Reference no: EM13719923
Now let's look at two specific cases of BI implementation. Remember, these cases were written by the companies supplying the "solutions", so read carefully and if possible between the lines: Konitzer, K. and Cummens, M. (2011)
CASE STUDY - Using Analytics to Improve Patient Outcomes and Billing Accuracy at Marshfield Clinic. TDWI.
Microsoft Inc. Exclusive Resorts, LLC Destination Club Generates Rapid ROI, Enhances Services, Takes Control of Business. Microsoft Case Studies.
Retrieved September 16, 2011, from There's a lot more out there in the optional and supplemental readings as well as the wide wonderful world of the Internet to give you a feel for what's working and what's not in this area; the more widely you can spread your own information gathering net, the more effective your analysis is likely to be.
When you believe you have a reasonable feel for a variety of business intelligence implementation experiences, you'll be in a position to write an effective short paper on the topic: Lessons to be learned from the Clinic and Resort cases about creating, implementing, and using business intelligence Remember, BI is a complex socio-technical innovation, so thinking about the question in socio-technical terms is likely to be of use 5 to 7 pages
Explain a health and safety plan
: Explain a health and safety plan (to prevent responder injury or illness) that includes at least three provisions to ensure personnel safety.
|
What is the required mass flow of the extraction steam
: A regenerative steam power cycle has a closed feed water heater that heats 20 kg/s of water from 100°C, 20 MPa to 250°C, 20 MPa. The extraction steam from the turbine enters the heater at 4 MPa, 275°C, and leaves as saturated liquid. What is the req..
|
Determine the turbine exit quality and the cycle efficiency
: Given a simple Rankine cycle with temperature and pressure from the boiler of 580°C, 10 MPa and a condenser pressure of 6 kPa, with the condensate exiting as saturated liquid. The isentropic efficiencies of the turbine and pump are 85% and 82% respec..
|
Prepare a strategic plan to grow the business
: Select an organization and prepare a strategic plan to grow the business over the next three years. Your strategic plan must include the following:
|
Improve patient outcomes and billing accuracy
: Improve Patient Outcomes and Billing Accuracy at Marshfield Clinic - Lessons to be learned from the Clinic and Resort cases about creating, implementing, and using business intelligence Remember, BI is a complex socio-technical innovation, so think..
|
Describe the basics of the carnot cycle of thermodynamics
: Describe the basics of the Carnot cycle of thermodynamics and it’s application to heat engines such as Diesel Engines and Gas Turbines. Describe the hot and cold sources in these prime movers
|
The istentropic efficiency of the low pressure pump
: Water is the working fluid in a regenerative Rankine cycle. Steam exits the first-stage turbine at 8 bar and its quality is 95%. 20% of that steam is extracted and diverted to an open feed water heater operating at 8 bar.
|
Determine the pressure drop across the contraction section
: Water flows at a rate of .04 m^3/s in a .12 meter diameter pipe that contains a sudden contraction to a .06 m pipe. Determine the pressure drop across the contraction section. How much of this pressure difference is due to losses and how much is due ..
|
Structure of the human resource department
: Describe the company background and the structure of the human resource department? Identify and discus the different human resource functions carried out in this organization?
|