A soil sample was taken from a proposed cut area in a highway construction project and sent to a soils laboratory for a compaction test, using the Standard Proctor compaction procedure. Results of the test are as follows:
Maximum dry unit weight = 112.6 lb/ft^3
Optimum moisture content = 15.5%
The contractor, during construction of the soil embankment, achieved the following:
Dry unit weight reached by field compaction = 107.1 lb/ft^3
Actual water content = 16.0%
Determine the percent compaction achieved by the contractor.
Engineering ethics concepts and cases
In using the Darcy-Weisbach equation for flow in a pressure conduit, what percentage error is introduced in Q when f is misjudged by 20 percent?
A fluid flowing in a pipe 30cm in diameter has a uniform velocity of 4m/s. The pressure at the center of the pipe is 40KPa, and the elevation of the pipe's centerline above an assumed datum is 4.5m. Compute the total energy per unit weight of the ..
The posItIon of a particle along a straight line is given by s = (t 3 - 9t 2 + 1St) ft, where t is in seconds. Determine its maximum acceleration and maximum velocity during the time interval 0 :5: t :5: 10 s.
Writing case study about bridge collapse
Starting from x = 0 with no initial velocity, the acceleration of a race car is defined by the relation a = 6.8e- 0.00057x , where a and x are expressed in m/s 2 and meters, respectively. Determine the position of the race car when v = 30 m/s.
Develop a simple urban constructed wetland design.
A tub of a washing machine is rotating at 50 rad/s when the power is turned off. If it takes 15s for the tub to come to rest, determine (a) the constant angular deceleration, and (b) the total number of revolutions the tub makes.
Determine the corresponding error in the computed discharge
You are to design a chlorination tank for killing microorganisms in the effluent from a wastewater treatment plant. It is necessary to remove 99% of active bacteria in a wastewater flow of 120 m 3 /hr.
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Critical review the decision making of a failed major construction/property project within the UK in the last ten years.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd