A rectangular channel is to carry 200 cfs. The mean velocity must be greater than 2.5 fps. The channel bottom width should be about twice the channel depth. Find the channel cross section and the required channel slope.

Reference no: EM13304890

Questions Cloud

Explain how to estimate the flow rate in the cross section : The river channel itself is 20m wide and flow depth is 5m and the sandy bottom has an n=0.02, the left bank is 40m wide and the flow depth is 0.5m, while the right bank is 100m wide with a flow depth of 1m.
Identify five qualitative financial and economic assessments : Identify five qualitative financial and economic assessments specific to Gant and its industry that you shouldconsider in further analyzing Gant's liquidity.
Develop preliminary wbs for small one-story to be construct : The exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing.
Operation of ballarat trade fair consultancy : Analyse a set of data, and write a brief report (in Microsoft Word), identifying and explaining your insights into the operation of "Ballarat Trade Fair Consultancy".
Find channel cross section and the required channel slope : A rectangular channel is to carry 200 cfs. The mean velocity must be greater than 2.5 fps. The channel bottom width should be about twice the channel depth. Find the channel cross section and the required channel slope.
What will the value of each bond be : An investor has two bonds in his portfolio that have a face value of $ 1,000 and pay a 10% annual coupon. Bond L matures in 15 years, while Bond S matures in 1 year.
Determine how many different poker hands are there : A standard deck of cards contains 52 different cards. A poker hand consists of five cards, chose randomly. How many different poker hands are there
Compute minimum value of specific energy and critical depth : A rectangular channel carries a flow of 10 cfs/ft of width. Plot a curve of specific energy vs depth. Compute the minimum value of specific energy and the critical depth. What are the alternative depths for Es = 5.0
What is the total amount of deductions for and from agi : What is the total amount of deductions for and from AGI that Kim may take during the current year with respect to the condominium?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the major friction head loss for 24 inch diameter

Using darcy-weisbach equation, calculate the major friction head loss for a 24 inch diameter, 120 ft long pipe that can carry water with a flow rate of 5 cfs. Assume the temperature of water is 70 deg F and the roughness of the pipe is 0.0016 ft.

  Calculate the angles made by f with the positive x

A force is specified by the vector F= 120i-160j+80k lb. Calculate the angles made by F with the positive x-,y-, and z- axes.

  How to determine the friction force on the floor

The crate has a wieght of W = 350lb., and the coefficients of static and kinetic friction are us = 0.3 and uk = 0, respectively. Determine the friction force on the floor. Theta = 45 degrees and P = 100lb.

  Sketch and annotate the wedge described above

Sketch and annotate the wedge described above.

  Calculate the work necessary to compress air in cylinder

Calculate the work necessary to compress air in an isolated cylinder from a volume of 6 ft^3 to a volume of 1.2 ft^3. The initial pressure and temperature are 30.0 psia and 50 degree F, respectively.

  Acceleration along a pathline

The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.

  Coefficient of static friction between pacakges

The belt starts from rest at time t=0 and its speed increases at a constant rate of 150mm/s^2. Knowing that the coefficient of static friction between the pacakges..

  Is the plant in violation of the deq discharge limit

Immediately upstream of the treatment plant, the Pine River has an ultimate CBOD of 2 mg/L and a flow of 9 × 105 m3/day. At a distance of 20 km downstream of the treatment plant, the Pine River has an ultimate CBOD of 10 mg/L.

  Determine by what percentage the space mean speed

If the Greenshields model describes the relationship between speed and density on the highway, the jam density of the highway is 112 veh/mi, and the mean free speed is 64.5 mph,

  Calculate the depreciation expense of the equipment

At the end of year 1 the piece of equipment is worth $15,000 and at the end of year 2 $13,000, and at the end of the third and final year the salvage value is equal to $9,000.Applying the straight line depreciation, calculate the depreciation expe..

  Crash at a railroad crossing

Due to a crash at a railroad crossing, an overpass is to be constructed on an existing level highway. the existing highway has a design speed of 50 mi/h.

  Determine the expected speed of prototype to ensure numbers

A model of a submarine, at 1:15 scale, is to be tested at 0.8 ft/s in a wind tunnel at standard at mospheric pressure, while the prototype will be operated in seawater. Both the air and water are at 10 C (50 F).

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd