Reference no: EM13557679
1. (i) Draw the framework of the Project life cycle and explain it
(ii) concepts of Business Project Management (time, cost and quality)
2. Explain in detail with charts, matrix, table wherever necessary for the following sub headings:
a) Time Management Plan using Gantt Chart showing the allocation of time for your project and
b) Prepare a matrix chart allocating people to jobs is essential.
3. Explain the work breakdown structure with a WBS Chart.
4. Prepare a cost plan showing the profit calculation and compare the cost with competitor analysis using any one of the following analyses (Payback, Period, NPV or IRR)
5. Explain the Change Management Plan and the Risk Management Plan with the help of a table.
Business Project Management
Introduction
- definition of Business Project Management (citation)
- concept of Time, Cost, and Quality (citation)
- give and explain the framework of Project Life Cycle (citation)
- Background of the coniagm and the project (should be a manufacturing company or construction company
2. Time Management Plan
- Choose one from the following:
- Gantt chart
- CPM
2 PERT
- definition of the time schedule (e.g. Gantt chart) you choose - Table or chart with detailed tasks of your project
- explanation of your table or chart
- Matrix chart allocating people of your project
3. Work Break-down Structure
- definition of Work break-down Structure - chart/table for WBS for your project
- explanation of your table/chart
4. Cost Management plan
- definition of cost estimation plan (citation) and explanation
- Table for the cost estimation plan - explanation of your table
Obtain what is the volume rate of flow
: A 6cm diameter horizontal pipe gradually narrows to 4cm. Whenwater flows throught this pipe at a certain rate, What is the volume rate of flow
|
Hypodermic syringe contains medicine with density of water
: A hypodermic syringe contains a medicine with the density of water (see figure below). The barrel of the syringe has a cross-sectional area of 2.50 x 10^-5 m2. In the absence of a force on the plunger, the pressure everywhere is 1.00 atm.
|
Compute its translational and rotational speeds
: A sphere of radius 20.0cm and mass 1.80 kg starts from rest and rolls without slippingdown a 30.0º incline that is 10.0 m long. Calculate its translational and rotational speeds when it reaches the bottom
|
Forward makes a bounce pass to the center
: In a game of basketball, a forward makes a bounce pass to thecenter. The ball is thrown with an initial speed of 4.8 m/s at an angle of 14.2° below the horizontal. It isreleased 0.67 m above the floor. What horizontal distance does the ball cover ..
|
Explain change management plan and risk management plan
: Explain in detail with charts, matrix, table wherever necessary for the sub headings Time Management Plan using Gantt Chart showing the allocation of time for your project
|
What is the minimum centripetal force needed
: A 80kg person at the fair rides the famous "spinning bottomlesscylinder", (r = 4m). what is the minimum centripetal force needed
|
Vectors representing the forces on the charge at the origin
: A particle with charge of 4 microcoloumbs is at the origin, another identical particle is placed 2 m from the origin on the positive x-axis and another 2 m on the positive y-axis. (1) Provide a sketch with vectors representing the forces on the ch..
|
Estimate the speed of the ball immediately after rebounding
: A ball having a mass of150 g strikes a wall with a speed of4.8 m/s and rebounds with only 50% ofits initial kinetic energy. What is the speed of the ball immediately after rebounding
|
Find the resulting total pressure in the vessel
: A 2L steel vessel is filled with 1.5atm of He gas at 25 degrees Celsius. Then 5 grams of O2 gas are added to the vessel at constant temperature. Determine the resulting total pressure in the vessel.
|