Reference no: EM131409588
Assignment: Identifying & Analyzing Project Risks
For this assignment, you will use what you identified as your approach in this Discussion Board to identify and assess all of the risks that are associated with your project. You should identify a minimum of 8 risks then assess them by employing the techniques that you selected in the Discussion Board assignment.
For the compilation of your risk assessment component, you may use a table similar to the following:
Note: This is just a sample, and you may choose to represent it in a different format as long as you have all of the pertinent risk-related information, including the following:
• Risk name
• Risk description
• Likelihood (using a scale)
• Impact (use both as a scale and description)
Leave room to append more information later to show your mitigation strategy.
The following is an example of ranking the risks using a 2x2 risk matrix approach:
In this sample 2x2 ranking matrix, the risks that should receive the highest priority are the risks that are in quadrant 1, and the risks that will receive the least attention are in quadrant 4.
Deliverables:
The overall project deliverables are the following:
• Update the Key Assignment Document title page with a new date and project name.
• Update previously completed sections based on instructor feedback.
• Complete the New Content below, and copy it under the sections in Key Assignment Document called "Project Risks Identification" and "Project Risks Assessment":
o New Content
- Project Risks Identification
- Use the project risk categories that you brainstormed during the previous week to categorize the risks that you have determined for this assignment.
- Show a list of stakeholders and project teams that you utilized to identify risks.
- Thoroughly describe each project risk (at least 8), which includes the source for identifying the risk.
- Identify and show the specific technique that you used to identify the risks, such as cause and effect, a fishbone diagram, a SWOT analysis, interview notes, and an assumption list.
- Project Risks Assessment
- Create a table similar to the sample above, or use another method to list the risk, the likelihood of occurrence, and the overall severity of impact if it occurs.
- Fill in the table with the information from the project identification utilizing the 2 scales that you determined as a part of your Discussion Board assignment. Be sure to consider both the cost and schedule impact as you determine the overall impact.
- Rank your risks based on both the likelihood and impact using a technique, such as 2x2 matrix as shown in the assignment description section.
• Be sure to update your table of contents before submission.
What are some of signals for presence of multicollinearity
: One of the indicators that multicollinearity is present is when a variable that is known to be an important predictor ends up having a partial regression coefficient that is not significant. What are some of the other signals for the presence of ..
|
Generate a plot of absorbance
: Using the calculation you performed in your Pre-Lab in Microsoft Excel, generate a plot of absorbance @ your chosen wavelength (the wavelength that provides the best data for your purposes) vs. [indicator].
|
Test the arithmetic lag restrictions given
: Use the linear arithmetic lag given in equation (6.2). Show that this result can also be obtained as an Almon lag first-degree polynomial with a far end point constraint.
|
Explain the key principles of data security
: Recommend at least three (3) specific tasks that could be performed to improve the quality of datasets, using the Software.Development Life Cycle (SDLC) methodology. Include a thorough description of each activity per each phase.
|
Identify all of risks that are associated with your project
: For this assignment, you will use what you identified as your approach in this Discussion Board to identify and assess all of the risks that are associated with your project.
|
Would multicollinearity tend to be a problem
: In linear regression models, for what types of uses or applications would multicollinearity tend to be a problem? Are there any applications or uses for which multicollinearity would not be a problem?
|
Problem regarding the electron configuration
: A S atom has an electron configuration of 2.8.6. What is the electron configuration of an S2- ion?
|
Would multicollinearity appear to be present
: In the second analysis, the partial regression coefficient for x1 had a positive sign and the p-value associated with it was 0.39. Given these results, would multicollinearity appear to be present?
|
Elements rarely react with other elements
: A. Why do the group 8A elements rarely react with other elements? B. Why do we no longer accept Dalton"s statement that all atoms of an element must be exactly alike?
|