How you plan to monitor and control the risks

Assignment Help Software Engineering
Reference no: EM13291864

This continues the project management activities from Unit 2's Individual Project. You are still the project manager for the computer upgrades. Create a matrix that identifies, defines, and ranks the 4 risks from previous Individual Projects. It should look something like the following:

Risk

Definition

Ranking

Risk Title

Brief Definition

Ranking/Assessment

Create a 3-5 page memo to the project stakeholders, including your matrix, detailing how you plan to manage and control these risks. Your paper must include the following elements:

  • Brief responses to each risk, including how you plan to monitor and control the risks
  • Any contingency steps you identify, including any risk prevention you see available
  • How you plan to communicate projects risks to stakeholders, your project team, and those who will receive the new computer systems

The earned value management (EVM) you plan to use


Attachment:- Project.zip

Verified Expert

Reference no: EM13291864

Questions Cloud

Define the arrhenius equation to calculate the rate constant : A certain reaction has an Eact of 62.3 kj/mol (14.9 kcal/mol) and a frequency factor of 7.15X10^8LXmil-1Xsec-1. use the arrhenius equation to calculate the rate constant for this reaction at 35 degrees c
Determine auto correlation rxx for signal x : An Audio Signal s(t) generated by a loud speaker is reflected at two different walls with reflection coefficients r1 and r2. The signal x(t) recorded by a microphone to the loud speaker, after sampling is x(n) = s(n) +r1s(n-k1) + r2s(n-k2)
Find rms voltage that must be available across transformer : It is required to design a peak rectifier dc power supply(i.e. one that uses a filter capactor) that provides an average dcoutput voltage of 15V on which a maximum of ±1V ripple isallowed. The rectifier feeds a load of 150Ω.
Compute the acceleration of the object : An object starts from rest at time t = 0.00 s and moves in the +x direction with constant acceleration. compute the acceleration of the object
How you plan to monitor and control the risks : Create a 3-5 page memo to the project stakeholders, including your matrix, detailing how you plan to manage and control these risks. Your paper must include the following elements - Brief responses to each risk, including how you plan to monitor a..
Explain what would be the effect on results if methyl red : Estimate the pH range over which the color change occurs for bromocresol green. What would be the effect on your results if methyl red indicator, pKa =5.0 were used during the experiment
How would calculate the current value of a stock : How would one calculate the current value of a company like Apple? Apple did not pay a dividend from 1995-2012 which made the dividends 0 for many periods. How would calculate the current value of a stock during such periods?
What is the value of a share of diana ltd. common stock : The dividend is expected to grow at 10 percent per year for the foreseeable future. Diana Ltd. has a beta of 1.6, a standard deviation of returns of 30 percent, and a required return of 18%. What is the value of a share of Diana Ltd. common stock?
What is the largest value of r that can be used in circuit : Design a zener shunt regulator to provide an output voltage ofapproximately 10V. The supply is a 20V± 20% source andthe load current varies from 0 to 20mA. The zener availablefor use is a 1 watt zener with Vz=10.2V at Iz=20mA and rz=10Ω.

Reviews

Write a Review

Software Engineering Questions & Answers

  Draw erd to track work orders and tasks of work orders

Draw an ERD. The database should track work orders and tasks of work orders. The following detailed information requirements should be represented by the ERD.

  Design conceptual diagram to identify hardware elements

Design a conceptual diagram which identifies the hardware elements present inall computer systems and their relationships?

  Factors significant effects on initial cocomo estimate

Suggest four factors that might have significant effects on the initial COCOMO estimate and propose possible values for these factors.

  Discuss the importance of saving work

Access saves database values as they are added eliminating the need to save every time a record is added, edited, or deleted. Discuss and explain the importance of protecting your work.

  Develop flowchart to prompt user to enter sales tax rate

Develop pseudocode and flowchart for program which does the following: Prompt user to enter sales tax rate. Prompt user to enter a price.

  Analyzing project management

This solution utilizes the example of a specific project to install a complex, one hundred computer network for a corporation

  Program to convert celsius to fahrenheit

Implements a switch: Offer the user three selections, obtains the choice and show an action based on that choice. One of the actions will include an if..else.

  Design state transition diagram for member state

Design a state transition diagram which explains typical member state and how they change based on specific actions and events.

  Explaining software engineering in detail

Select a topic related to some aspect of Software Engineering. Draft a 2500+ word (minimum) paper on that topic - single spaced 12 pt times or times new roman font.

  Object oriented design for a system that contains tracks

Make an object oriented design for a system that contains tracks of your CD and DVD collection. Recognize each of the classes, associated data,and operations for the classes.

  Emergency control room for a call-logging component

Design the Requires and the Provides interfaces of at least two components that might be used in a system in an emergency control room for a call-logging component that records calls made.

  Discuss the limitations of software testing

Discuss the limitations of software testing. How do we say that complete testing is impossible?  What is Software Quality Assurance? What are the objective and goals of SQA?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd