Layout of development and supervising extraction

Assignment Help Project Management
Reference no: EM13708403

Question 1 :

A company changes stoping methods and discovers that the new method gives a substantially higher dilution rate and yet the profit margin is higher. Show by simple calculation how this can come about.

Question 2 :

Three basic methods of underground coal mining exist, name the three methods. Briefly compare and contrast the three methods, use sketches where ever possible and discuss the following:

a) Panel/pillar dimensions

b) Production methods

c) equipment

Question 3 :

Discuss the points you would consider when selecting a production method or methods for a particular ore body. Indicate which points you consider to be the most important.

Question 4 :

An ore body is mined by shrinkage stoping from a vertical shaft. Draw one or more simple sections to show the following details:

• Ore/waste pass systems
• Stope development
• Extraction level or levels
• Sub-levels
• Slot raises

Question 5 :

In multiple level room and pillar operations what potential problems exist due to the various levels interacting with each other. What methods are available to limit the effects of this interaction?

Question 6 :

In blockel caving what are the important criteria in planning the layout of development and supervising extraction?

Question 7:

What are the implications in the mining and treatment of sulphide ore, which tends to oxidise readily? What methods could be used to mine such ores?

Question 8 :

Illustrate a modern longwall coalface including the face and a short section of the gates. Note show all equipment and label the diagram clearly.

Question 9 :

Compare and contrast room and pillar mining with longwall mining in terms of economics, safety, productivity and depth of cover.

Question 10 :

Describe a method of open stoping in detail. What are the advantages and disadvantages of open stoping over other methods of mining similar ore bodies?

Question 11 :

To be successful in Sub-level caving, careful controlled draw point mucking must be practiced. Discuss this from a point of view of:

a) An individual draw point

b) A group of closely spaced drawpoints

Question 12 :

Compare and contrast longwall advancing and retreating methods of coal mining.

Question 13 :

A retreat longwall coal mining system utilises twin accesses on both the intake and return sides of a panel whose face width is 300m. If the access drives are 5m wide and chain pillars are 20m wide between the accesses determine the extraction ratio for the following cases:

a) Panel under development

b) Panel under production

It may be assumed that rib pillars 40 m wide are left for support between panels. It can also be assumed that a barrier pillar of 40 m width is left to protect the main mine entries and that the panel length is 3km.

Question 14 :

Describe in detail one method of pillar extraction in room and pillar mining.

Question 15 :

What methods of mining can be applied to the mining of inclined ore bodies dipping in the range 30 to 60 degrees? Describe one such method in detail citing an example of its application.

Question 16 :

Backfill is becoming more widely applicable in underground mining. What methods of backfilling can be applied? Describe these in detail citing
examples of their use, advantages and disadvantages of the method.

Question 17 :

With the aid of sketches describe the mining sequence applied in a mechanised cut and fill mining operation.

Question 18 :

In relation to underground metalliferous mining define:

a) Recovery

b) Dilution

What methods of sampling are available to determine each of the above?

Question 19 :

Describe the Avoca system of Open Stoping

Question 20 :

Describe the components involved in a traditional drill and blast mining cycle and those involved in a continuous mechanised mining cycle. What advantages and disadvantages do both systems of mining have?

Question 21 :

The diagram below illustrates the amount of coal that is left intact after mining in pillars and the amount of coal that is extracted in the rooms. If a1 = 20m, a2 = 22.5 m, b1 = 5m and b2 = 4.5m determine the recovery ratio in a 2.5 m coal seam.

107_What are the important criteria in planning.png

Question 22 :

What do the terms transverse and longitudinal mean with respect to the direction of mining within an orebody?

Question 23 :

Show with the aid of diagrams the development, production and filling phases for a typical open stoping mining setup. What advantages does filling of the stope give?

Question 24 :

Define the following:

a) Stope

b) Overhand mining

c) Underhand mining

d) Extraction ratio

e) Crown pillar

f) Sill pillar

g) Ore pass

h) Waste pass

i) Raise

j) Slot raise

k) Grade

Question 25 :

Define the following terms, diagrams may help:

a) Chain Pillar

b) Barrier Pillar

c) Crown Pillar

d) Sill Pillar

What other types of pillars are commonly used in mining?

Describe a method of pillar design suitable for the design of a room and pillar mining system. What are the main factors that influence the design of such pillars?

Question 26 :

Describe with the aid of sketches the layout of a typical South African longwall gold mining system. What particular advantages does this mining method have for mining at ultra-depths?

Question 27:

Describe a highwall mining technique in detail, if possible giving details of productivity levels that can be achieved.

Question 28:

Describe the longwall top caving mining method

Question 29:

What is square set stoping?.

Question 30:

In a typical block caving operation the following levels exist:

a) Undercut level

b) Draw or production level

c) Ventilation level

d) Transportation level

Describe the operations and requirements for each of these levels, citing examples wherever possible. What factors influence the spacing between these levels?

Question 31 :

Air blasting is not uncommon in block cave mines. Describe how a typical air blast can develop. How can air blasts be minimised and what engineering controls can be applied to ensure this?

Question 32 :

To ensure continuous production from a room and pillar type operation, determine the minimum number of headings required to be operating if the production is to be undertaken using:

a) Traditional drill and blast production methods

b) Continuous miners

What methods of ore transportation are applicable with the above?

Question 33 :

Define the terms over break and under break. What methods can be used to determine these in a typical production stope and what steps can be used to minimise both?

 

Reference no: EM13708403

Questions Cloud

Estimate what is the resistivity of the material : A material is formed into a long rod with a square cross-section 0.50 cm on each side. What is the resistivity of the material
Estimate what is the emf of a batter : What is the emf of a battery with a 0.13ohm internal resistance if the battery delivers 2.5Amp to an externally connected 5.0 ohm resistor
Find at what rate will its temperature increase : In a proton linear accelerator, a 9.8mA proton current hits a target. If the target is a 1.40kg block of copper, At what rate will its temperature increase if it is not cooled
How many electrons pass a given location in the circuit : A car's starter motor draws 59A from the car's battery during startup. If the startup time is 3.5s, How many electrons pass a given location in the circuit during that time
Layout of development and supervising extraction : Discuss the points you would consider when selecting a production method or methods for a particular ore body. Indicate which points you consider to be the most important - Show by simple calculation how this can come about.
Find the minimum rope tension required to get sled moving : The coefficient of static friction between the sled and the ground is ?s = 0.627, and the kinetic friction coefficient is ?k = 0.467. what is the minimum rope tension required to get the sled moving
How long does it take for a charge : How long does it take for a charge of 4.80C to pass through the cross-sectional area of a wire that is carrying a current of 0.61A
Determine the voltage across six batteries : Assume all batteries are ideal unless told otherwise. What is the voltage across six 1.5V batteries when they are connected three in parallel with one another and this combination wired in series with the remaining three
Find at what angle will the third order be observed : The first-order line of 576 nm light falling on a diffraction grating is observed at a 12.1° angle. At what angle will the third order be observed

Reviews

Write a Review

Project Management Questions & Answers

  Determining early and late start and finish times

Determine the early and late start and finish times and the slack times for the activities. Identify the critical path.

  Computing operating cash flow for project

The applicable tax rate is 32%. What is the operating cash flow for this project?

  Critical path guarantee a successful project

Does managing to the critical path guarantee a successful project? Why or why not?

  Asthe company sproduct manager

Asthe company'sproduct manager, your boss (the marketing manager) is concerned about the future success or viability of the product line you oversee. She wants to make sure thatyou understand thereasons that could cause a popular product to become an..

  Simulation methods project risksdescribe the possible

simulation methods project risksdescribe the possible benefits to using one of the simulation methods when assessing

  Question 1 preparation is considered to be a key process in

question 1 preparation is considered to be a key process in project management. examine the key areas which form part

  Calculation of net cash flowgarfield inc is considering a

calculation of net cash flowgarfield inc. is considering a thirteen year investment project with forecasted cash

  Developer''s desire to use new languages

developer who is requesting to complete his current project using the newly-released Belchfire 500. What will your answer be, and why?

  Decision makers polarized along ethical and religious lines

The decision makers are polarized along ethical and religious lines. Since this is a potentially emotional issue, what would you do in order to break this impasse?

  Question based on project management information systems

Project Management Information Systems - Explain what is the value of providing access to documents via the Internet or a corporate intranet?

  Project manager interface between business and technology

Explain the role of a project manager as an interface between business and technology professionals in an organization.

  Why is using bayes theorem important to help answer health

why is using bayes theorem important to help answer health care administration-related questions and what does this

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd