Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A new sports car has a drag coefficient of .30 and a frontal area of 21 ft^2, and is traveling at 110 mi/h. How much power is required to overcome aerodynamic drag if p=.002378 slugs/ft^3?
Determine the actual field weight required to mix a 4 bag mix using the mix proportions given below. The excess moisture contet of the sand is 6% and that of the gravel is 2% Component Weight ..
Traction and Total Resistance, Would you please help me with the following question: A 90 tonne rear dump truck travels on an 8% grade loose gravel road.
A truck driver used sand to soak up a 1 g spill of lindane (C6H6Cl6). He placed the contaminated soil in an open drum which then filled with 150 L of water during a rainstorm. You test the water and find a concentration of 17 M/L.
A 10-mm diameter bar of 1040 carbon steel is subjected to a tensile load of 50,000 N, taking it beyond its yield point. Calculate the elastic recovery (or strain) that would occur upon removal of the tensile load.
Consider two alternative water resource projects, A and B. Project A will cost $2,533,000 and will return $1,000,000 at the end of 5 years and $4,000,000 at the end of 10 years.
Determine the magnitude of reaction at point A (in kips) of a 20' beam with 5kips at 4' of the beam and 2kips at 9' of the beam at 350lbs./ft.
A concrete mix with a 3-inch slump, w/c ratio of 0.50, and sand with a fineness modulus of 2.4 contains 1700 lb/yd^3 of coarse aggregate. Compute the required weight of coarse aggregate per cubic yard.
After falling from rest from a height of 32 m, a 0.45 kg ball rebounds upward, reaching a height of 22 m. If the contact between ball and ground lasted 1.5 ms, what average force was exerted on the ball?
find the net present worth of the project,and the internal rate of return ,and the annual worth of the project?
How do you propose to do this at the above treatment plant and estimate the head loss both immediately after backwash and 10 hours later, if the same water is applied at a rate of 2 L/s.m 2 .
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Oil of a specific gravity of 0.75 is flowing through a 6-in pipe under a pressure of 15 psi. If the total energy relative to the datumplate is 8.0 ft below the center of the pipe is 58.6 ft, determine the flow rate of the oil.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd