Find an open source project management tool

Assignment Help Project Management
Reference no: EM13545959

Question:

1) Identify an open source project management tool that could be used as an alternative to Microsoft Project. Try provide a critical comparison of the two tools and evaluation of the technique used = 1000 words.

2) Reflect upon the project management and teamwork required in a project. Identify key roles, responsibilities and the best practice benchmarking practices found in the literature Suggested length = 1500 words

Verified Expert

Reference no: EM13545959

Questions Cloud

What is the angular velocity and the tangential velocity : A bicycle wheel has a mass of 1.5 kg and a radius of 0.3 m. Ignore the mass of the spokes of the wheel. What is the angular velocity and the tangential velocity of the wheel after 4.0 sec
Evaluate the maximum height reached by the rocket : A rocket accelerates upwards from rest at 20 m/for 4 seconds then its engine shuts off. find the maximum height reached by the rocket
Explain when aqueous sodium hydroxide is gradually : Calcium (Ca+2) and Magnesium (Mg+2) ions are both present in seawater [Ca+2] = 0.011M and Mg+2 = 0.059 M. When aqueous sodium hydroxide (NaOH) is gradually added to the seawater, calcium hydroxide
Determine how much work has been done on the spool : A 4.00-m length of light nylon cord is wound around a uniform cylindrical spool of radius 0.500 m and mass 1.00 kg. How much work has been done on the spool
Find an open source project management tool : Identify an open source project management tool that could be used as an alternative to Microsoft Project. Try provide a critical comparison of the two tools and evaluation of the technique used.
Determine ni+2 at equilibrium and find ph at equilibrium : An excess of solid nickel hydroxide (Ni(OH)2) is added to a flask of water. Find [Ni+2] at equilibrium and find pH at equilibrium.
Solubility of a gas in water depends : Solubility of a gas in water depends on Nature of the gas - Pressure of the gas
What is the elongation of the spring : A light spring of constant k = 155 N/m rests vertically on the bottom of a large beaker of water, What is the elongation, DeltaL, of the spring
The pressure fluctuation of sound waves : The pressure fluctuation of sound waves at the closed end of a pipe vibrating at resonance is: 1. Minimum 2. 1/2 minimum 3. unchanged 4. maximum 5. 1/2 maximum

Reviews

Write a Review

 

Project Management Questions & Answers

  Computing the total cost for loan

Compute the total cost for each loan and calculate based on paying off option A in 15 years.

  Definition of quality dimensions

Provide an example of a "best buy" from your professional experience where quality aspects were not met in accordance to the text definition of quality dimensions.

  Describe the knowledge and processes areas of project

in this assignment you are to submit the powerpoint presentation for the term paper. this is the first part of your

  Show the it risk mitigation

What disadvantages might a business encounter from a locked-down IT environment, and how can these be balanced against the disadvantages of a security breach?

  Project-s critical success factors and inherent risks

Discuss the relationship between a project's critical success factors and inherent risks.

  How to submit homework how to submit homeworkhow to submit

how to submit homeworkhow to submit homeworkhow to submit homeworkhow to submit homework how to submit homeworkhow to

  Calculate project ocf

The project is estimated to generate $3,100,000 in annual sales, with costs of $990,000. If the tax rate is 35%, what is the OCF for this project

  Project management-schedule, budget, cost estimation

Prepare a project schedule in Microsoft Project 2007 and explain the rationale behind time and cost estimation methods and why you would chose one method over another

  Individual part of project team as a project manager

If you were a project manager, would you want this individual as part of your project team? What will you do to get him? How should an organization cope with this situation?

  Using the cut-and-try method for aggregate operations

Using the cut-and-try method for aggregate operations planning if the production requirement is 600 units, the demand forecast is 1,000, and the necessary safety stock is 10%

  Show the project management solution

Project Management solution - Explain what are some implications of completing a project before the scheduled completion date

  Stakeholders and accounting ethics

Mike Singletary, president of Singletary industries, wishes to issue a press release to bolster his company's image and maybe even its stock price which has been gradually falling. Who are the stakeholders in this situation?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd