The process for renewing a driver's license at the Archer County Courthouse is as follows. First, the clerk fills out the application; then the clerk takes the driver's picture; and finally the typist types and processes the new license. It takes an average of five minutes to fill out an application, one minute to take a picture, and seven minutes to type and process the new license.
a. If there are two clerks and three typists, where will the bottleneck in the system be? How many drivers can be processed in one hour if the clerks and typists work at 80 percent utilization rate?
b. If 40 drivers are to be processed each hour, how many clerks and typists should be hired assuming an 80 percent target utilization rate?
calculate the start and finish times for each activity and determine the minimum number of weeks for completing the project. Find the critical set of activities for the project.
a) Find the optimal order quantity and the reorder point. b) Find the average total relevant cost (setup cost, inventory holding cost and shortage cost)
In a PERT project network, an activity has an optimistic estimate of 8 weeks, a pessimistic estimate of 24 weeks, and a most-likely estimate of 10 weeks. What is the expected time for this activity?
Analyze the case Cola Wars Continue: Coke vs. Pepsi in the Twenty-First Century from the theoretical framework.
This response states operations managements. The roles and goals of health care operations managers are discussed as well. References are included.
what is the concurrent engineering approach and why should project managers be aware of it?
Summarize the benefits of using a decision support system as discussed in the case study. Support your response.
Describe the two main types of financing that entrepreneurs may seek for their businesses. What are the risks and benefits involved with each?
The supplier quotes a price of 10 per unit. Calculate the estimated average cost per unit. Do you think $10 is too much to pay? Could the purchasing department negotiate a better price? How?
Suppose you are the manager of the office furniture department at Nebraska Furniture Mart. One of your products is a cherry study desk.
What are the managerial implications with respect to information systems?
Usage of the material during lead time is normally distributed with a mean of 42 pounds also a standard deviation of 4 pounds. When should the raw material be reordered if the acceptable risk of a stock out is 3percent.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd