A contractor brought 10,000 cubic yard of soil to site to create a ramp. The water content of the soil is 30%. According to the engineer, the soil is too wet, and should be dried to 20% water content before it can be placed and compacted. The contractor will have to leave the pile of soil at the site to get dried. If 60,000 lbs of water evaporates from the pile each day, how long the contractor will have to wait before he can place the soil?

Specific gravity of soil is 2.6, and the degree of saturation is 90%. Assume that the overall volume does not change due to drying.

Reference no: EM13564911

Questions Cloud

How many vehicles per minute must the attendant process : Vehicles begin to arrive at a remote parking lot after the start of a major sporting event. They are arriving at a deterministic but time-varying rate of "3.3-0.1t" where 't' is in minutes. the parking lot attendant processes vehicles ( collects fee ..
What is the average annual mass loading of pcb from : A lake has an area of 1000 ha. The concentration of the toxicant PCB in rainfall is 100 ng/l and the average annual rainfall is 70 cm. What is the average annual mass loading of PCB from the precipitation to the lake in kg/year.
Develop the best equipment plan for the operation : A particular project has 650,000 cubic yards of material weighing 2600 lb/cy. your company has given you up to 10 - 657G tandem powered auger loaded scrapers to use to move the material. the 657g scrapers cost 160/ea per hour to operate and maintain
Evaluate the total magnetic flux through the cylinder : A long, straight wire carrying a current of 2.00 A is placedalong the axis of a cylinder or radius 0.500 m and a length of 3.00m. Determine the total magnetic flux through the cylinder
How long the contractor will have to wait before he can : A contractor brought 10,000 cubic yard of soil to site to create a ramp. The water content of the soil is 30%. According to the engineer, the soil is too wet, and should be dried to 20% water content before it can be placed and compacted. The contrac..
Find the total magnetic flux through the cylinder : A long, straight wire carrying a current of 2.00 A is placedalong the axis of a cylinder or radius 0.500 m and a length of 3.00m. Determine the total magnetic flux through the cylinder
Determine the posted speed limit to the nearest 5 mph : A building is located 19 ft from the centerline of the inside lane of a curved section of highway whose radius is 400 ft. The road is level and e = 10. Determine the posted speed limit (to the nearest 5 mph) considering the following conditions:
Determine the improvement in efficiency and circulation rate : Now you want to improve the efficiency and circulation rate. You suggest operaing the cycle utilizing two reversible tubines with saturated vapor exit streams. All conditions remain the same except that the feed to the first turbine is steam at 450 C..
Estimate the flow rate of water required to make the outflow : A mixing chamber has two steady streams and one steady stream. The properties of the first stream is superheated steam at T1 = 400oF, h1 = 1,239 Btu/lbm and flow rate m1 = 20 lbm/h. The second stream is compressed liquid at T2 = 70oF, h2 = 38 Btu/lbm..

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  What is min sight distance that should be provided on road

f the design speed of a multi-lane highway is 60 mph, what is the minimum sight distance that should be provided on the road if (a) the road is horizontal and (b) the road has a maximum grade of 5 percent

  Calculate the maximum shear stress developed in a hollow

Calculate the maximum shear stress developed in a hollow circular shaft with the following dimensions:

  Report on separate eligible bachelors

Calculate the numbers of married men, single men, married women and single women. Print these numbers on a student summary report. If any single men are over 30 years of age, print their names and ages on a separate eligible bachelors report.

  Determine how many buses needed to provide service on route

Determine how many buses needed to provide service on the following route with the indicated characteristics: -Route length: 16 miles (one way) -Headway: 15 minutes -Average number of stops made during run, one direction: 22

  Find the maximum allowable size of thw upstream flow to be a

Water is flowing at a velocity of 10 ft/sec and a depth of 10ft in a channel of rectangular section. Find the change in depth and in absolute water level produced by

  What bulk volumes of gravel and coarse grained sand require

You are furnished with three sizes of particles. One is gravel with porosity of 0.32, the second is a coarse grained sand with porosity of 0.37, and the third is a fine grained sand with porosity of 0.23.

  Estimate energy release rate by using regression equation

A concrete building has floor area 10 m by 20 m and is 4 m high. THe building has four windows with a height 1.6 m and a width 2 m. After 10 minutes gases in the room have an average temperature of 700 degree Celcius.

  At what speed in stillwater will cavitation first occur

A sphere L ft in diameter is moving horizontally at a depth of 12 ft below a water surface where the water temperature is 50°F. v max = 1.5 V0. where V0. is the free stream velocity and occurs at the maximum sphere width. At what speed in stillwater ..

  Calculate the ph of the solution

A 1.50 L buffer solution is 0.250 M in HF and 0.250 M in NaF. Calculate the pH of the solution after the addition of 0.0500 moles of solid NaOH. Assume no volume change upon the addition of base. The Ka for HF is 3.5 x 10-4.

  Determine the volume of the spherical tank to be used

A spherical tank is being designed to hold 7 moles of methane gas at a pressure of 8 bar and a temperature of 50oF. Determine the volume of the spherical tank to be used.

  Determine the location of the hydraulic jump relative

A rectangular channel of width 12 ft has an upstream slope of 0.02 ft/ft and a downstream slope of 0.0005 ft/ft. Both reaches have lengths of 500 ft. The upstream reach has a Manning's roughness of 0.016 and the downstream reach has a roughness of 0...

  Determine the principal stresses and the principal angle

using the stress transformation quations only,given a stress state where sigma x=6500 psi,sigma y= 17,300 psi and tau xy=2900 psi, determine the principal stresses,the principal angle and the maximum shear stress.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd