Problem 1: Process Analysis

You manage an assembly line consisting of 6 work stations (referred to as Work Station 1, Work Station 2, ... , Work Station 6) in series, each manned by a single worker (Alex, Barbara, Chuck, Donna, Ed, and Fran). Each unit of product is processed first at Work Station 1, then at Work Station 2, and onward through the six work stations in numerical order. For reasons not completely understood, the amount of time required to complete the work at each work station depends on which worker is assigned to that station. The following table gives the number of minutes each worker requires to complete the tasks associated with each work station.

 

Workers

  Work Stations

1

2

3

4

5

  6

Alex

  10

  35

  41

  45

  15

23

Barbara

  33

  40

  24

  19

  49

13

  Chuck

  16

  20

  39

  32

  18

48

  Donna

  47

  12

  14

  26

  44

33

Ed

  25

  43

  37

  31

  27

21

  Fran

  50

  28

  22

  11

  38

42

Therefore, if Alex is assigned to Work Station 1, he will require a total of 10 minutes to complete the tasks at that work station for every unit of product. In contrast, he will require 45 minutes if assigned to Work Station 4. Similarly, Donna will require 47 minutes if assigned to Work Station 1, but only 12 minutes if assigned to Work Station 2. Clearly, one worker must be assigned to each work station, and these assignments are considered permanent for the foreseeable future.

Assume that the system is always busy (i.e., there is always demand for this product), and there is no transient state (so, e.g., workers can stop work on a unit of product at the end of a shift and resume work at precisely the same point the next day). Also assume that no inventory is allowed between work stations; instead, workers who complete their tasks faster than the bottleneck work station accumulate idle time.

a. To which work station should each worker be assigned in order to minimize the flow time of the assembly line? What is the associated flow time?

Alex _10____ Barbara 19_ Chuck 18_ Donna 12_ Ed _21 Fran _22

Flow Time (minutes)   _81

Problem 2:

 You order two products from the same supplier. The annual demand for Product 1 is 10,000 units and the annual demand for Product 2 is 20,000 units. Note that demand for both products is constant throughout the year. The holding cost is the same for both products, $1 per unit per year. However, you incur a fixed cost of $200 each time you order Product 1, and a fixed cost of $100 each time you order Product 2. These fixed order costs are independent of the size of the order.

a. How many units of Product 1 and Product 2 should be ordered at a time in order to minimize total holding + order cost?

Product 1 :

EOQ = Sqrt (2*K*R/H) where

 R = Annual demand = 10,000

K = Order cost = $200

H = Holding cost factor = $1

EOQ (P1) = Sqrt (2*K*R/H) = SQRT(2*200*10000/1) = 2,000 Nos

Number of Units of Product 1 to Order 2000 Nos

EOQ (P2) = Sqrt (2*K*R/H) = SQRT(2*100*20000/1) = 2,000 Nos

Number of Units of Product 2 to Order 2000 Nos

b. Suppose that the supplier insists that orders for Product 1 and Product 2 be coordinated so that they can be shipped at the same time (still incurring the fixed cost of $200 and $100, respectively). Given this requirement, how many units of Product 1 and Product 2 (to the nearest integer) should be ordered at a time in order to minimize total holding + order cost? (Hint: the products must be ordered the same number of times per year)

We use Different values of K to calculate TC1 + TC2 = TC as shown below.

We observe that for No of Order = 7, Q1 = 1429 & Q2 = 2857 giving us lowest total cost of $4243.

K1

 $      200

K2

 $      100

H

 $       1

Q1

10000

Q2

20000

K

Q1

Q2

TC1

TC2

TC

1

10,000

20,000

 $  5,200

 $ 10,100

 $ 15,300

2

5,000

10,000

 $  2,900

 $  5,200

 $  8,100

3

3,333

6,667

 $  2,267

 $  3,633

 $  5,900

4

2,500

5,000

 $  2,050

 $  2,900

 $  4,950

5

2,000

4,000

 $  2,000

 $  2,500

 $  4,500

6

1,667

3,333

 $  2,033

 $  2,267

 $  4,300

7

1,429

2,857

 $  2,114

 $  2,129

 $  4,243

8

1,250

2,500

 $  2,225

 $  2,050

 $  4,275

9

1,111

2,222

 $  2,356

 $  2,011

 $  4,367

10

1,000

2,000

 $  2,500

 $  2,000

 $  4,500

11

  909

1,818

 $  2,655

 $  2,009

 $  4,664

12

  833

1,667

 $  2,817

 $  2,033

 $  4,850

13

  769

1,538

 $  2,985

 $  2,069

 $  5,054

14

  714

1,429

 $  3,157

 $  2,114

 $  5,271

15

  667

1,333

 $  3,333

 $  2,167

 $  5,500

Problem 3:

A professor holds online office hours all day Saturday and Sunday the weekend prior to final exams. He is available from 8AM to 8PM both days to answer student questions. Students who arrive while the professor is busy with another student simply wait until their turn comes up. Students are processed in the order they arrive, and all students tolerate whatever wait is necessary to get their questions answered. The professor notes from past experience that students arrive randomly with questions - the average time between arrivals is 36 minutes and the coefficient of variation of interarrival times is 1. Similarly, the time required to answer student questions is randomly distributed with an average of 24 minutes and a coefficient of variation of 1.

a. On average how long does a student have to wait to get in to see the professor?

Coeff of variation CVa = Std Dev of Interarrival time / Mean of interarrival time

As CVa = 1, It is exponential distribution.

Coeff of variation CVp = Std Dev of Processing time / Mean of Processing time = 1

Utilization U = Activity time/ Interarrival time = 24/36 = 0.67

So 1-U = 1-0.67 = 0.33

So Avge waiting time = Activity time *(U/(1-U) * (CVa^2 + CVp^2)/2

= 24*(0.67/0.33)*(1^2+1^2)/2

= 48.73 Mins

Average waiting time (minutes) 48.73 Mins

b. Suppose the professor would prefer the average waiting time to be no more than 40 minutes. By how much would the average interarrival time have to grow in order to meet this standard?

Increase in Average Interarrival Time (minutes) __________

Avge waiting time = Activity time *(U/(1-U) * (CVa^2 + CVp^2)/2

We also know that CVa & CVp are not affected by arrival or processing time.

So (CVa^2 + CVp^2)/2 = (1^1+1^1)/2 = 1 will remain same

So Avge waiting time = Activity time *(U/(1-U)*1

Or (U/(1-U) = Avge waiting time / Activity time = 40/24 = 1.67

Now Utilization U = Activity time/ Interarrival time = a/p

So 1-U = 1 - a/p = (p-a)/p

So U/(1-U) = (a/p) / [(p-a)/p] = a / (p-a)

So p/(p-a) = 1.67

Solving for p, we get p = 1.67*(p-a)

Or 0.67p = 1.67*a = 1.67*24

So p = 1.67*24/0.67 = 38.4 mins

So If interarrivakl time is 38.4 mins, Avge waiting time will be no more than 40 mins.

So Increase in Interarrivale time = 38.4-36 = 3.4 mins

c. Assume again an average interarrival time of 36 minutes and suppose the professor is considering reducing student waiting time by answering questions faster. How much faster would the professor have to answer questions in order to reduce the average waiting time to 40 minutes?

Decrease in the Average Processing Time (minutes) __________ 

Avge waiting time = Activity time *(U/(1-U) * (CVa^2 + CVp^2)/2

We also know that CVa & CVp are not affected by arrival or processing time.

So (CVa^2 + CVp^2)/2 = (1^1+1^1)/2 = 1 will remain same

So Avge waiting time = Activity time *(U/(1-U)*1= 40 mins .....(i)

Now Utilization U = Activity time/ Interarrival time = a/p = a/36

So 1-U = 1 - a/p = (p-a)/p

So U/(1-U) = (a/p) / [(p-a)/p] = a / (p-a) = a/(36-a)

So (i) become a*U/(1-U) = 40

Or a*a/(36-a) = 40

Or a^2 = 40*(36-a) = 1440 - 40*a

Or a^2 + 40*a - 1440 = 0

 Solving this, we get [-40 +Sqrt(40^2 - 4*1*(-1440))]/(2*a) = 22.90 Mins

Or [-40 - Sqrt(40^2 - 4*1*(-1440))]/(2*a) = -62.90 Mins

As Activity time can't be negative, Activity time a = 22.90 Mins

Current Activity time is 24 mins

So Decreas in processing time = 24-22.90 = 1.10 mins

d. Again assume an average interarrival time of 36 minutes and an average processing time of 24 minutes. What would be the average waiting time if the professor could clone himself (thereby creating a system with two servers and a single queue)?

For no of servers = m, U = (1/Interarrival time) / (m/activity time) = p/(a*m)

So 1-U = 1 - p/(a*m) = (a*m - p)/(a*m)

So U/(1-U) = [p/(a*m)] / [(a*m - p)/(a*m)] = p/(a*m - p)

Avge waiting time = (Activity time/m) *(U/(1-U) * (CVa^2 + CVp^2)/2

= (24/2)*(24/(2*36-24)*1

= 6 mins

Average Waiting Time (minutes) 6

Problem 4:

Susan sells snow cones from a pushcart. Snow cones come in two flavors, Redeye Raspberry (RR) and Boozy Banana (BB). Susan's cost for each cone is the same, $0.50/unit, and she charges $2.00/unit for cones of either flavor. From experience, Susan knows that the daily demand for RR cones is normally distributed with mean 100 and standard deviation 30, while demand for BB cones is normally distributed with mean 120 and standard deviation 60.

Assume that the demand for RR cones is independent of the demand for BB cones (and vice versa), and that demand in excess of supply is lost (no substitutions). Leftover snow cones are discarded at the end of the day.

a. How many RR and BB cones should be stocked at the beginning of the day to maximize Susan's expected profit? What is the expected profit of this policy?

If Susan order too few snow cones of RR, RR shortage cost Cu = Sale price - Purchase price = 2 - 0.50 = $1.50

If Susan Orders too many RR, RR overage cost Co = 0.50

So Critical ratio F(Q) = ?Cu/(Co+Cu) = 1.50 / (1.50+0.50) = 0.75

We find from Normal table that for Probability = 0.75, z = NORM.S.INV(0.75) = 0.6745

So Optimal Qty of RR cones Susan should stock Q = Mean + z*Std Dev = 100 + 0.6745*30 = 121 Cones

Similarly Optimal Qty of BB cones Susan should stock Q = Mean + z*Std Dev = 120 + 0.6745*60 = 161 Cones

Number of RR Cones 121 Cones 

Number of BB Cones 161 cones

Expected Profit = Cu*(RR+BB) = 1.50*(121+161) = $423

b. If Susan can stock no more than 250 snow cones, how many RR and BB cones should be stocked at the beginning of the day to maximize Susan's expected profit? What is the expected profit of this policy (Hint: the maximum order size makes the cost of overstocking cones of either flavor increase)?

Number of RR Cones ____________ 

Number of BB Cones ____________                  

Expected Profit ____________ 

Problem 5:

Purchasing road salt for towns in the Northeast is a challenging task. The town of Homer, New York has calculated a forecast of their annual salt needs using historical data. The forecast is summarized in the table below (Q is the quantity needed):

For example, there is a 60.6% chance they will need 50,000 tons or fewer, there is a 3.3% chance they will need exactly 100,000 tons and there is a very small chance they will need more than 200,000 tons. Suppose Homer wants to minimize the amount of inventory it purchases while at the same time having no more than a 6% change of running out of salt (which would force it to purchase salt on the spot market for a premium).

a. At the start of the season, how much salt (in tons) should Homer have available in its storage sheds? Assume salt must be purchased in increments of 10,000.

Q (ton)
(a)

Distn Fn

Density Fn
(b)

c=a*b

0

0.0%

0.0%

0

10000

9.7%

9.7%

970

20000

23.9%

14.2%

2840

30000

37.8%

13.9%

4170

40000

50.2%

12.4%

4960

50000

60.6%

10.4%

5200

60000

69.1%

8.5%

5100

70000

76.0%

6.9%

4830

80000

81.4%

5.4%

4320

90000

85.7%

4.3%

3870

100000

89.0%

3.3%

3300

110000

91.6%

2.6%

2860

120000

93.6%

2.0%

2400

130000

95.1%

1.5%

1950

140000

96.3%

1.2%

1680

150000

97.2%

0.9%

1350

160000

97.9%

0.7%

1120

170000

98.4%

0.5%

850

180000

98.8%

0.4%

720

190000

99.1%

0.3%

570

200000

99.3%

0.2%

400

 

 

Mean

53460

 

 

Std Dev

1749

Stockout Probailbiy = 6% = 0.06

So Instock Prob = 1-0.06 = 0.94

Corresponding z-stat is NORM.S.INV(0.94) = 1.5548

Z = (S-Mean)/Std Dev

So S = Mean + z*Std Dev = 53460 + 1.5548*1749 = 56179

As Order is in multiple of 10,000, So Order Qty will be 60,000

Order Quantity (tons) 60,000

b. Now suppose Homer has been offered the following deal from American Salt Mine (ASM). ASM will sell Homer salt options for $30 per option with an exercise price of $40 for each option Homer purchases in advance of the season, Homer can "exercise" an option during the season to receive one ton of salt during the season. For example, if Homer purchases 100,000 options before the season starts, then it pays ASM $30 x 100,000 = $3,000,000 for those options. As Homer needs salt during the season, ASM will deliver up to 100,000 tons for a price of $40 per ton. Options are good only for this season - any unexercised options at the end of the season have no value. Finally, if Homer exercises all of its options and still needs more salt, then it will have to purchase salt in the spot market, for an estimated $80 per ton. Given this deal, how many options should Homer purchase from ASM? Assume options must be purchased in increments of 10,000 tons.

Co = Overage Cost = Option Cost = 30

Cu = Underage cost = Mkt Price - Option excerise Cost = 80-40 = 40

So Critical Ratio F(Q) = Cu/(Co+Cu) = 40/(30+40) = 0.5714

Corresponding z-stat is NORM.S.INV(0.5714) = 0.1799

So Optimal Order Qty Q = Mean + Std Dev*z = 53460 + 1749*0.1799 = 53775 ton

So Homer should buy 60,000 Options

Problem 6: Risk Pooling

The UGA Bookstore stocks two types of cashmere sweaters. The two sweaters are identical in every way except on the first sweater is stitched UGA FOOTBALL (FF) while on the second is stitched DAWGS FOOTBALL (RF) (we'll refer to these two types as UGA sweaters and DAWGS sweaters). Both sweaters retail for $100 apiece and cost the Bookstore $40 to procure. Because the procurement lead time is long relative to the length of the football season, the Bookstore places a single order to cover anticipated sales for the entire season. Any sweaters left over at the end of the season are shipped to a reseller for $20 apiece. The demand for UGA sweaters is normally distributed with a mean of 1000 and a standard deviation of 400. The demand for DAWGS sweaters is normally distributed with a mean of 800 and a standard deviation of 300. It's been noted that in previous years when the demand for one type of sweater is high, the demand for the other type of sweater is low, leading the Bookstore to estimate the correlation between the two sweaters at -0.40.

a. How many UGA sweaters should the Bookstore order for the season to maximize expected profit? What is the expected profit?

Co = Overage Cost = Cost - Salvage = 40-20 = 20

Cu = Underage cost = Price - Cost = 100-40 = 60

So Critical Ratio F(Q) = Cu/(Co+Cu) = 60/(60+20) = 0.75

Corresponding z-stat is NORM.S.INV(0.75) = 0.6745

Expected Pooled demand = Mean(FF) + Mean(RF) = 1000+800 = 1800

Std Dev = Sqrt ((400^2 + 300^2)*(1+ Corrreation))

= Sqrt((400^2 + 300^2)*(1-0.40))

= 387.30

So Optimal Order Qty Q = Mean + Std Dev*z = 1800 + 387.30*0.6745 = 2062

Number of UGA Sweaters to Order (units) 2062

If All sweaters are Sold, Expected Profit = Cu*Q = 60*2062 = $123,720

b. How many DAWGS sweaters should the Bookstore order for the season to maximize expected profit? What is the expected profit?

Problem 7: Supply Chain Coordination

A supplier manufactures a product at cost m = $40 and sells it to a retailer at wholesale price c = $100. The retailer sells this product to consumers at retail price p = $200. The replenishment lead time for this product is long relative to the selling season, so the retailer only has one opportunity to stock the product. Demand for the product is normally distributed with a mean of 1000 units and a standard deviation of 400 units. Units unsold at the end of the season are salvaged at price v = $15.

a. How many units of the product should the retailer order to maximize  its expected profit? What is the associated retailer's expected  profit and the supplier's expected profit?

Number of Units to Order ____________

Retailer's Expected Profit ____________

Supplier's Expected Profit ____________

b. how many units of the product should the retailer order to maximize  total supply chain expected profit? What is the associated  retailer's expected profit and the supplier's expected profit?

Number of Units to Order __________

Retailer's Expected Profit ______________

Supplier's Expected Profit _____________

c. To motivate the retailer to buy more product, the supplier offers  the following deal: the wholesale price is reduced to c =  $80, but the retailer must pay the supplier an additional $40 for every  unit that it sells. The supplier is also willing to buy back units  that the retailer is unable to sell at buyback price b. These  units are then salvaged by the supplier. What value of b should the supplier offer to maximize total supply chain expected  profit? What is the associated retailer's expected profit and the  supplier's expected profit?

Optimal Buyback Price ___________

Retailer's Expected Profit _______________

Supplier's Expected Profit _

Reference no: EM13500591

Questions Cloud

What is the expected return of the put option : Harbin Manufacturing has 10 million shares outstanding with a current share price of $20 per share. In one year, the share price is equally likely to be $30 or $18. The risk-free interest rate is 5%
With what speed does the laser beam approach the earth : A starship blasts past the earth at 2.0\times 10^8\;{\rm{ {\rm m}/{\rm s}}}. With what speed does the laser beam approach the earth
Minimize the flow time of the assembly line : which work station should each worker be assigned in order to minimize the flow time of the assembly line? What is the associated flow time?
Design an iir band stop butterworth filter : Design an IIR BAND STOP Butterworth filter with the following characteristic
How many rr and bb cones should be stocked : which work station should each worker be assigned in order to minimize the flow time of the assembly line?  What is the associated flow time - How many units of Product 1 and Product 2 should be ordered at a time in order to minimize total holding +..
Design a resistive circuit with 3 or 4 nodes : Design a resistive circuit with 3 or 4 nodes, or meshes that includes one 0.1μF capacitor.
How long does the journey take according to the cosmic ray : A cosmic ray travels 60 {\rm km} through the earth's atmosphere in 420 \mu s, as measured by experimenters on the ground
Find with what speed is the flare gaining on the rocket : A solar flare blowing out from the sun at 0.90 c is overtaking a rocket as it flies away from the sun at 0.60 c. with what speed is the flare gaining on the rocket
Determine the net torque on the bar : In the picture below, a 10 kg bar 1.2 m long is set up to rotate about its center (the dark circle). Determine the net torque on the bar

Reviews

Write a Review

Operation Management Questions & Answers

  What does the product-process matrix tell us

What does the product-process matrix tell us? How should the kitchen of a Chinese restaurant be structured.

  Obtaining a measure of overall performance

Cunningham Performance Auto, Inc. modifies 375 autos per year. The manager, Peter Cunningham, is interested in obtaining a measure of overall performance.

  How much time on social media is reasonable at work

How much time on social media is reasonable at work before it becomes time wasting or a theft of the employer's time? Does your answer depend on whether the employee has met his or her goals? Does it depend on how many hours he or she has worked?

  Identifying the skills that company will need in future

How might a manager go about identifying the skills that the company will need in the future? What skills might an organization like a bank need from its employees?

  Expalin how has scope creep influenced a project on which

scope creep happens when requirements even small ones are added to a project without regard for how they affect the

  The americans with disabilities act

The Americans with disabilities act that employees make reasonable accommodations for individuals with disabilities. How might this requirement affect law enforcement offices fire fighters?

  Determine the economic order quantity

A large bakery buys flour in 25-pound bags. The bakery uses an average of 1215 bags a year. Preparing an order and receiving a shipment of flour involves a cost of $10 per order. Annual carrying costs are $75 per bag.

  Identify a process that your encounter on a daily basis

Identify a process that your encounter on a daily basis, such as a lunch cafeteria or the journey from your home to school/work.

  Define each role and discuss the fundamental differences

In organizations there are supervisors, managers and leaders. What makes them different? Define each role and discuss the fundamental differences of each. Give position specific examples to support your position.

  Find the minimum cost production plan

Given the projected demands for the next six months, prepare an aggregate plan that uses inventory, regular time, overtime, subcontract and backorders.

  What is travelers insurance companys job description

What is Travelers Insurance Company's Job Description?

  How much gravy should be ordered using a fixed order

Service level of 95%, standard deviation of 3.5 units per week, moving average weekly demand of 35 servings. Each gravy mix comes in packs of two servings. Currently three packs in inventory.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd