cultural diminision of global business

Explain which three you think are the most important and why. Give one or two suggestions for coping with culture shock that are not in Ferraro and explain why you think they should be included in the list.

  What is the shape of the trash compactor life cycle

What problems can account for this poor acceptance? What is the shape of the trash compactor life cycle?

  Describe incident response system

Why is it necessary for a business to have an Incident Response System in place. Does your place of employment have one. Explain in detail.

  Is project control different in an agile project

In the first discussion, we looked at traditional project control. Is project control different in an Agile project? What is the role of a project manager in controlling an Agile project? What is the role of the project client, sponsor, or customer a..

  What is the expected value of the LED current

An LED with a current limiting resistor is attached to an output pin of a microcontroller. To be visible, the LEC needs at least 7 mA of current going through it. The microcontroller can provide a maximum of 10 mA.  Running a Monte Carlo simulation, ..

  Explain why adding as much contingency reserve

Explain why adding as much contingency reserve as needed to fully cover every risk to its fullest would or would not be a good idea. Think of an example to determine how much contingency reserve is needed for a project and why.

  Explain how would you handle this situation

You are a new CEO of a large business. Your supply chain department managers are very good; explain however, they have a hard time cooperating with each or on mutual business goals. Each 1 tries to maximize their areas results. Explain how would y..

  What steps require to be taken before we implement an

post a 150- to 300-word response to the following discussion question by clicking on replywhat steps need to be taken

  What are the two external dimensions of the space matrix

What are the two external dimensions of the SPACE Matrix?

  How does storage contribute to the time value of goods

How does storage contribute to the time value of goods? Explain.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd