Reference no: EM132189126
1. The major advantage of polycode is that it captures a great deal of information in a relatively short code.
In a hierarchical code symbols are independent of each other.
All modules of MRP II are planning tools.
The goal of aggregate planning is to satisfy demand in a way that minimizes cost.
2. The project constraint models lists which of the following as major constraints?
a. People b. Time c. Cost d. Both b and c
3. True or False ( with explanation)
Generative CAPP reduces process-planning time by almost 50%.
With generative CAPP systems, totally new process plans are created as quickly as plans similar to those for existing components.
If similar parts are being produced on the same machines, machine setup times are increased.
The structure of a polycode is like a tree.