Reference no: EM131132699
Write: Provide your initial post that addresses these prompts:
Explain the differences between primary and secondary sources used in research.
Identify a type of resource for your Final Research Project topic that would be considered a primary source and one that might be a secondary source, and explain why they fit in those categories.
Explain the advantages of using primary source documents in your research on your Final Research Project topic.
Review two peer-reviewed, scholarly resources from the Ashford University Library that you will use for your Final Research Project, and explain why they were chosen.
Provide full reference information of the two scholarly articles chosen in APA format at the end of your response.
Download and attach the two articles that you found from the Ashford University Library to your answer using the "Attachments: Add/Remove" function located below your response.
Support your claims with examples from required material(s) and/or other scholarly sources, and properly cite any references.
Your initial post should be at least 250 words in length.
Calculate the eac for both conveyor belt systems
: Calculate the EAC for both conveyor belt systems. Negative amounts should be indicated by a minus sign. Do not round intermediate calculations and round your answers to 2 decimal places. (e.g., 32.16).
|
Calculate the energy stored in the field
: At the instant when the magnetic field in the interior is 0.830 T, calculate the energy stored in the field.
|
Boscan corporation purchased machinery
: Boscan Corporation purchased machinery on January 1, 2014, at a cost of $326,000. The estimated useful life of the machinery is 4 years, with an estimated salvage value at the end of that period of $27,400. The company is considering different dep..
|
Uses an activityminus based costing system
: Brannon Company manufactures ceiling fans and uses an activityminus based costing system. Each ceiling fan consists of 30 separate parts. The direct material cost is $ 75 and each ceiling fan requires 3.5 hours of machine time to manufacture. Add..
|
Explain differences between primary and secondary sources
: Identify a type of resource for your Final Research Project topic that would be considered a primary source and one that might be a secondary source, and explain why they fit in those categories.
|
Compute monthly flexible budget for each increment of sale
: Prepare a monthly flexible budget for each $10,000 increment of sales within the relevant range for the year ending December 31, 2014.
|
Double-declining-balance depreciation method
: At the beginning of 2014, Robotics Inc. acquired a manufacturing facility for $12.6 million. $9.6 million of the purchase price was allocated to the building. Depreciation for 2014 and 2015 was calculated using the straight-line method, a 25-year ..
|
Discuss sleep hygiene techniques
: What has the chapter taught you about your sleep pattern (whether healthy or dysfunctional), and what steps help contribute to good sleep? Discuss sleep hygiene techniques. How would you help a client with a common sleep disorder such as insomni..
|
Determine the economic order quantity
: Determine the economic order quantity (EOQ) for spares inventory replenishment when the cost per unit is $100; the cost of preparing for a shipment and sending a truck to the warehouse is $25; the estimated cost of managing an item in the inventor..
|