A contractor brought 10,000 cubic yard of soil to site to create a ramp. The water content of the soil is 30%. According to the engineer, the soil is too wet, and should be dried to 20% water content before it can be placed and compacted. The contractor will have to leave the pile of soil at the site to get dried. If 60,000 lbs of water evaporates from the pile each day, how long the contractor will have to wait before he can place the soil?
Specific gravity of soil is 2.6, and the degree of saturation is 90%. Assume that the overall volume does not change due to drying.
f the design speed of a multi-lane highway is 60 mph, what is the minimum sight distance that should be provided on the road if (a) the road is horizontal and (b) the road has a maximum grade of 5 percent
Calculate the maximum shear stress developed in a hollow circular shaft with the following dimensions:
Calculate the numbers of married men, single men, married women and single women. Print these numbers on a student summary report. If any single men are over 30 years of age, print their names and ages on a separate eligible bachelors report.
Determine how many buses needed to provide service on the following route with the indicated characteristics: -Route length: 16 miles (one way) -Headway: 15 minutes -Average number of stops made during run, one direction: 22
Water is flowing at a velocity of 10 ft/sec and a depth of 10ft in a channel of rectangular section. Find the change in depth and in absolute water level produced by
You are furnished with three sizes of particles. One is gravel with porosity of 0.32, the second is a coarse grained sand with porosity of 0.37, and the third is a fine grained sand with porosity of 0.23.
A concrete building has floor area 10 m by 20 m and is 4 m high. THe building has four windows with a height 1.6 m and a width 2 m. After 10 minutes gases in the room have an average temperature of 700 degree Celcius.
A sphere L ft in diameter is moving horizontally at a depth of 12 ft below a water surface where the water temperature is 50°F. v max = 1.5 V0. where V0. is the free stream velocity and occurs at the maximum sphere width. At what speed in stillwater ..
A 1.50 L buffer solution is 0.250 M in HF and 0.250 M in NaF. Calculate the pH of the solution after the addition of 0.0500 moles of solid NaOH. Assume no volume change upon the addition of base. The Ka for HF is 3.5 x 10-4.
A spherical tank is being designed to hold 7 moles of methane gas at a pressure of 8 bar and a temperature of 50oF. Determine the volume of the spherical tank to be used.
A rectangular channel of width 12 ft has an upstream slope of 0.02 ft/ft and a downstream slope of 0.0005 ft/ft. Both reaches have lengths of 500 ft. The upstream reach has a Manning's roughness of 0.016 and the downstream reach has a roughness of 0...
using the stress transformation quations only,given a stress state where sigma x=6500 psi,sigma y= 17,300 psi and tau xy=2900 psi, determine the principal stresses,the principal angle and the maximum shear stress.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd